Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Plan Number - S07-033
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/17/2008 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 09/22/2008 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 09/26/2008 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 JENNIFER STEPHENS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: JENNIFER STEPHENS, ADDRESSING OFFICIAL SUBJECT: S07-033 STARR PASS VISTAS VILLAGE II/REVISED FINAL PLAT DATE: 9/26/08 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through Pima County Addressing. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County's Geographic Information System. Your support is greatly appreciated.*** |
| 10/10/2008 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Denied | SUBJECT: STARR PASS VISTAS VILLAGE II S07-033 Tucson Electric Power Company (TEP) has received the final plat submitted for review September 17, 2008. TEP is unable to approve the plat at this time. When the preliminary plat has been approved by the City of Tucson submit to my attention a copy of the signed Approved Preliminary Plat. TEP will provide an electrical design within fifteen (15) working days upon receipt of the plat and the required additional plans. The completion of the electrical design is necessary to determine our easement requirements and review the final plat. Additional plans necessary for preparation of the design are: building plans including water, electrical, landscape, sidewalk and paving plans. Also, submit the AutoCAD version of the plat on a CD or email to lcastillo@tep.com <mailto:lcastillo@tep.com> . Electronic AutoCad Plan format: 1. An Electronic AutoCad plan must be complete and identical to the official hard copy (paper) project (subdivision, commercial) plat. 2. The AutoCAD plan must be a civil site plan drawing. (The majority of time an electrical site plan drawing does not have the required information.) 3. A single AutoCAD plan drawing containing all the layers should be submitted. 4. AutoCAD plan should be in DWG format. 5. AutoCAD Version can be 2007 or lower. 6. 2D only, not 3D (Please take out reference images and 3D images.) 7. Please take out the topography Layer. 8. Layers relate to a unique set of CAD features within the drawing. (For example all lot lines should be on one layer, street centerlines another layer.) 9. Include the required Layers: Lot Lines, Right of Way lines, Street Centerlines, Buildings, Curbs, Basin, Section Lines, Boundary of Property, Footages, Bearings, Lot Numbers, Street Names, and Tie Down (Section or Quarter Pins.) 10. At least three tie points are required; one must be a Section or a Quarter pin and the others may be street intersections or lot corners. Bearings and distances must be designated from the tie points. 11. Please include the Boundary Line of Property. It must be designated with bearings and distances. 12. Any special fonts, X-REFs, or attachments should be submitted along with the CAD drawing. Please contact me at (520) 917-8745 if you have any questions. Liza Castillo, Right of Way Agent II Tucson Electric Power Co. Unisource Energy Services offc-(520) 917-8745 fax-(520) 545-1416 lcastillo@tep.com <mailto:lcastillo@tep.com> |
| 10/15/2008 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | DATE: October 15, 2008 TO: Patricia Gehlen; CDRC Coordinator SUBJECT: Starr Pass Vistas Village 2 (S07-033) Final Plat and assurances Review REVIEWER: Elizabeth Eberbach LOCATION: T14S R13E Section 16 ACTIVITY NUMBER: S07-033 SUMMARY: The revised Final Plat (received to Engineering on 17SEP08), assurance documents, CC&R's, and title report were received and reviewed for Final Plat conformance. The Final Plat drainage report and geotechnical report were submitted 23SEP08. The Final Plat and assurances are not recommended for approval at this time until comments are addressed. The drainage and geotechnical reports are accepted for plat purposes only. FINAL PLAT COMMENTS: 1) City of Tucson Development Standards (DS) Section No.2-03.6.4.I: Clarify how setback can be determined - tie geotechnical basin setback in lots 9, 10, 41, and 42 to lot line. 2) DS Sec.2-03.6.5.C.5: Address the remaining survey comments: a) For planview sheets, clarify recorded, measured, or calculated plat boundary data. b) DS Sec.2-03.6.4.F: For the surveyable EHS and 100-year floodprone limits, show more/additional frequent ties to intersecting lot lines. Check / clarify lots 15, 16, 17, 20 and 24. Check data for clarity; it may be necessary to use crow's feet for some lengths. 