Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Plan Number - S09-015
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/01/2012 | CAGUILA1 | START | PLANS SUBMITTED | Completed | |
03/01/2012 | JWILLIA4 | PIMA COUNTY | ADDRESSING | Approved | AUDREY FARENGA ADDRESSING REVIEW PH #: 740-6800 FAX #: 623-5411 TO: CITY PLANNING FROM: AUDREY FARENGA, ADDRESSING REVIEW SUBJECT: S09-015 SILVERBELL CROSSING/REVISED FINAL PLAT DATE: March 1, 2012 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through Pima County Addressing. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** |
03/09/2012 | DAVID RIVERA | ZONING | REVIEW | Approved | |
03/12/2012 | JWILLIA4 | PIMA COUNTY | WASTEWATER | Approved | PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT 201 NORTH STONE AVENUE TUCSON, ARIZONA 85701-1207 JACKSON JENKINS PH: (520) 740-6500 DIRECTOR FAX: (520) 620-0135 March 12, 2012 To: Paul Nzomo, PE, Project Manager Coronado Engineering & Development, Inc. Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department From: Kristin L. Greene, P.E., Civil Eng. Manager RWRD, Development Review Manager Subject: A Resubdivision of Silverbell Crossings Lots 1 – 143 and Common Areas “A” – “D” Final Plat – 3rd Submittal, review comments The drawings of the Final Plat for the proposed project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD). This review letter may contain comments pertaining to the concerns of either Department. PCRWRD hereby approves the above referenced submittal of the Final Plat received by us on March 1, 2012. Please note the following: Conditional approval of the above referenced submittal does not authorize the construction of public or private sewer collection, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval to Construct) will need to be obtained from PDEQ. Also, air quality activity permits must be secured by the developer or prime contractor from PDEQ before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above comments, please do not hesitate to contact me. Kristin L. Greene, P.E. Civil Engineering Manager, Development Liaison Unit Cc: Chad Amateau, P.E., RWRD Chandubhai Patel, P.E., RWRD Project file |
03/15/2012 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approv-Cond | DATE: March 15, 2012 TO: Patricia Gehlen; CDRC Coordinator SUBJECT: Silverbell Crossings Final Plat 3rd submittal Engineering Re-review REVIEWER: Elizabeth Leibold ACTIVITY NUMBER: S09-015, (old case number: S04-188) SUMMARY: The revised Final Plat and assurance documentation were reviewed by Planning & Development Services Department Engineering Division. Approval is provided with the following condition applied to the Final Plat at mylar stage. FINAL PLAT COMMENTS: 1) DS Sec.2-03.6.4.F: On mylar submittal, provide datum for minimum FFE data provided on the Final Plat. If you have questions or would like to schedule the meeting, call me at 837-4934. Elizabeth Leibold, P.E., CPM, CFM Civil Engineer Engineering Division Planning & Development Services Dept |
03/19/2012 | PGEHLEN1 | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: Silverbell Crossing Replat Lots 1-143 S09-015 Tucson Electric Power Company (TEP) has received the final plat submitted for review on March 1, 2012. TEP is unable to approve the plat until a preliminary electrical design has been completed and approved by the developer. If you have any questions, please let me know. Thank you, Mary Burke Right of Way Agent Tucson Electric Power Company Mail Stop HQW603 PO Box 711 Tucson, AZ 85702 520-917-8744 Office 520-401-9895 Cell mburke@tep.com |
03/19/2012 | PGEHLEN1 | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: Silverbell Crossing Replat Lots 1-143 S09-015 Tucson Electric Power Co. (TEP) approves the final plat submitted for review March 1, 2012. Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission. If you have any questions, please let me know. Thank you, Mary Burke Right of Way Agent Tucson Electric Power Company Mail Stop HQW603 PO Box 711 Tucson, AZ 85702 520-917-8744 Office 520-401-9895 Cell mburke@tep.com |
09/18/2012 | JOHN WILLIAMS | ZONING-DECISION LETTER | REVIEW | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES March 20, 2012 Paul Nzomo Coronado Engineering & Development Inc. 4007 E. Paradise Fall Dr. #125 Tucson, Arizona 85712 Subject: S09-015 SILVERBELL CROSSING Final Plat Dear Paul: Your submittal of March 24, 2011 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a set of 3 DETAILED cover letters explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 3 Copies Revised Final Plat (Engineering, TEP, PDSD) Should you have any questions, please call me at 837-4893. Sincerely, John Williams Planning Technician All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: (520) 722-5394 |
09/18/2012 | JOHN WILLIAMS | ZONING-DECISION LETTER | REVIEW | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES *** REVISED *** July 19, 2012 Paul Nzomo Coronado Engineering & Development Inc. 4007 E. Paradise Fall Dr. #125 Tucson, Arizona 85712 Subject: S09-015 SILVERBELL CROSSING Final Plat Dear Paul: The above referenced project has been CONDITIONALLY APPROVED by the Community Design Review Committee. Please make any necessary corrections and submit the following documents: 1 Executed Final Plat Double Matte Océ or Photo Mylar. 2 Title reports current within the last thirty (30) days. 1 Check made payable to "Pima County Recorder" in the amount of $20.00 per plat page plus a $4.00 handling fee, along with CC&R fees if applicable. CC&R fees are $9.00 for the first 5 pages and $1.00 for each additional page and fees for consent(s) to dedicate, if applicable. 1 Original Set of Executed and notarized CC&R's document (if applicable) and Assurance Package (if applicable). 1 Copied Set of Executed and notarized CC&R's document (if applicable) and Assurance Package (if applicable). 1 CD with Digital Copy in PDF Format of Plat, CC&R's (if applicable) and Assurances (if applicable). Assurances (if applicable) must be reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CC&R's and assurances must be approved at the same Mayor and Council Meeting. Please expect 5-6 weeks from the date submitted to the date scheduled for Mayor and Council approval. Should you have any questions, please call me at 837-4893. Sincerely, John Williams Planning Technician All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: (520) 722-5394 |