Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S08-135
Parcel: Unknown

Review Status: Completed

Review Details: ASSURANCES

Plan Number - S08-135
Review Name: ASSURANCES
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/27/2009 PATRICIA KRAUSMAN START ASSURANCES RECEIVED Completed
02/10/2009 LAITH ALSHAMI ENGINEERING REVIEW Approv-Cond Laith Alshami, Engineering and Floodplain Review, 02/10/2009,


TO: Patricia Gehlen FROM: Laith Alshami, P.E.
CDRC Engineering


SUBJECT: Mountain Vail Estates, Phase II, Lots 136 - 501
S08-135, T15S, R16E, SECTION 31
Reference S07-110

RECEIVED: Final Plat, CC & R's and Title Report on December 02, 2008

The subject submittal has been reviewed. Engineering and Floodplain review recommends conditional approval subject to the including the following information on or with the Final Plat Mylar:

Final Plat:

1. Add a Beneficiary Block as required by D.S. 2-03.6.3.C.
2. Show required setback from detention/retention basins as required by (D.S. 2-03.6.4.E.). The setback will ensure that no buildings will be built adjacent to the basins in the future.

CC & R's:

Submit a revised CC & R's document in accordance with the following comments:

1. It appears that Sections 7.5, 7.6, and 10.1 have been numbered incorrectly in the Table of Contents.
2. Provide the complete project title on Page #1 (i.e. Mountain Vail Estates)
3. Why do we have two trust numbers on Page #1?
4. Exhibit "A" page should be either numbered or removed.

Assurances:

Provide an original and complete assurances package that complies with the following requirements:

1. Ensure that the Trust number matches the trust number information on the Final Plat and the CC & R's.
2. Remove the reference to the year 2008 where the new Year 2009 is needed.
3. Include the "Trust Agreement" in the Assurances Package.
4. Include the "Special Warranty Deed" in the Assurances Package.
5. Include in the Assurances Package an up to date Title report.
6. Ensure that the assurance package documents are accurate and complete. Inaccurate and incomplete package might delay the processing of the final plat mylar and assurances.


Submit a complete copy of the assurances for review.

RESUBMITTAL REQUIRED: Revised Final Plat Mylar, CC & R's and assurances