Plan Number: S08-087
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL-FINAL PLAT - CONDO CONVERSION

Plan Number - S08-087
Review Name: RESUBMITTAL-FINAL PLAT - CONDO CONVERSION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2009 BRAMIRE1 CC&R CC&R's Denied See Engineering comments.
01/12/2009 FERNE RODRIGUEZ PIMA COUNTY WASTEWATER Denied December 11, 2008

To: DAN CASTRO
RICK ENGINEERING

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

From: Chandubhai C Patel, P.E., Civil Eng. Manager
Development Review Division (Wastewater)

Subject: ROCKEFELLER GROUP DISTRIBUTION CENETR, FINAL CONDOMINIUM PLAT, UNITS 101 THRU 106, COMMON ELEMENTS “A-1” THRU “A-2”, “B-1 THRU B-3”, LIMITED COMMON ELEMENTS “C-1 THRU C-6” & “D-1” THRU “D-12”
Final Plat – 2nd Submittal
S08-087


The drawings for the Final Plat of the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

Obtain a letter from the PCRWRD's Capacity Management Section, written within the past 90 days, stating that the treatment and conveyance system capacity for the project is available in the downstream public sewerage system and provide a copy of that letter to this office. The required form to request such a letter may be found at:

http://www.pima.gov/wwm/forms/docs/CapResponseRequest.pdf.

The site plan and consequently the Final Plat for this project cannot be approved until a copy of this letter has been received by this office.

The Site Plan for this development has not been submitted to us for our Review and Approval. The Final Plat cannot be approved by us unless we have reviewed and approved the Site Plan. Please formally submit to us the Site Plan with applicable fees.

Please do not hesitate to call us if you have any questions.
01/14/2009 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

January 14, 2009

Dan Castro
Rick Engineering Company, Inc.
1745 East River Road, Suite 101
Tucson, Arizona 85718

Subject: S08-087 Rockfeller Group Industrial Final Plat

Dear Dan:

Your submittal of November 24, 2008 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and 3 sets of the DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

3 Copies Revised Final Plat (Wastewater, Engineering, DSD)

2 Copies Assurance Package (Engineering, DSD)

2 Copies CC&R's (Engineering, DSD)

2 Copies Approved Site Plan (Wastewater, DSD)


Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 322-6956
fpresubmittal
11/24/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
12/03/2008 STEVE SHIELDS ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: Steve Shields
Lead Planner

PROJECT: Rockefeller Group Industrial - Condo Conversion - Final Plat
S08-087
Final Plat (2nd Review)

TRANSMITTAL DATE: December 3, 2008

DUE DATE: December 23, 2008

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. The Zoning Review Section conditionally approves the final plat for this subdivision, subject to the following changes on the executed final plat. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements

2. Provide a letter from the property owner stating they are aware of the requirements of LUC sections 4.1.9.2 and will comply as required by the State of Arizona Department of Real Estate.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C\planning\cdrc\finaplat\S08-087fp-2nd.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat, and additional requested documents.
12/03/2008 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Gary Ault, Mapping Supervisor
Pima County Assessor’s Office
Mapping Department

DATE: 11/28/08


RE: Assessor’s Review and Comments Regarding Final Plat S08-087, Rockefeller Group Industrial, T15S-R14E-16.


* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor’s Office requirements.
_______ Plat does not meet Assessor’s Office requirements.


COMMENTS: Thank you for your submittal.

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
12/11/2008 ANDY STEUART COT NON-DSD REAL ESTATE Approv-Cond Request recording information be annotated on Sht. 2 of 3 for sewer and T.E.P. easements.
12/22/2008 BIANCA RAMIREZ ENGINEERING REVIEW Denied CDRC Package given to Bianca Rameriz to work on. She will post comments under her name.
12/22/2008 BIANCA RAMIREZ ENGINEERING REVIEW Denied DATE: December 22, 2008
SUBJECT: Rockefeller Group Industrial Condominium Conversion Final Plat Submittal- Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 6850 S Brosius Ave, T13S R14E Sec 35 Ward 2
REVIEWERS: Bianca Ramirez, CFM
ACTIVITY: S08-087 (Second Review)


SUMMARY: Engineering Division of Development Services Department has received, Sheet 1, 2 and 3 of the proposed Final Plat, a copy of the CC&R's and a copy of the Title Report. Engineering Division has reviewed the submitted Final Plat, CC&R's and Title Report and does not recommend approval of the Final Plat at this time. The following items need to be addressed:


FINAL PLAT COMMENTS:

1) Site and Grading Plan approved. Complied.

2) Complied

3) DS Sec.2-03.6.1.H.1: Revise the title block on the proposed Final Plat and/or all applicable wording in the CC&R's to match each other. All names, common elements, limited common elements, and descriptions must have the same wording in the CC&R's as in the Title Block. Provide a clear definition of each Common Element and Limited Common Element within the Title Block.

