Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Plan Number: S08-021
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT REVIEW

Plan Number - S08-021
Review Name: FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/06/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
02/20/2008 FRODRIG2 PIMA COUNTY WASTEWATER Approv-Cond February 19, 2008

To: Bruce Paton, P.E.
Rick Engineering

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

____________________________________
From: Tom Porter, Sr. Civil Eng. Assistant (520-740-6706), representing the Pima County
Departments of Wastewater Management and Environmental Quality


Subject: Final Plat
Puente Nuevo Plaza
1st Submittal, S08-021


The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


We have sent to your office via e-mail, a .pdf file containing a Sewer Service Agreement for the proposed number of wastewater fixture unit equivalents. Three originals will need to be printed out from this file for notarized signatures by the Owner of Record. The three signed originals of the Agreement must be returned to this office in order to satisfy the necessary requirements needed to approve the Mylars of the Final Plat.

Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.
If you have any questions regarding the above mentioned comments, please do not hesitate to contact me.
02/25/2008 PGEHLEN1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved
02/28/2008 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: PUENTE NUEVO CONDOMINIUMS

S08-021



TEP has approves the final plat submitted February 6, 2008. Any
additional easements required will be secured by separate instrument.

Please forward any resubmittals of the final plat to this office.



Electric service will be provided to this subdivision in accordance with
the rules and regulations approved by the Arizona Corporation
Commission.



Please contact me at (520) 917-8745 if you have any questions.


Liza Castillo, Right of Way Agent
Tucson Electric Power Co.
Unisource Energy Services
offc-(520) 917-8745
fax-(520) 545-1416
lcastillo@tep.com
03/06/2008 FRODRIG2 COT NON-DSD REAL ESTATE Approved S08-021 Puente Nuevo Condominiums: Final Plat Review
-No comment.
03/06/2008 KAY MARKS PIMA COUNTY ADDRESSING Approv-Cond 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S08-021 PUENTE NUEVO CONDOMINIUMS/FINAL PLAT
DATE: 3/06/08



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.

NOTE: ON FINAL MYLAR:

Add Road to Ft Lowell on Location Map.

2.) Delete all tax codes.



***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through Pima
County Addressing. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***

es
03/10/2008 TERRY STEVENS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: S08-021
Puente Nuevo Condominiums
Final Plat

TRANSMITTAL: 03/10/2008

DUE DATE: 3/6/08

COMMENTS:


1. An applicant has one (1) year from the date of application to obtain approval and recordation of a final condominium plat that complies with zoning and other development requirements in effect at the time of application. This final condominium plat must be approved and recorded on or before 2/05/09.

2. DS 2-03.6.1.K Case number S08-021 has been assigned to this final plat. Please place this number in the right corner of all sheets of the final plat.
A Development Plan has been completed for this project. Add the Development Plan number (D07-0017) in the right corner of all sheets of the final plat.
In the title block add the following: "A resubdivision of PARCEL 3 RS 28/58 EXC RD AKA PTN SW4 SW4 5.44 AC SEC 27-13-14".

3. LUC 4.1.9.2 Please submit a copy of a report on the physical condition of all buildings, structures, and other improvements to the property to be subdivided prior to approval of a final plat by the Mayor and Council. This report shall be provided by the subdivider to all prospective purchasers of units prior to execution of a binding contract of purchase. The report shall contain the following.
a. A statement of the estimated fees or assessments, if any, that the purchaser of a unit will pay, on a monthly and yearly basis, for at least a two (2) year period following purchase.
b. A report from a licensed pest control operator on each building or structure and each unit within the building or structure.
c. A statement of the unit's average monthly utility costs based on the preceding twelve (12) month period, where the subdivider has access to such utility cost data.
d. A report describing, to the best knowledge or estimate of the subdivider, the physical condition of elements of the structure, equipment, or appliances in a unit, the repair or replacement of which will be the responsibility of the purchaser. The report shall state the approximate date on which the element, equipment, or appliance was originally constructed or installed; the approximate date on which it was subsequently replaced or will likely require replacement; and the current estimated cost of replacement. This report shall not be construed to create any warranties, express or implied.
e. A report containing information to be obtained from the City Fire Department describing the extent to which the buildings and structures to be converted by the plat submitted by the subdivider deviate from applicable requirements of the Building Code, Tucson Code, Chapter 6, and the Fire Prevention Code, Tucson Code, Chapter 13, in the following specified areas of fire safety.
1. Accessibility of buildings and structures to fire-fighting equipment; and
2. Proximity and frequency of fire hydrants.

If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961


TLS C:\planning\cdrc\finalplat\S08-021fp.doc
03/11/2008 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Gary Ault, Mapping Supervisor
Pima County Assessor’s Office
Mapping Department

DATE: March 6, 2008


RE: Assessor’s Review and Comments Regarding Final Plat
S08-021 Puente Nuevo Plaza T131427

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor’s Office requirements.
_______ Plat does not meet Assessor’s Office requirements.


COMMENTS: Thank you for your submittal.

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.






David m. Lewis
03/12/2008 LOREN MAKUS ENGINEERING REVIEW Approv-Cond DATE: March 12, 2008

To: Patricia Gehlen
CDRC/Zoning Manager
FROM: Loren Makus, EIT
Engineering Division


SUBJECT: Puente Nuevo Plaza
Plat S08-021 (First Review)
T13S, R14E, Section 27

RESUBMITTAL REQUIRED: None

The Plat has been reviewed by the Engineering Division and we recommend approval with the following conditions:

1. A complete assurances package must be provided before the plat can be approved and forwarded to Mayor and Council
2. For clarity, we recommend making a notation on sheet 1 or 2 that curve and tie data are on sheet 3.
3. Include the subdivision activity number (S08-021) and the development plan activity number (D07-0017) on each sheet.

If you have any questions, I can be reached at 520.837.4927 or loren.makus@tucsonaz.gov

Loren Makus, EIT
Senior Engineering Associate
03/14/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

March 14, 2008
Dan Castro
Rick Engineering Company, Inc.
1745 East River Road, Suite 101
Tucson, Arizona 85718

Subject: S08-021 Puente Nuevo Condominiums Final Plat

Dear Dan:

The above referenced project has been CONDITIONALLY APPROVED by the Community Design Review Committee. Please make any necessary corrections and submit the following documents:

(2) Title reports current within the last thirty (30) days.
(1) Executed Final Plat Double Matte Océ or Photo Mylar.
(1) * Check in the amount of $8.50 per plat page for Mayor & Council distribution made payable to the local print company of your choice or provide an account number to charge.
(1) * Check in the amount of $55.00 per plat page for recorded plat distribution made payable to the local print company of your choice or provide an account number to charge.
(1) Check made payable to "Pima County Recorder" in the amount of $20.00 per plat page plus a $4.00 handling fee, along with CC&R fees if applicable. CC&R fees are $9.00 for the first 5 pages and $1.00 for each additional page.
(1) Executed and notarized CC&R's document (if applicable).

*Please do not combine the checks for the printing charges. They are processed at different times and require separate checks. An account number is also acceptable and you can include this information on your transmittal sheet when submitting the above listed items.

Assurances (if applicable) must be reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CC&R's and assurances must be approved at the same Mayor and Council Meeting. Please expect 7 - 8 weeks from the date submitted to the date scheduled for Mayor and Council approval.

Should you have any questions, please call me at 837-4919.


Sincerely,



Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 322-6956
Fp-approved