Plan Number: S08-087
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - CONDO CONVERSION

Plan Number - S08-087
Review Name: FINAL PLAT - CONDO CONVERSION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/08/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
07/14/2008 DAVID MANN COT NON-DSD FIRE Approv-Cond Street on South Side should be Aragon.
07/14/2008 RONALD BROWN ZONING HC SITE REVIEW Passed This plat is for NEW buildings and final approved site plan and construction documents will address IBC/ICC requirements.

Indicate on cover page that this plat is for new construction and that construction documents will address full compliance with the IBC and ANSI.
07/17/2008 STEVE SHIELDS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: Steve Shields
Lead Planner

PROJECT: Rockefeller Group Industrial - Condo Conversion
S08-087
Final Plat (1st Review)

TRANSMITTAL DATE: July 17, 2008

DUE DATE: August 05, 2008

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. Section 4.1.7.1, LUC, permits a maximum of one year from the date of application to obtain approval of a plat. If, at the end of that time, the plat has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this tentative plat is July 9, 2009.

2. Provide a copy of the last approved site plan.

3. D.S. 2-03.6.1.K Place the S08-087 subdivision case number assigned to the plat in the lower right hand corner of the plat next to the title block.

4. D.S. 2-03.6.3.D In the Approval block revise the word "CERTIFIES" to read "CERTIFY".

5. Provided documentation that supports how this condo conversion meets the requirements of LUC Section 4.1.9.2.

6. Provide a matrix that shows the cubic air volumes for each condo.

7. Provide a matrix that defines each common and limited common element.

8. D.S. 2-03.6.6 Add "RECITALS" to the TABLE OF CONTENTS of the Declaration of Condominium.

9. D.S. 2-03.6.6 Add "ARTICLE 4 ALLOCATION OF INTERESTS AND VOTING RIGHTS" to the TABLE OF CONTENTS of the Declaration of Condominium.

10. D.S. 2-03.6.6 Add "6.3 Prohibited Uses" to the TABLE OF CONTENTS of the Declaration of Condominium.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C\planning\cdrc\finaplat\S08-087fp.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat, and additional requested documents.
07/21/2008 FRODRIG2 PIMA COUNTY WASTEWATER Denied July 18, 2008


To: DAN CASTRO
RICK ENGINEERING

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

___________________________
From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environment Quality

Subject: INDUSTRIAL CENTER TUCSON AIRPORT CONDOMINIUM UNIT 101-106, COMMON AREAS "A" & "B"
Final Plat - 1st Submittal
S08-087


The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

We will need to see a site plan or tentative plat showing how the condominiums are to be sewered.

This office will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents.

Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the final plat. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet.

The next submittal of this project will be the second (2nd) submittal. A check for the review fee of this submittal in the amount of $100.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of bluelines and response letter.

If the number of sheets changes, please adjust the review fee accordingly.


If you have any questions regarding the above-mentioned comments, please contact me.
07/21/2008 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: ROCKEFELLER GROUP INDUSTRIAL

S08-087



Tucson Electric Power Company has reviewed and approved the Final Plat
submitted for review July 10, 2008.



In order to apply for electric service, call the New Construction
Department at (520) 770-2062. Submit a final set of plans including
approved site, offsite and electrical load plans. Include a CD with the
AutoCAD version of the plans. If easements are required, they will be
secured by separate instrument.



Please call me at (520) 917-8745, should you have any questions.


Liza Castillo, Right of Way Agent II
Tucson Electric Power Co.
Unisource Energy Services
offc-(520) 917-8745
fax-(520) 545-1416
lcastillo@tep.com
07/22/2008 PGEHLEN1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved
07/23/2008 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Approved
08/01/2008 JASON GREEN ENGINEERING REVIEW Denied DATE: August 1, 2008
SUBJECT: Rockefeller Group Industrial Condominium Conversion Final Plat Submittal- Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 6850 S Brosius Ave, T13S R14E Sec 35 Ward 2
REVIEWERS: Jason Green, CFM
ACTIVITY: S08-087


