Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT REVIEW
Plan Number - S07-033
Review Name: FINAL PLAT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/04/2008 | PGEHLEN1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | |
| 01/09/2008 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approv-Cond | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S07-033 STARR PASS VISTAS VILLAGE II/FINAL PLAT DATE: January 9, 2008 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. ON FINAL MYLAR: 1.) CORRECT SCALE ON PG. 4. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through Pima County Addressing. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County's Geographic Information System. Your support is greatly appreciated.*** jg |
| 01/18/2008 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Starr Pass Vistas Village 2 S07-033 Final Plat (1st Review) TRANSMITTAL DATE: January 18, 2008 DUE DATE: January 18, 2008 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. An applicant has one (1) year from the date of approval of tentative plat to obtain approval of a final plat that complies with zoning and other development requirements in effect at the time of application. This final plat must be approved and recorded on or before December 18, 2008. As of this final plat review date the tentative plat has not been approved therefore the one year date of the final plat approval is based on the date of submittal of the final plat documents. Once the tentative plat has been approved the approval date of the final plat will be on one year from the tentative plat approval date. This date will be provided on a future review of the final plat. 2. D.S.2-03.6.6 The provided Covenants, Conditions, and Restrictions (CC&R's) are for a prior subdivision. Provide a new set of CC&R's for this subdivision, the title should reflect the information shown on this subdivision. Additional comments maybe forth coming. If you have any questions about this transmittal, please call Steve Shields, (520) 837-4956. I:\Sshield1\planning\CDRC\Final Plat\S07-033.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan, tentative plat, final plat, CC&R's and additional requested documents. |
| 01/22/2008 | FRODRIG2 | COT NON-DSD | REAL ESTATE | Approved | S07-033 Starr Pass Vistas Vollage II: Final Plat Review -No comment. |
| 01/22/2008 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Denied | SUBJECT: STARR PASS VISTAS VILLAGE II S07-033 Tucson Electric Power Company (TEP) has received the final plat submitted for review December 19, 2007. TEP is unable to approve the plat at this time. When the tentative plat has been approved by the City of Tucson submit to my attention a copy of the signed Approved Tentative Plat. TEP will provide an electrical design within fifteen (15) working days upon receipt of the plat and the required additional plans. The completion of the electrical design is necessary to determine our easement requirements and review the final plat. Additional plans necessary for preparation of the design are: building plans including water, electrical, landscape, sidewalk and paving plans. Also, submit the AutoCAD version of the plat on a CD or email to lcastillo@tep.com <mailto:lcastillo@tep.com> . Electronic AutoCad Plan format: 1. An Electronic AutoCad plan must be complete and identical to the official hard copy (paper) project (subdivision, commercial) plat. 2. The AutoCAD plan must be a civil site plan drawing. (The majority of time an electrical site plan drawing does not have the required information.) 3. A single AutoCAD plan drawing containing all the layers should be submitted. 4. AutoCAD plan should be in DWG format. 5. AutoCAD Version can be 2007 or lower. 6. 2D only, not 3D (Please take out reference images and 3D images.) 7. Please take out the topography Layer. 8. Layers relate to a unique set of CAD features within the drawing. (For example all lot lines should be on one layer, street centerlines another layer.) 9. Include the required Layers: Lot Lines, Right of Way lines, Street Centerlines, Buildings, Curbs, Basin, Section Lines, Boundary of Property, Footages, Bearings, Lot Numbers, Street Names, and Tie Down (Section or Quarter Pins.) 10. At least three tie points are required; one must be a Section or a Quarter pin and the others may be street intersections or lot corners. Bearings and distances must be designated from the tie points. 11. Please include the Boundary Line of Property. It must be designated with bearings and distances. 12. Any special fonts, X-REFs, or attachments should be submitted along with the CAD drawing. Please contact me at (520) 917-8745 if you have any questions. Liza Castillo, Right of Way Agent Tucson Electric Power Co. Unisource Energy Services offc-(520) 917-8745 fax-(520) 545-1416 lcastillo@tep.com |
