Plan Number: S08-045
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT PACKAGE

Plan Number - S08-045
Review Name: FINAL PLAT PACKAGE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/20/2009 JWILLIA4 START FINAL PLAT PACKAGE Completed
12/09/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed 20Nov09 - pre engineering review -

1. Orignal CC&R's are needed.
2. The language in the Title block on CC&R's do not match the language in the Title block of the Mylar.
3. Complete the blanks on page 5 of the CC&R's.
4. Page 28 of the CC&R's is missing.
5. The seals on the Mylar are smugged.
6. The "per this plat" as requested by zoning was not completed. Zoning's comment, 'Thank you for the loading zone easement. On sheet 2, next to the loading zone easement notation, please add the words "per this plat".'
12/09/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed Left with engineering reviewer 20Nov09 to complete review.
12/09/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed To: Patricia Gehlen DATE: December 9, 2009
CDRC/Zoning Manager FROM: Paul Machado
Engineering Division
SUBJECT: P3 Condos., 3150 N. Freeway Industrial Loop
Final Plat S08-045 (Fourth Review)
T13S, R13E, Section 34

RESUBMITTAL REQUIRED: Final Plat.

The Final Plat (FP) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Final Plat:

1. Please include a detailed response letter to the comments along with the corrected copies of the FP. The FP will not be accepted for re-submittal if the response letter detailing how the corrections were addressed is not included in the re-submittal. Per previous comment.
2. Orignal CC&R's are needed.
3. The language in the Title block on CC&R's do not match the language in the Title block of the Mylar.
4. Complete the blanks on page 5 of the CC&R's.
5. Page 28 of the CC&R's is missing.
6. The "per this plat" as requested by zoning was not completed. Zoning's comment, 'Thank you for the loading zone easement. On sheet 2, next to the loading zone easement notation, please add the words "per this plat".'


If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4932 office
(520) 879-8010 fax
C:/3150 N. Freeway Industrial Loop_FP_Condo 4
12/09/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed An original and complete CC&R package was delived to the CDRC office.
12/09/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed The Mylar package with the orginal CC&R's were left in the engineering administrator's office for review and signature 10Dec09.
12/09/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed The Mylar (only) was left with the deputy director for review and signature 15Dec09. The original CC&R's were returned to the CDRC office.
12/10/2009 PAUL MACHADO ENGINEERING REVIEW Approved 20Nov09 - pre engineering review -

1. Orignal CC&R's are needed.
2. The language in the Title block on CC&R's do not match the language in the Title block of the Mylar.
3. Complete the blanks on page 5 of the CC&R's.
4. Page 28 of the CC&R's is missing.
5. The seals on the Mylar are smugged.
6. The "per this plat" as requested by zoning was not completed. Zoning's comment, 'Thank you for the loading zone easement. On sheet 2, next to the loading zone easement notation, please add the words "per this plat".'
12/10/2009 PAUL MACHADO ENGINEERING REVIEW Approved Left with engineering reviewer 20Nov09 to complete review.
12/10/2009 PAUL MACHADO ENGINEERING REVIEW Approved To: Patricia Gehlen DATE: December 9, 2009
CDRC/Zoning Manager FROM: Paul Machado
Engineering Division
SUBJECT: P3 Condos., 3150 N. Freeway Industrial Loop
Final Plat S08-045 (Fourth Review)
T13S, R13E, Section 34

RESUBMITTAL REQUIRED: Final Plat.

The Final Plat (FP) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Final Plat:

1. Please include a detailed response letter to the comments along with the corrected copies of the FP. The FP will not be accepted for re-submittal if the response letter detailing how the corrections were addressed is not included in the re-submittal. Per previous comment.
2. Orignal CC&R's are needed.
3. The language in the Title block on CC&R's do not match the language in the Title block of the Mylar.
4. Complete the blanks on page 5 of the CC&R's.
5. Page 28 of the CC&R's is missing.
6. The "per this plat" as requested by zoning was not completed. Zoning's comment, 'Thank you for the loading zone easement. On sheet 2, next to the loading zone easement notation, please add the words "per this plat".'


If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4932 office
(520) 879-8010 fax
C:/3150 N. Freeway Industrial Loop_FP_Condo 4
12/10/2009 PAUL MACHADO ENGINEERING REVIEW Approved An original and complete CC&R package was delived to the CDRC office.
12/10/2009 PAUL MACHADO ENGINEERING REVIEW Approved The Mylar package with the orginal CC&R's were left in the engineering administrator's office for review and signature 10Dec09.
12/10/2009 PAUL MACHADO ENGINEERING REVIEW Approved The Mylar (only) was left with the deputy director for review and signature 15Dec09. The original CC&R's were returned to the CDRC office.
12/21/2009 CRAIG GROSS ENGINEERING PROCESSING Approved 20Nov09 - pre engineering review -

1. Orignal CC&R's are needed.
2. The language in the Title block on CC&R's do not match the language in the Title block of the Mylar.
3. Complete the blanks on page 5 of the CC&R's.
4. Page 28 of the CC&R's is missing.
5. The seals on the Mylar are smugged.
6. The "per this plat" as requested by zoning was not completed. Zoning's comment, 'Thank you for the loading zone easement. On sheet 2, next to the loading zone easement notation, please add the words "per this plat".'
12/21/2009 CRAIG GROSS ENGINEERING PROCESSING Approved Left with engineering reviewer 20Nov09 to complete review.
12/21/2009 CRAIG GROSS ENGINEERING PROCESSING Approved To: Patricia Gehlen DATE: December 9, 2009
CDRC/Zoning Manager FROM: Paul Machado
Engineering Division
SUBJECT: P3 Condos., 3150 N. Freeway Industrial Loop
Final Plat S08-045 (Fourth Review)
T13S, R13E, Section 34

RESUBMITTAL REQUIRED: Final Plat.

The Final Plat (FP) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Final Plat:

1. Please include a detailed response letter to the comments along with the corrected copies of the FP. The FP will not be accepted for re-submittal if the response letter detailing how the corrections were addressed is not included in the re-submittal. Per previous comment.
2. Orignal CC&R's are needed.
3. The language in the Title block on CC&R's do not match the language in the Title block of the Mylar.
4. Complete the blanks on page 5 of the CC&R's.
5. Page 28 of the CC&R's is missing.
6. The "per this plat" as requested by zoning was not completed. Zoning's comment, 'Thank you for the loading zone easement. On sheet 2, next to the loading zone easement notation, please add the words "per this plat".'


If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4932 office
(520) 879-8010 fax
C:/3150 N. Freeway Industrial Loop_FP_Condo 4
12/21/2009 CRAIG GROSS ENGINEERING PROCESSING Approved An original and complete CC&R package was delived to the CDRC office.
12/21/2009 CRAIG GROSS ENGINEERING PROCESSING Approved The Mylar package with the orginal CC&R's were left in the engineering administrator's office for review and signature 10Dec09.
12/21/2009 CRAIG GROSS ENGINEERING PROCESSING Approved The Mylar (only) was left with the deputy director for review and signature 15Dec09. The original CC&R's were returned to the CDRC office.
12/22/2009 JWILLIA4 CDRC STAFF CITY AGENDA OFFICE Completed
12/22/2009 JWILLIA4 CDRC STAFF CITY CLERK'S OFFICE Completed