Response: Revise title block to include the description of each element. Include the common elements and limited common elements listed to the left side of title block within the title block. Verify that the revisions made to the title block are also made where the information is described in other areas such as CC&R's, Exhibits, ect.

4) Complied

5) Acknowledge no rezoning case. Complied.

6) DS Sec.2-03.6.4.A: Revise the Final Plat to include the recordation information for all proposed public easements that are depicted on the plat. Final Plat can not be approved prior to the recording and posting of these easements.

Response: Acknowledge. However, the Final Plat Mylar must include the recordation information for all proposed easements that are depicted on the plat. Final Plat cannot be approved until all of the easements have been recorded and identified on the Final Plat.

7) DS Sec.2-03.6.4.C: Revise the Final Plat to clearly enclose with a solid line each common element, specifically Common Element B that surrounds the Retention/Detention Basin area. The surveyable lines for the basin are required but the closed lines exclude the rest of the area that is adjacent to the basin and does not clearly label it as Common Element B.

Response: Clearly identify common elements within the title block and within the CC&R's. In addition, clearly identify limits of each of the elements. Specifically, use call outs to identify elements throughout the Final Plat so that it is clear as to the limits of each element

8) Complied.

9) Complied.

10) Complied

11) Complied

12) Complied

13) DS Sec.2-03.6.6: A final signed original copy of the CC&Rs is required for approval of the Final Plat. The Final Plat can not be approved prior to original CC&Rs being submitted and approved.

Response: A final signed original copy of the CC&R's is still required for the approval of the Final Plat. The Final Plat cannot be approved prior to original CC&R's being submitted and approved.

14) DS Sec.2-03.6.6.A: Revise the CC&R's to accurately reflect all of the proper common elements labels and responsibility for maintenance and liability for any proposed commonly-owned elements. Revise the following information within the CC&R's:

a) Revise to accurately describe the property (Name, number of units, common elements, limited common elements, with descriptions) per the Title Block. Either the CC&Rs or the Title Block must be revised and must match with exact wording for the name and all Elements.

b) Complied

c) Provide both Exhibit A and B within the CC&Rs. All exhibits must be provided in order for the CC&Rs to be a complete package.

Response: Exhibits should be numbered in A-1 for Exhibit A and B-1 for Exhibit B.

15) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until Financial Assurances are submitted and approved. Since this project does not have an approved site plan or grading plan and the improvements have yet to be constructed Financial Assurances are required.

Response: The Final Plat Mylar Package cannot be scheduled for Mayor and Council consideration until the complete Financial Assurance Package is submitted and approved. Provide the following information with the Final Plat Mylar submittal to assure that the Financial Assurances are complete and ready for forwarding to the City Attorney's Office:
a) A copy of the original TRUST AGREEMENT.
b) Original signed and notarized AGREEMENT TO CONSTRUCT SUBDIVISION IMPROVEMENTS / THIRD PARTY TRUST. Revise to show the correct name of the Subdivision with Lot Numbers per the Title Block;
c) Provide Exhibit "C" (Trust Agreement) per Section 9;
d) Assure that all exhibits are correctly placed/attached, and the case number "S08-087" is at the top of the first page of the AGREEMENT TO CONSTRUCT, EXHIBIT B in the AGREEMENT TO CONSTRUCT, and AMENDMENT TO TRUST,
e) Provide Title Report. The Title Report should be current with 30 days of recordation; of the proposed plat ;
f) Provide a copy of a sample Warranty Deed;
g) An 8 ½" by 11" location map.

16) Additional comment: Due to the Financial Assurances submitted for review and the Trust Agreement and Trust Number, 18207-T, shown the Dedication Section on Sheet 1 of the Final Plat must be revised to reflect the Trust Officer and Beneficiary.

a) DS Sec. 2-03.6.3.B.4: Revise the plat to add the signature lines for all property owners. The number of signatures depends on the number of persons who have fee title interest according to the Title Report current within 30 days of the recordation of the proposed plat.
b) DS Sec. 2-03.6.3.C: Provide the required Beneficiary Block on the Title Page to read; "The Beneficiary of (Title Company Name and Trust Number) is (Name and Address)."
17) Additional comments may be forthcoming.

GENERAL COMMENTS:

Provide the last approved site plan, approved grading plan, a revised Final Plat, a revised original CC&R package and a Financial Assurance Package at re-submittal.

The revised Final Plat, CC&Rs and Assurance Package must address the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments.

Further comments may be generated upon re-submittal of the Final Plat, CC&Rs and Assurance Package.

If you have any questions or would like to schedule a meeting, I can be reached at 837-4928.



Bianca Ramirez, CFM
Engineer Associate
Engineering Division
COT Development Services