Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S07-155
Parcel: Unknown

Address:
3301 S 6TH AV

Review Status: Completed

Review Details: FINAL PLAT PACKAGE

Plan Number - S07-155
Review Name: FINAL PLAT PACKAGE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/26/2009 CDRC1 START FINAL PLAT PACKAGE Completed
02/26/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed Bev,

I have called Hank Hulbert with CEI (applicant) to get some minor correction done on the Mylar so we can approve it. 3 items are outstanding. They need to fill in the name of the person or entity for the person under the Record Section "filed for request"; need to add a zero to one of the 2009 dates (reads 209); and they need to either have the surveyor (Jess Alverez) of record seal and sign the plat since it is his name under the Surveyor section or have the name of the person (Amber Cordova) who sealed the plan placed under this section.

Hank said that they would try to get down here today to take care of these minor changes or Monday at the latest. I told him that I would roll it up and place it to the side without denying it. If I do not hear or see anyone by next Wednesday then I will deny the Mylar based on the above comments.

JG
03/02/2009 JASON GREEN ENGINEERING REVIEW Approved Bev,

I have called Hank Hulbert with CEI (applicant) to get some minor correction done on the Mylar so we can approve it. 3 items are outstanding. They need to fill in the name of the person or entity for the person under the Record Section "filed for request"; need to add a zero to one of the 2009 dates (reads 209); and they need to either have the surveyor (Jess Alverez) of record seal and sign the plat since it is his name under the Surveyor section or have the name of the person (Amber Cordova) who sealed the plan placed under this section.

Hank said that they would try to get down here today to take care of these minor changes or Monday at the latest. I told him that I would roll it up and place it to the side without denying it. If I do not hear or see anyone by next Wednesday then I will deny the Mylar based on the above comments.

JG
03/17/2009 CDRC1 CDRC STAFF CITY AGENDA OFFICE Completed
03/17/2009 CRAIG GROSS ENGINEERING PROCESSING Completed Bev,

I have called Hank Hulbert with CEI (applicant) to get some minor correction done on the Mylar so we can approve it. 3 items are outstanding. They need to fill in the name of the person or entity for the person under the Record Section "filed for request"; need to add a zero to one of the 2009 dates (reads 209); and they need to either have the surveyor (Jess Alverez) of record seal and sign the plat since it is his name under the Surveyor section or have the name of the person (Amber Cordova) who sealed the plan placed under this section.

Hank said that they would try to get down here today to take care of these minor changes or Monday at the latest. I told him that I would roll it up and place it to the side without denying it. If I do not hear or see anyone by next Wednesday then I will deny the Mylar based on the above comments.

JG
03/17/2009 CDRC1 CDRC STAFF CITY CLERK'S OFFICE Completed