SUMMARY: Engineering Division of Development Services Department has received, Sheet 1, 2 and 3 of the proposed Final Plat, a copy of the CC&R's and a copy of the Title Report. Engineering Division has reviewed the submitted Final Plat, CC&R's and Title Report and does not recommend approval of the Final Plat at this time. The following items need to be addressed:


FINAL PLAT COMMENTS:

1) The Final Plat Condominium Conversion can not be approved until Site Plan and Grading Plan approval. The associated Site Plan (T08CM00528) and Grading Plan (T08BU00855) have yet to be approved by Development Services therefore the Final Plat could not be shown to be in conformance with building locations, basin dimensions, Vehicular Use Areas, etc. The Final Plat must reflect any required changes from the Site Plan and Grading Plan comment letters that have been posted under separate reviews.

2) DS Sec.2-03.6.1.E: Revise Sheet 1 to include an index of all sheets included with the Final Plat submittal, or provide a small index drawing of the site showing the area represented on each sheet.

3) DS Sec.2-03.6.1.H.1: Revise the title block on the proposed Final Plat and/or all applicable wording in the CC&R's to match each other. All names, common elements, limited common elements, and descriptions must have the same wording in the CC&R's as in the Title Block. Provide a clear definition of each Common Element and Limited Common Element within the Title Block.

4) DS Sec.2-03.6.1.K: Revise the Final Plat to indicate the subdivision cases number assigned (S08-087) where indicated by "S08-", it may be added to the lower right hand corner of the plans on all sheets.

5) DS Sec.2-03.6.2.I: Provide the following note on the Final Plat (if the subdivision is the result of a rezoning case); "Any relocation, modification, etc., of existing utilities and/or public improvements necessitated by the proposed development will be at no expensive to the public."

6) DS Sec.2-03.6.4.A: Revise the Final Plat to include the recordation information for all proposed public easements that are depicted on the plat. Final Plat can not be approved prior to the recording and posting of these easements.

7) DS Sec.2-03.6.4.C: Revise the Final Plat to clearly enclose with a solid line each common element, specifically Common Element B that surrounds the Retention/Detention Basin area. The surveyable lines for the basin are required but the closed lines exclude the rest of the area that is adjacent to the basin and does not clearly label it as Common Element B.

8) DS Sec.2-03.6.5.A: Revise the Final Plat to indicate primary control points, or descriptions and ties to such control points, to which all dimensions, angles, bearings, and similar data on the plat will be referred. Specifically, at least one (1) corner of the subdivision must be tied by course and distance to the section corner or the quarter section corner shown on the Final Plat that was used to establish the basis of bearing. The plat must include an accurate description of that corner marker and an indication of how the bearings were determined. Corner tie recordation information is to be provided on the plat. The Found Brass disc must be clearly described.

9) DS Sec.2-03.6.5.C.1.a: Revise General Note # 5 the Basis of Bearing Section to include the recordation information of the referenced subdivision of Airport Commerce Center Lots 1thru 81.

10) DS Sec.2-03.6.5.C.4: Revise the Final Plat to fully describe the found brass disc at the intersection of Brosius and Medina Road. If the corner tie information is measured from this point the monument must be fully described and show all markings on the found monument.

11) DS Sec.2-03.6.5.C.5: Revise the Final Plat to clearly indicate whether the distance and bearings between monuments were measured or calculated for all property line boundary information. The legend shows the symbols used for measured, calculated or recorded, but these are not clearly shown on Sheet 2 with the provided dimensions, revise.

12) DS Sec.14.3.2: Provide a note on the Final Plat stating that, (a) the owner or owners shall be solely responsible for operation, maintenance, and liability for drainage structures and retention basin; (b) that the owner or owners shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for the drainage and retention facilities at lease once each year, and that these regular inspection reports will be on file with the owner for review by City staff, upon written request; (c) that City staff may periodically inspect the drainage and retention facilities to verify that scheduled and unscheduled maintenance activities are being performed adequately; and (d) that the owner or owners agree to reimburse the City for any and all costs associated with the maintaining of the drainage and retention facilities, should the City find the owner or owners deficient in their obligation to adequately operate and maintain their facilities."

13) DS Sec.2-03.6.6: A final signed original copy of the CC&Rs is required for approval of the Final Plat. The Final Plat can not be approved prior to original CC&Rs being submitted and approved.