| 01/30/2008 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Gary Ault, Mapping Supervisor Pima County Assessor’s Office Mapping Department DATE: RE: Assessor’s Review and Comments Regarding Final Plat S07-033 Starr Pass Vistas Village II T141316 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor’s Office requirements. _______ Plat does not meet Assessor’s Office requirements. COMMENTS: Thank you for your submittal. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. Susan King |
| 02/29/2008 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | TO: Patricia Gehlen; CDRC Coordinator SUBJECT: Starr Pass Vistas Village 2 (S07-033) Final Plat and assurances Review REVIEWER: Elizabeth Eberbach LOCATION: T14S R13E Section 16 ACTIVITY NUMBER: S07-033 SUMMARY: The Final Plat (received to Engineering on 22FEB08), assurance documents, CC&R's for original plat, and title report were received and reviewed for Final Plat conformance. The Final Plat and assurances are not recommended for approval at this time until comments are addressed. FINAL PLAT COMMENTS: 1) City of Tucson Development Standards (DS) Section No. 2-03.7: Submittal of the final plat prior to complete approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat. Address all Tentative Plat conditions of approval prior to resubmittal of Final Plat. 2) Assure that the descriptions of the common areas of the Final Plat title block match the CC&R's descriptions of the subdivision common areas and the descriptions in the assurance paperwork. Please be aware that the City of Tucson's legal office may reject the assurance paperwork if the verbiage does not match exactly the verbiage on the Final Plat's Title Block. 3) DS Sec.2-03.6.1.L: Address the following legend comments: a) Add EHS line for clarification in legend. b) Clarify on planview or legend the 25' wash buffer zone (ERZ) or 25' ERZ wash buffer zone. 4) DS Sec.2-03.6.2.E: Revise/update general note 8: "Prior to issuance of any building permit, a Flood Plain Use Permit is required for lots (as provided) as well as street improvement." 5) Add general note regarding individual grading permits for each lot. 6) DS Sec.2-03.6.4.I: Show any applicable minimum geotechnical basin setback in lots 9, 10, 41, and 42. 7) DS Sec.2-03.6.5.C.5: Address the following survey comments: a) DS Sec.2-03.6.5.C.3: Provide parcel boundary legal description as well as project boundary closure calculations with closing error. b) For planview sheets, add recorded, measured, or calculated labeling plat boundary data. c) DS Sec.2-03.6.4.F: For the surveyable EHS and 100-year floodprone limits, show more/additional frequent ties to intersecting lot lines. Check / clarify lots 17 and 24. Check data for clarity; it may be necessary to use crow's feet for some lengths. 8) DS Sec.2-03.6.5.B: Address the easement comments: a) Assure Title Report Schedule B items 4 and 5 are addressed on the plat. Any easements shall be shown with docket and page, or title report updated for any abandonments. b) Delineate and label a private drainage maintenance easement near lots 17 and 23 and any other lots, for the pipe culverts. 9) DS Sec.2-03.6.6.A: Only a copy of the original plat's CC&R's were submitted. Address the following CC&R comments: a) DS Sec.10-02.14.3.2: An original signed copy of the CC&R's will be required for Final Plat approval. For plat approval, the Covenants, Conditions, and Restrictions (CC&Rs) or Final Plats (cover sheet notes) shall have the following statements: i) that the owner or owners shall be solely responsible for operation, maintenance, and liability for drainage structures and detention basins; ii) that the owner or owners shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for the drainage and detention/retention facilities at least once each year, and that these regular inspection reports will be on file with the owner for review by City staff, upon written request; iii) that City staff may periodically inspect the drainage and detention/retention facilities to verify that scheduled and unscheduled maintenance activities are being performed adequately; and iv) that the owner or owners agree to reimburse the City for any and all costs associated with maintaining the drainage and detention/retention facilities, should the City find the owner or owners deficient in their obligation to adequately operate and maintain their facilities. b) Address the following other CC&R's comments: i) Assure that the description of the project on the Final Plat title block match the CC&R's description of the subdivision on page one of the CC&R's. ii) Add case number S07-033 to first sheet of CC&R's. c) Add easement maintenance verbiage to CC&R's or a general note to the Final Plat cover sheet: All erosion protection and revegetation in all easements shall be the responsibility of the Homeowners Association. CC&R'sArticle IX or other section may need to be revised. 