3) DS Sec.2-03.6.5.B: Address the remaining easement comments: a) Delineate and label a private drainage maintenance easement near lots 17 and 23 and any other lots, for the pipe culverts. Response letter referred to keynote 3 - clarify. b) Revise common area B area description. Sheets 1 and 4 should be clarified to reflect sewer easement in common area B-1. Assure that the descriptions of the common areas of the Final Plat title block match the CC&R's descriptions of the subdivision common areas and the descriptions in the assurance paperwork. Please be aware that the City of Tucson's legal office may reject the assurance paperwork if the verbiage does not match exactly the verbiage on the Final Plat's Title Block. 4) DS Sec.2-03.6.6.A: Address the remaining CC&R's comments: a) DS Sec.10-02.14.3.2: An original signed copy of the CC&R's will be required for Final Plat approval. b) Assure that the description of the project on the Final Plat title block match the CC&R's description of the subdivision on page one of the CC&R's. c) DS Sec.10-02.14.3.2, DS Sec.2.3.1.6.C: The drainage maintenance list in the CC&R's is incomplete. In the drainage maintenance exhibit for the CC&R's, revise the list of maintenance recommendations for the drainage areas to include all drainage improvements (basins, box culvert, drainage channels, drainage pipes, and other drainage structures or improvements) as outlined in the project's Drainage Report or as provided by the project's engineer and accepted by the City of Tucson DSD engineer. ASSURANCES COMMENTS: 5) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved. Address the following for the third party trust subdivision assurance package: a) Revise pages of the AGREEMENT TO CONSTRUCT and AMENDMENT TO TRUST according to the following comments: (1) Assure that all exhibits are correctly attached; AGREEMENT TO CONSTRUCT is missing the Exhibit B and the AMENDMENT TO TRUST should only have an exhibit A. (2) Revise subdivision description if title block changes due to outstanding plat comments. (3) Remove additional verbiage for exhibit titles; exhibits should be referencing the exhibit letter only, not another exhibit. and (4) Add colons to the descriptions in the first pages and exhibits of the AGREEMENT and AMENDMENT to match plat title block. (5) Fix gap and add punctuation to the first paragraph in the AMENDMENT. (6) Correct/add end parentheses in the exhibits for the legal descriptions in both the AGREEMENT and AMENDMENT. (7) In the Agreement to Construct, update Assurable item 8 to include both " … onsite and offsite improvements …" b) Provide the following for the recompiled assurance package resubmittal: (1) original copy of the AGREEMENT TO CONSTRUCT SUBDIVISION IMPROVEMENTS / THIRD PARTY TRUST with the Exhibit A (legal description), assurable items list (Exhibit B), and Exhibit C (copy of the original Trust Agreement); (2) original copy of the AMENDMENT TO TRUST / THIRD PARTY TRUST with the Exhibit A (legal description); (3) copy of a sample Warranty Deed; (4) copy of the current Title Report. Submit the revised Final Plat, revised CC&R's, copy of the title report, an revised assurance package, and response letter. You may call to go over these comments, or if you have any questions, please call me at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
| 10/20/2008 | PGEHLEN1 | PIMA COUNTY | WASTEWATER | Passed | |
| 10/23/2008 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES October 23, 2008 Mirela Hromatka Rick Engineering Company, Inc. 1745 East River Road, Suite 101 Tucson, Arizona 85718 Subject: S07-033 Starr Pass Vistas Village II Final Plat Dear Mirela: Your submittal of September 17, 2008 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 3 Copies Revised Final Plat (TEP, Engineering, DSD) 2 Copies Title Report (Engineering, DSD) 3 Copies CC&R's (CDRC, Engineering, DSD) 2 Copies Revised Assurance Package (Engineering, DSD) Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 322-6956 fpresubmittal |