14) DS Sec.2-03.6.6.A: Revise the CC&R's to accurately reflect all of the proper common elements labels and responsibility for maintenance and liability for any proposed commonly-owned elements. Revise the following information within the CC&R's:

a) Revise to accurately describe the property (Name, number of units, common elements, limited common elements, with descriptions) per the Title Block. Either the CC&Rs or the Title Block must be revised and must match with exact wording for the name and all Elements.

b) DS Sec.14.3.2: Provide a note in the CC&Rs under Article 7, page 17 stating that, (a) the owner or owners shall be solely responsible for operation, maintenance, and liability for drainage structures and retention basin; (b) that the owner or owners shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for the drainage and retention facilities at lease once each year, and that these regular inspection reports will be on file with the owner for review by City staff, upon written request; (c) that City staff may periodically inspect the drainage and retention facilities to verify that scheduled and unscheduled maintenance activities are being performed adequately; and (d) that the owner or owners agree to reimburse the City for any and all costs associated with the maintaining of the drainage and retention facilities, should the City find the owner or owners deficient in their obligation to adequately operate and maintain their facilities."

c) Provide both Exhibit A and B within the CC&Rs. All exhibits must be provided in order for the CC&Rs to be a complete package.

15) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until Financial Assurances are submitted and approved. Since this project does not have an approved site plan or grading plan and the improvements have yet to be constructed Financial Assurances are required.


GENERAL COMMENTS:

Provide the last approved site plan, approved grading plan, a revised Final Plat, a revised original CC&R package and a Financial Assurance Package at re-submittal.

The revised Final Plat, CC&Rs and Assurance Package must address the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments.

Further comments may be generated upon resubmittal of the Final Plat, CC&Rs and Assurance Package.

If you have any questions or to schedule a meeting I can be reached at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Development Services
08/01/2008 KAY MARKS PIMA COUNTY ADDRESSING Approv-Cond 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207


JENNIFER STEPHENS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: JENNIFER STEPHENS, ADDRESSING OFFICIAL
SUBJECT: S08-087 ROCKEFELLER GROUP INDUSTRIAL/FINAL PLAT
DATE: 7/29/08



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.

NOTE: APPROVED: ON FINAL MYLAR:

Change Elvira Road to Aragon Road on pg. 2.





***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through Pima
County Addressing. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***
08/04/2008 ED ABRIGO PIMA COUNTY ASSESSOR Approv-Cond Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Gary Ault, Mapping Supervisor
Pima County Assessor’s Office
Mapping Department

DATE: August 1, 2008


RE: Assessor’s Review and Comments Regarding Final Plat
S08-087 Industrial Center Tucson Airport Condominiums T151416

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor’s Office requirements.
_______ Plat does not meet Assessor’s Office requirements.


COMMENTS: Thank you for your submittal. Per phone conference with Mr. Juan Guerrero the following items will be added/corrected before the recordation of this plat:
Rockefeller or Rockefeller Group will be added to the title blocks.
The line for the retention/detention basin will be dashed so it won’t look like a parcel separate from Common Area “B”.
If there are any questions, please contact Susan King at 740-4391.

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.




Susan King
08/05/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

August 5, 2008

Dan Castro
Rick Engineering Company, Inc.
1745 East River Road, Suite 101
Tucson, Arizona 85718

Subject: S08-087 Rockfeller Group Industrial Final Plat

Dear Dan:

Your submittal of July 10, 2008 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

6 Copies Revised Final Plat (Real Estate, Zoning, Wastewater, Engineering, Assessor ,DSD)

3 Copies Assurance Package (Engineering, DSD)

2 Copies LUC Affidavit (Zoning, DSD)

3 Copies CC&R's (Zoning, Engineering, DSD)


Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 322-6956
fpresubmittal
08/05/2008 ANDY STEUART COT NON-DSD REAL ESTATE Denied Request the following be considered for change:
-To Sht. 2 of 3, Elvira Road changed to Aragon Road.
-To Sht. 1-3, fill in "S08-___" with "S08-087".
-To Sht. 2 of 3, fill in recording information in the blanks for the Water and Sewer easements.