Plan Review Detail
Review Status: Completed
Review Details: ASSURANCES
Plan Number - S07-033
Review Name: ASSURANCES
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/17/2008 | FERNE RODRIGUEZ | START | ASSURANCES RECEIVED | Completed | |
| 10/15/2008 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | DATE: October 15, 2008 TO: Patricia Gehlen; CDRC Coordinator SUBJECT: Starr Pass Vistas Village 2 (S07-033) Final Plat and assurances Review REVIEWER: Elizabeth Eberbach LOCATION: T14S R13E Section 16 ACTIVITY NUMBER: S07-033 SUMMARY: The revised Final Plat (received to Engineering on 17SEP08), assurance documents, CC&R's, and title report were received and reviewed for Final Plat conformance. The Final Plat drainage report and geotechnical report were submitted 23SEP08. The Final Plat and assurances are not recommended for approval at this time until comments are addressed. The drainage and geotechnical reports are accepted for plat purposes only. FINAL PLAT COMMENTS: 1) City of Tucson Development Standards (DS) Section No.2-03.6.4.I: Clarify how setback can be determined - tie geotechnical basin setback in lots 9, 10, 41, and 42 to lot line. 2) DS Sec.2-03.6.5.C.5: Address the remaining survey comments: a) For planview sheets, clarify recorded, measured, or calculated plat boundary data. b) DS Sec.2-03.6.4.F: For the surveyable EHS and 100-year floodprone limits, show more/additional frequent ties to intersecting lot lines. Check / clarify lots 15, 16, 17, 20 and 24. Check data for clarity; it may be necessary to use crow's feet for some lengths. 3) DS Sec.2-03.6.5.B: Address the remaining easement comments: a) Delineate and label a private drainage maintenance easement near lots 17 and 23 and any other lots, for the pipe culverts. Response letter referred to keynote 3 - clarify. b) Revise common area B area description. Sheets 1 and 4 should be clarified to reflect sewer easement in common area B-1. Assure that the descriptions of the common areas of the Final Plat title block match the CC&R's descriptions of the subdivision common areas and the descriptions in the assurance paperwork. Please be aware that the City of Tucson's legal office may reject the assurance paperwork if the verbiage does not match exactly the verbiage on the Final Plat's Title Block. 4) DS Sec.2-03.6.6.A: Address the remaining CC&R's comments: a) DS Sec.10-02.14.3.2: An original signed copy of the CC&R's will be required for Final Plat approval. b) Assure that the description of the project on the Final Plat title block match the CC&R's description of the subdivision on page one of the CC&R's. c) DS Sec.10-02.14.3.2, DS Sec.2.3.1.6.C: The drainage maintenance list in the CC&R's is incomplete. In the drainage maintenance exhibit for the CC&R's, revise the list of maintenance recommendations for the drainage areas to include all drainage improvements (basins, box culvert, drainage channels, drainage pipes, and other drainage structures or improvements) as outlined in the project's Drainage Report or as provided by the project's engineer and accepted by the City of Tucson DSD engineer. ASSURANCES COMMENTS: 5) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved. Address the following for the third party trust subdivision assurance package: a) Revise pages of the AGREEMENT TO CONSTRUCT and AMENDMENT TO TRUST according to the following comments: (1) Assure that all exhibits are correctly attached; AGREEMENT TO CONSTRUCT is missing the Exhibit B and the AMENDMENT TO TRUST should only have an exhibit A. (2) Revise subdivision description if title block changes due to outstanding plat comments. (3) Remove additional verbiage for exhibit titles; exhibits should be referencing the exhibit letter only, not another exhibit. and (4) Add colons to the descriptions in the first pages and exhibits of the AGREEMENT and AMENDMENT to match plat title block. (5) Fix gap and add punctuation to the first paragraph in the AMENDMENT. (6) Correct/add end parentheses in the exhibits for the legal descriptions in both the AGREEMENT and AMENDMENT. (7) In the Agreement to Construct, update Assurable item 8 to include both " … onsite and offsite improvements …" b) Provide the following for the recompiled assurance package resubmittal: (1) original copy of the AGREEMENT TO CONSTRUCT SUBDIVISION IMPROVEMENTS / THIRD PARTY TRUST with the Exhibit A (legal description), assurable items list (Exhibit B), and Exhibit C (copy of the original Trust Agreement); (2) original copy of the AMENDMENT TO TRUST / THIRD PARTY TRUST with the Exhibit A (legal description); (3) copy of a sample Warranty Deed; (4) copy of the current Title Report. Submit the revised Final Plat, revised CC&R's, copy of the title report, an revised assurance package, and response letter. You may call to go over these comments, or if you have any questions, please call me at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
