Plan Number: S07-025
Parcel: Unknown

Address:
7710 S WILMOT RD

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Plan Number - S07-025
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2008 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved Please post

>>> <LCastillo@tep.com> 01/03/2008 7:09 AM >>>

-----Original Message-----
From: Castillo, Liza
Sent: Thursday, December 27, 2007 12:50 PM
To: 'DSD_CDRC@tucsonaz.gov'
Cc: 'Antony C. Tsang'
Subject: RE: WILMOT/I-10 COMMERCIAL CENTER - S07-025


TEP approves the tentative plat, however the final plat is not approved
and must show the correct easement recording information.
Should you have any questions regarding this you can reach me at (520)
917-8745.

Liza Castillo, Right of Way Agent
Tucson Electric Power Co.
Unisource Energy Services
offc-(520) 917-8745
fax-(520) 545-1416
lcastillo@tep.com

-----Original Message-----
From: Castillo, Liza
Sent: Friday, December 21, 2007 11:25 AM
To: 'DSD_CDRC@tucsonaz.gov'
Cc: 'Antony C. Tsang'
Subject: WILMOT/I-10 COMMERCIAL CENTER - S07-025




SUBJECT: WILMOT/I-10 COMMERCIAL CENTER

S07-025



Tucson Electric Power Company (TEP) has reviewed the final plat
submitted December 18 2007. TEP is unable to approve the plat at this
time.



There are two TEP Right of Way easements within the boundaries
of this development. In order for TEP to approve the plat the easements
must be shown accurately with the correct recording information:
(Docket-12769 Page-1617) & (Docket-12444 Page-1040). See attached.



Please contact me at (520) 917-8745 if you have any questions.


Liza Castillo, Right of Way Agent
Tucson Electric Power Co.
Unisource Energy Services
offc-(520) 917-8745
fax-(520) 545-1416
lcastillo@tep.com
01/04/2008 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved >>> "Tom Martinez" <TMartinez@azdot.gov> 01/04/2008 7:26 AM >>>
ADOT has no comments on this review.

--------------------------------------------------------


Confidentiality and Nondisclosure Notice: This email transmission and any attachments are intended for use by the person(s)/entity(ies) named above and may contain confidential/privileged information. Any unauthorized use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, please contact the sender by email, and delete or destroy all copies plus attachments.
01/07/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

January 7, 2008

A.C. Tsang Engineering Group, Inc.
Antony C. Tsang
4626 East Fort Lowell, Suite S
Tucson, Arizona 85712

Subject: S07-025 Wilmot/I-10 Commercial Center Tentative Plat

Dear Tony:

The above referenced plan has been CONDITIONALLY APPROVED by the Community Design Review Committee, subject to the revisions required on the mylars. Please submit the following documents for sign-off:

1 Reproducible Océ or Photo Mylar of the Plat, Landscape Plan and NPPO
2 CD that contains all of the drainage/hydrology and other report submitted for the review and approval of this plan.

Additional blackline copies will be made from the complete set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your mylars to the CDRC office for sign-off approval. Your printing company will deliver the mylar and three (3) blackline copies to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options.

Please note that the final plat must be approved by Mayor and Council and recorded within one year of date of approval of the tentative plat per LUC 4.1.7.3.

TO ENSURE A MORE RAPID REVIEW OF THE MYLARS, PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.ci.tucson.az.us/dsd/CDRC Rezoning/CDRC/CDRC Stamp/cdrc stamp.html.

PRIOR TO SUBMITTING THE MYLARS TO THE CDRC OFFICE, THE MYLARS MUST BE REVEIWED AND APPROVED BY PCWWM. THE APPROVAL MUST BE IN WRITING (E-MAIL IS OKAY)

Should you have any questions, please call me at 837-4919.

Sincerely,

Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/
Via fax: 325-0979
12/17/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
12/21/2007 ELIZABETH EBERBACH ENGINEERING REVIEW Approv-Cond TO: Patricia Gehlen; CDRC Coordinator
FOR: A. C. Tsang Engineering
SUBJECT: Wilmot/I-10 Commercial Center Tentative Plat 3rd Re-submittal Engineering Review
REVIEWER: Elizabeth Eberbach
ACTIVITY NUMBER: S07-025

SUMMARY: The revised Tentative Plat submittal was reviewed for code compliance and against the rezoning conditions. Development Services Department Engineering Division recommends conditional approval of the Tentative Plat and recommends mylar submittal if other review entities concur. The discussion of the floodplain analysis is acknowledged. The revised Drainage Report was reviewed for Tentative Plat purposes only.

TENTATIVE PLAT CONDITIONS OF MYLAR APPROVAL:
Label Q100 outlets from the CMP's on the mylar plat.

If you have questions or would like to set up a meeting, call me at 837-4934.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services
12/27/2007 CDRC1 PIMA COUNTY WASTEWATER Approv-Cond December 26, 2007


To: Antony Tsang
Tsang Engineering

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

___________________________
From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environment Quality

Subject: Wilmot / I10 Commercial Center, Blocks 1-6
Tent. Plat - 4th Submittal
S07-025

The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

1. Sheet 1: New MH#1 has not been called out on plan and is also missing the rim and invert elevations.

2. Sheet 1: The private stubouts shown on plan appear to be in the public ROW which is not acceptable. PCWMD suggests blockouts instead of stubouts in this case.

3. Sheet 2: Revise General Note #22 to read as follows:

THE ON-SITE SANITARY SEWAGE COLLECTION LINES WILL BE PUBLIC AND DESIGNED AND CONSTRUCTED TO PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT STANDARDS. ALL BUILDING CONNECTION SEWERS WILL BE PRIVATELY MAINTAINED.

4. Sheet 1: Clearly show how the existing convenience store is going to be sewered and also if there is an easement for the existing public sewer on this lot, show it on plan with recordation information.

This office will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents.

Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the development plan. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet.

The next submittal of this project will be the fifth submittal. A check for the review fee of this submittal in the amount of $39.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of bluelines and response letter.

If the number of sheets changes, please adjust the review fee accordingly.

If you have any questions regarding the above-mentioned comments, please contact me.
12/27/2007 CDRC1 PIMA COUNTY WASTEWATER Approv-Cond December 27, 2007


To: Antony Tsang
Tsang Engineering

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

___________________________
From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environment Quality

Subject: Wilmot / I10 Commercial Center, Blocks 1-6
Tent. Plat - 4th Submittal(Rev)
S07-025

The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

1. Sheet 1: The private stubouts shown on plan appear to be in the public ROW which is not acceptable. PCWMD suggests blockouts instead of stubouts in this case or direct connect w/4" line outside of public easement.

2. Sheet 2: Revise General Note #22 to read as follows:

THE ON-SITE SANITARY SEWAGE COLLECTION LINES WILL BE PUBLIC AND DESIGNED AND CONSTRUCTED TO PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT STANDARDS. ALL BUILDING CONNECTION SEWERS WILL BE PRIVATELY MAINTAINED.

Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan. The required revision(s) may be shown on the Mylars.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.

If you have any questions regarding the above-mentioned comments, please contact me.