Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT REVIEW
Plan Number - S08-021
Review Name: FINAL PLAT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/06/2008 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 02/20/2008 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approv-Cond | February 19, 2008 To: Bruce Paton, P.E. Rick Engineering Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department ____________________________________ From: Tom Porter, Sr. Civil Eng. Assistant (520-740-6706), representing the Pima County Departments of Wastewater Management and Environmental Quality Subject: Final Plat Puente Nuevo Plaza 1st Submittal, S08-021 The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. We have sent to your office via e-mail, a .pdf file containing a Sewer Service Agreement for the proposed number of wastewater fixture unit equivalents. Three originals will need to be printed out from this file for notarized signatures by the Owner of Record. The three signed originals of the Agreement must be returned to this office in order to satisfy the necessary requirements needed to approve the Mylars of the Final Plat. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please do not hesitate to contact me. |
| 02/25/2008 | PGEHLEN1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | |
| 02/28/2008 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: PUENTE NUEVO CONDOMINIUMS S08-021 TEP has approves the final plat submitted February 6, 2008. Any additional easements required will be secured by separate instrument. Please forward any resubmittals of the final plat to this office. Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission. Please contact me at (520) 917-8745 if you have any questions. Liza Castillo, Right of Way Agent Tucson Electric Power Co. Unisource Energy Services offc-(520) 917-8745 fax-(520) 545-1416 lcastillo@tep.com |
| 03/06/2008 | FRODRIG2 | COT NON-DSD | REAL ESTATE | Approved | S08-021 Puente Nuevo Condominiums: Final Plat Review -No comment. |
| 03/06/2008 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approv-Cond | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S08-021 PUENTE NUEVO CONDOMINIUMS/FINAL PLAT DATE: 3/06/08 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. NOTE: ON FINAL MYLAR: Add Road to Ft Lowell on Location Map. 2.) Delete all tax codes. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through Pima County Addressing. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** es |
| 03/10/2008 | TERRY STEVENS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Terry Stevens Lead Planner PROJECT: S08-021 Puente Nuevo Condominiums Final Plat TRANSMITTAL: 03/10/2008 DUE DATE: 3/6/08 COMMENTS: 1. An applicant has one (1) year from the date of application to obtain approval and recordation of a final condominium plat that complies with zoning and other development requirements in effect at the time of application. This final condominium plat must be approved and recorded on or before 2/05/09. 2. DS 2-03.6.1.K Case number S08-021 has been assigned to this final plat. Please place this number in the right corner of all sheets of the final plat. A Development Plan has been completed for this project. Add the Development Plan number (D07-0017) in the right corner of all sheets of the final plat. In the title block add the following: "A resubdivision of PARCEL 3 RS 28/58 EXC RD AKA PTN SW4 SW4 5.44 AC SEC 27-13-14". 3. LUC 4.1.9.2 Please submit a copy of a report on the physical condition of all buildings, structures, and other improvements to the property to be subdivided prior to approval of a final plat by the Mayor and Council. This report shall be provided by the subdivider to all prospective purchasers of units prior to execution of a binding contract of purchase. The report shall contain the following. a. A statement of the estimated fees or assessments, if any, that the purchaser of a unit will pay, on a monthly and yearly basis, for at least a two (2) year period following purchase. b. A report from a licensed pest control operator on each building or structure and each unit within the building or structure. c. A statement of the unit's average monthly utility costs based on the preceding twelve (12) month period, where the subdivider has access to such utility cost data. d. A report describing, to the best knowledge or estimate of the subdivider, the physical condition of elements of the structure, equipment, or appliances in a unit, the repair or replacement of which will be the responsibility of the purchaser. The report shall state the approximate date on which the element, equipment, or appliance was originally constructed or installed; the approximate date on which it was subsequently replaced or will likely require replacement; and the current estimated cost of replacement. This report shall not be construed to create any warranties, express or implied. e. A report containing information to be obtained from the City Fire Department describing the extent to which the buildings and structures to be converted by the plat submitted by the subdivider deviate from applicable requirements of the Building Code, Tucson Code, Chapter 6, and the Fire Prevention Code, Tucson Code, Chapter 13, in the following specified areas of fire safety. 1. Accessibility of buildings and structures to fire-fighting equipment; and 2. Proximity and frequency of fire hydrants. If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961 TLS C:\planning\cdrc\finalplat\S08-021fp.doc |
| 03/11/2008 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Gary Ault, Mapping Supervisor Pima County Assessor’s Office Mapping Department DATE: March 6, 2008 RE: Assessor’s Review and Comments Regarding Final Plat S08-021 Puente Nuevo Plaza T131427 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor’s Office requirements. _______ Plat does not meet Assessor’s Office requirements. COMMENTS: Thank you for your submittal. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. David m. Lewis |
| 03/12/2008 | LOREN MAKUS | ENGINEERING | REVIEW | Approv-Cond | DATE: March 12, 2008 To: Patricia Gehlen CDRC/Zoning Manager FROM: Loren Makus, EIT Engineering Division SUBJECT: Puente Nuevo Plaza Plat S08-021 (First Review) T13S, R14E, Section 27 RESUBMITTAL REQUIRED: None The Plat has been reviewed by the Engineering Division and we recommend approval with the following conditions: 1. A complete assurances package must be provided before the plat can be approved and forwarded to Mayor and Council 2. For clarity, we recommend making a notation on sheet 1 or 2 that curve and tie data are on sheet 3. 3. Include the subdivision activity number (S08-021) and the development plan activity number (D07-0017) on each sheet. If you have any questions, I can be reached at 520.837.4927 or loren.makus@tucsonaz.gov Loren Makus, EIT Senior Engineering Associate |
| 03/14/2008 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES March 14, 2008 Dan Castro Rick Engineering Company, Inc. 1745 East River Road, Suite 101 Tucson, Arizona 85718 Subject: S08-021 Puente Nuevo Condominiums Final Plat Dear Dan: The above referenced project has been CONDITIONALLY APPROVED by the Community Design Review Committee. Please make any necessary corrections and submit the following documents: (2) Title reports current within the last thirty (30) days. (1) Executed Final Plat Double Matte Océ or Photo Mylar. (1) * Check in the amount of $8.50 per plat page for Mayor & Council distribution made payable to the local print company of your choice or provide an account number to charge. (1) * Check in the amount of $55.00 per plat page for recorded plat distribution made payable to the local print company of your choice or provide an account number to charge. (1) Check made payable to "Pima County Recorder" in the amount of $20.00 per plat page plus a $4.00 handling fee, along with CC&R fees if applicable. CC&R fees are $9.00 for the first 5 pages and $1.00 for each additional page. (1) Executed and notarized CC&R's document (if applicable). *Please do not combine the checks for the printing charges. They are processed at different times and require separate checks. An account number is also acceptable and you can include this information on your transmittal sheet when submitting the above listed items. Assurances (if applicable) must be reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CC&R's and assurances must be approved at the same Mayor and Council Meeting. Please expect 7 - 8 weeks from the date submitted to the date scheduled for Mayor and Council approval. Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 322-6956 Fp-approved |