Plan Number: S07-031
Parcel: Unknown

Address:
4416 E EDISON ST

Review Status: Completed

Review Details: RESUBMITTAL- RECORD OF SURVEY

Plan Number - S07-031
Review Name: RESUBMITTAL- RECORD OF SURVEY
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/11/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
06/25/2007 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved 4350 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702


WR#178624 June 25, 2007

Steven Stratigouleas
254 E Camino Lomas
Tucson, Arizona 85704

Dear Mr. Stratigouleas :

SUBJECT: Edison Lots Resubmittal
S07-031

Tucson Electric Power Company has reviewed and approved the development plan submitted June 11, 2007. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. TEP will need a full set of approved site, electrical load, paving off-site improvements and irrigation plans.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.

In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to:

Tucson Electric Power Company
Attn: Ms. Mary Boice
New Business Project Manager
P. O. Box 711 (DB-101)
Tucson, AZ 85702
520-917-8732

Please call the area Designer Mike Kaiser at (520) 918-8244, should you have any questions.

Sincerely,


Elizabeth Miranda
Office Support Specialist
Design/Build
lm
Enclosures
cc: DSD_CDRC@tucsonaz.gov, City of Tucson (email)
M. Kaiser, Tucson Electric Power
06/26/2007 KAROL ARAGONEZ ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: S07-031
Edison Lots
Record of Survey Resubmittal

TRANSMITTAL DATE: June 22, 2007

DUE DATE: July 10, 2007

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. Provide a north arrow next to scale in location map.

2. Within the title block provide the number of proposed lots.

3. After the CERTIFICATE OF SURVEY paragraph add signature and date line for signature of surveyor, dates signed and surveyor's seal.

4. The following information regarding existing utilities will be provided: the location and size of water lines including the pipe diameter. Add the locations of gas lines, electric and telephone lines, poles, and on-ground junction boxes, and street lights. If water mains and sewers are not located on or adjacent to the tract, indicate the direction, distance to, and sizes of those nearest the property.

5. Please show locations of all proposed driveways.

6. The record of survey indicates a five (5) foot walk. Five (5) foot wide concrete sidewalks must be installed along the frontage of the properties prior to approval of the record of survey.

7. Please indicate in the response letter if properties are vacant. If vacant remove building pads and dimensions of lots to be split. If there are existing structures provide a supplemental sheet providing setbacks, building heights, and lot coverage for each lot (plot plans). This information is not to be added to the actual record of survey. For R-2 zoned property the requirements are:
Minimum lot size - 5,000 sq. ft.
Maximum lot coverage cannot exceed 70 percent
One (1) house per lot
Maximum building height - 25 ft.
Side and rear setbacks are the greater of six (6) feet or 2/3 the height of the building wall from property line.
Street setback is the greater of twenty (20) feet or 1 ½ the height of the building wall from property line

If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 74960.

KAA S:\zoning review\karol\planning\cdrc\tentativeplat\S07-031rsr.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised record of survey and additional requested sheets.
07/05/2007 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S07-031 EDISON LOTS/REVISED RECORD OF SURVEY
DATE: 7/05/07



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:


1.) Add Street to Edison and Avenue to Ralph on Location Map.

2.) Delete all parcel codes and addresses per letter dated 4/09/07.

3.) Spell out all street suffixes except on Location Map per letter dated 4/09/07.

4.) Label lots consecutively per letter dated 4/09/07.

5.) Add lots 1-3 on all Title Blocks per letter dated 4/09/07.

6.) Change Towner Addition Book 4 to Book 7 on all Title Blocks per letter dated 4/09/07.

7.) Change Colombus to Columbus.

es
07/06/2007 FRODRIG2 PIMA COUNTY WASTEWATER Denied June 11, 2007

To: Michael Scherrer
Scherrer Land Surveys

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

____________________________________
From: Felipe Ip, Sr. Civil Eng. Assistant, Development Review Division
Pima County Development Services Department


Subject: 2145 N. Ralph Ave. The S1/2 of Lot 25 & the N1/2 of Lot 26, Towner Addition
Record of Survey – 2nd Submittal, S07-031


The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

Provide a letter from the PCWMD's Development Services Section, written within the past 90 days, stating that treatment and conveyance system capacity for the project is available in the downstream public sewerage system and provide a copy of that letter to this office. The required form to request such a letter may be found at:

http://www.pima.gov/wwm/forms/docs/CapResponseRequest.pdf.

The record of survey for this project cannot be approved until a copy of this letter has been received by this office.

In the second paragraph of the Dedication Block, add “Pima County” after “the Public” so it states “We hereby grant to the Public, Pima County and all utility companies all easements as shown hereon for the purposes of access, installation, and maintenance of public sewers and utilities and other uses as designated by this plan.”

Add a Permitting Note so it states:

A PROJECT CONSTRUCTION PERMIT MUST BE SECURED FROM THE PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT BEFORE BEGINNING ANY WORK ON THIS PROJECT.
Please sign the seal of the surveyor.

This office will require a revised set of plan, and a response letter, addressing these comments. Additional comments may be made during the review of these documents.

The next submittal of this project will be the 3rd submittal. A check for the review fee of this submittal in the amount of $39.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of plan and response letter.

If you have any questions regarding the above mentioned comments, please do not hesitate to contact me 520-740-6706.

CC: Project file
07/11/2007 PATRICIA GILBERT ENGINEERING REVIEW Denied TO: Patricia Gehlen; CDRC Coordinator DATE: July 811 2007

SUBJECT: Engineering review of the Edison Lots, Record of Survey. The activity number is S07-031.

SUMMARY: The Record of Survey was received by Engineering on June 11th, 2007. Engineering has reviewed the received items and does not recommend approval of the Record of Survey.

RESUBMITTAL REQUIRED: RECORD OF SURVEY


RECORD OF SURVEY COMMENTS

1. Identify each lot by number. DS 2-03.11.12.D.

2. At least one (1) corner of the property will be tied by course and distance to a section corner or a quarter section corner. The plan must include a description of that corner marker and an indication of how the bearings were determined. Corner tie recordation information is to be provided on the plan. DS 2-03.10.A.

3. Show locations of all proposed driveways. A driveway can only access two units. DS 2-.3.11.12.E.
07/12/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

July 12, 2007

Lisa Bowers
Metro Permit Express
3619 East Speedway Blvd., Suite 101
Tucson, Arizona 85716

Subject: S07-031 Edison Lots Record of Survey

Dear Lisa:

Your submittal of June 11, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

5 Copies Revised Record of Survey and supplement sheets (Zoning, Addressing, Engineering, Wastewater, DSD)






Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 881-2450
Tp-resubmittal
07/12/2007 PATRICIA GEHLEN ZONING-RECORDATION REVIEW Needs Review