10) DS Sec.10-02.14.3.2, DS Sec.2.3.1.6.C: The CC&R's shall also provide the list of maintenance recommendations for the drainage areas (drainage channels, basins, culverts, and other drainage structures or improvements) as outlined in the project's Drainage Report or as provided by the project's engineer and accepted by the City of Tucson DSD engineer. ASSURANCES COMMENTS: 11) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved. Submit the following for the assurance package: a) Address the following third party trust subdivision assurances comments: i) Revise Final Plat Title Block to match subdivision description for "private streets". ii) Assure that all exhibits are attached; AGREEMENT TO CONSTRUCT is missing the Exhibit A. iii) Assure that each page of the AGREEMENT TO CONSTRUCT and AMENDMENT TO TRUST has page numbering; iv) Assure the case number "S07-033" is each page of the AGREEMENT TO CONSTRUCT and AMENDMENT TO TRUST; b) For this and future projects, please provide a 8½" by 11" location map sheet for assurance submittals that go to Mayor & Council. Typically, these are similar to an enlarged location map on Final Plats. i) Provide the following for the resubmittal: (1) original copy of the AGREEMENT TO CONSTRUCT SUBDIVISION IMPROVEMENTS / THIRD PARTY TRUST with the assurable items list; (2) original copy of the AMENDMENT TO TRUST / THIRD PARTY TRUST; (3) copy of the original Trust Agreement; (4) copy of a sample Warranty Deed; (5) copy of the current Title Report. 12) DS Sec.2-03.6.3: The Tucson City Clerk, Kathleen S. Detrick, is retiring. Effective February 2, 2008, all correspondence for the City Clerk should be addressed to Roger W. Randolph per the City Clerk's Office. Mr. Randolph will serve as the City Clerk until such time as a City Clerk is appointed by Mayor and Council. Revise Approvals section verbiage on sheet 1 to state: "The undersigned, Roger W. Randolph, Clerk of the City of Tucson, Arizona, hereby certifies that this plat was approved by the Mayor and Council of the City of Tucson, Arizona, on this __ day of ________, 200__. Submit the revised Final Plat, revised CC&R's, copy of the title report, boundary closure info, an revised assurance package, and response letter. You may call to go over these comments, or if you have any questions, please call me at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
| 03/03/2008 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES March 3, 2008 Mirela Hromatka Rick Engineering Company, Inc. 1745 East River Road, Suite 101 Tucson, Arizona 85718 Subject: S07-033 Starr Pass Vistas Village II Final Plat Dear Mirela: Your submittal of December 19, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 5 Copies Revised Final Plat (Addressing, Zoning, TEP, Engineering, DSD) 2 Copies Boundary Closure Calculations (Engineering, DSD) 2 Copies Title Report (Engineering, DSD) 3 Copies CC&R's (Zoning, Engineering, DSD) Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 322-6956 fpresubmittal |
| 12/19/2007 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 12/24/2007 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approv-Cond | December 21, 2007 To: Mirela Hromatka Rick Engineering Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department ___________________________ From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County Departments of Wastewater Management and Environment Quality Subject: Starr Pass Vistas Village II, Lots 1-43 & Common Areas "A" & "B-1"- "B-4" & "C-1" - "C-2" An RCP Subdivision Final Plat – 1st Submittal S07-033 The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. Sheet 1: In the Dedication Block, second paragraph, first line after the word PUBLIC add the words ,PIMA COUNTY. Do the same in the fifth paragraph , third line. We have sent to your office via e-mail, a .pdf file containing a Sewer Service Agreement for the proposed number of residential lots. Three originals will need to be printed out from this file for notarized signatures by the Owner of Record. The three signed originals of the Agreement must be returned to this office in order to satisfy the necessary requirements needed to approve the Mylars of the tentative or preliminary plat. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above-mentioned comments, please contact me. |