| 10/15/2008 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | DATE: October 15, 2008 TO: Patricia Gehlen; CDRC Coordinator SUBJECT: Starr Pass Vistas Village 2 (S07-033) Final Plat and assurances Review REVIEWER: Elizabeth Eberbach LOCATION: T14S R13E Section 16 ACTIVITY NUMBER: S07-033 SUMMARY: The revised Final Plat (received to Engineering on 17SEP08), assurance documents, CC&R's, and title report were received and reviewed for Final Plat conformance. The Final Plat drainage report and geotechnical report were submitted 23SEP08. The Final Plat and assurances are not recommended for approval at this time until comments are addressed. The drainage and geotechnical reports are accepted for plat purposes only. FINAL PLAT COMMENTS: 1) City of Tucson Development Standards (DS) Section No.2-03.6.4.I: Clarify how setback can be determined - tie geotechnical basin setback in lots 9, 10, 41, and 42 to lot line. 2) DS Sec.2-03.6.5.C.5: Address the remaining survey comments: a) For planview sheets, clarify recorded, measured, or calculated plat boundary data. b) DS Sec.2-03.6.4.F: For the surveyable EHS and 100-year floodprone limits, show more/additional frequent ties to intersecting lot lines. Check / clarify lots 15, 16, 17, 20 and 24. Check data for clarity; it may be necessary to use crow's feet for some lengths. 3) DS Sec.2-03.6.5.B: Address the remaining easement comments: a) Delineate and label a private drainage maintenance easement near lots 17 and 23 and any other lots, for the pipe culverts. Response letter referred to keynote 3 - clarify. b) Revise common area B area description. Sheets 1 and 4 should be clarified to reflect sewer easement in common area B-1. Assure that the descriptions of the common areas of the Final Plat title block match the CC&R's descriptions of the subdivision common areas and the descriptions in the assurance paperwork. Please be aware that the City of Tucson's legal office may reject the assurance paperwork if the verbiage does not match exactly the verbiage on the Final Plat's Title Block. 4) DS Sec.2-03.6.6.A: Address the remaining CC&R's comments: a) DS Sec.10-02.14.3.2: An original signed copy of the CC&R's will be required for Final Plat approval. b) Assure that the description of the project on the Final Plat title block match the CC&R's description of the subdivision on page one of the CC&R's. c) DS Sec.10-02.14.3.2, DS Sec.2.3.1.6.C: The drainage maintenance list in the CC&R's is incomplete. In the drainage maintenance exhibit for the CC&R's, revise the list of maintenance recommendations for the drainage areas to include all drainage improvements (basins, box culvert, drainage channels, drainage pipes, and other drainage structures or improvements) as outlined in the project's Drainage Report or as provided by the project's engineer and accepted by the City of Tucson DSD engineer. ASSURANCES COMMENTS: 5) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved. Address the following for the third party trust subdivision assurance package: a) Revise pages of the AGREEMENT TO CONSTRUCT and AMENDMENT TO TRUST according to the following comments: (1) Assure that all exhibits are correctly attached; AGREEMENT TO CONSTRUCT is missing the Exhibit B and the AMENDMENT TO TRUST should only have an exhibit A. (2) Revise subdivision description if title block changes due to outstanding plat comments. (3) Remove additional verbiage for exhibit titles; exhibits should be referencing the exhibit letter only, not another exhibit. and (4) Add colons to the descriptions in the first pages and exhibits of the AGREEMENT and AMENDMENT to match plat title block. (5) Fix gap and add punctuation to the first paragraph in the AMENDMENT. (6) Correct/add end parentheses in the exhibits for the legal descriptions in both the AGREEMENT and AMENDMENT. (7) In the Agreement to Construct, update Assurable item 8 to include both " … onsite and offsite improvements …" b) Provide the following for the recompiled assurance package resubmittal: (1) original copy of the AGREEMENT TO CONSTRUCT SUBDIVISION IMPROVEMENTS / THIRD PARTY TRUST with the Exhibit A (legal description), assurable items list (Exhibit B), and Exhibit C (copy of the original Trust Agreement); (2) original copy of the AMENDMENT TO TRUST / THIRD PARTY TRUST with the Exhibit A (legal description); (3) copy of a sample Warranty Deed; (4) copy of the current Title Report. Submit the revised Final Plat, revised CC&R's, copy of the title report, an revised assurance package, and response letter. You may call to go over these comments, or if you have any questions, please call me at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |