Plan Number: S07-033
Parcel: Unknown

Review Status: Completed

Review Details: REVISION - TENT PLAT & CORE RESUB

Plan Number - S07-033
Review Name: REVISION - TENT PLAT & CORE RESUB
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/11/2016 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/24/2016 PAUL BAUGHMAN ENGINEERING REVIEW Approved
04/05/2016 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Principal Planner

PROJECT: Starr Pass Vistas Village 2
Development Package (Revision to FLD)
S07-033

TRANSMITTAL DATE: April 5, 2016

DUE DATE: April 11, 2016

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

1. 2-06.4.9.B - Per UDC Article 8.7.3.E2 the minimum lot size in the RX-2 zone is 12,000 Sq. Ft. Revise the minimum lot size shown on sheet 1 under "TABULATIONS".

2. 2-06.5.3.G.1 - Provide a copy of the Covenants, Conditions, and Restrictions (CC&Rs) regarding the homeowner's association's responsibility for the ownership and maintenance of commonly-owned property.

Once the above comments are addressed Zoning is willing to provide an over the counter review.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
04/11/2016 JOE LINVILLE NPPO REVIEW Approved
04/11/2016 JOE LINVILLE LANDSCAPE REVIEW Reqs Change 1) The plans require revision to comply with the FLD requirements for Landscape and Screening:

UDC 8.7.3.H. Landscaping, Screening and Wall Requirements
1. FLD projects shall comply with Section 7.6, Landscaping and Screening Standards, except as otherwise provided by this section.
2. One canopy tree shall be provided every 40 feet of pedestrian circulation systems, excluding crossings with streets, alleys, and driveways. If providing canopy trees every 40 feet is not achievable, the applicant shall:
a. Provide the equivalent number of trees that would be obtained using the 40-foot increment measure; and,
b. Distribute the trees within the FLD project site along pedestrian circulation systems and within functional open space areas.
3. Landscape plans shall incorporate water-conserving design as defined in Section 7.6.6, Use of Water, and as described in the Technical Standards Manual.
4. Water harvesting techniques shall be incorporated as part of the landscape design based on the Water Harvesting Guidance Manual prepared for the City of Tucson Transportation Department Stormwater Section.
5. Mechanical equipment, utility boxes, irrigation equipment and similar elements shall be screened from adjacent streets exterior to the project and from adjacent existing residential development. Screening shall be architecturally integrated with the overall design of the FLD.
6. If a perimeter wall is proposed along an existing public right-of-way, it shall be constructed of, or painted with, graffiti-resistant materials. The wall shall incorporate one or more of the following decorative materials:
a. Tile;
b. Stone;
c. Brick;
d. Adobe;
e. A textured material such as stucco or plaster; or,
f. Metal.
I. Parking

2) UDC 7.6.4.C.2.b Revise the plans to identify the street landscape borders and provide the required common areas.
04/12/2016 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) All items requested by review staff
3) All items needed to approve these plans
04/13/2016 FDILLON1 DESIGN PROFESSIONAL REVIEW Approv-Cond This project requires an architectural variation plan AVP per UDC Section 8.7.3
04/13/2016 FDILLON1 DESIGN PROFESSIONAL REVIEW Approv-Cond Trish look for general note #28

Dan,



We can approve it and they can submit later at the AVP at the time of building permits. If they want to do this option in the future you should notify us since this is not common practice.





Frank Dillon
Principal Planner
Planning & Development Services
City of Tucson
520.837.6957

Final Status

Task End Date Reviewer's Name Type of Review Description
04/22/2016 CPIERCE1 OUT TO CUSTOMER Completed