Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Plan Number - S06-267
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/02/2008 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
06/11/2008 | ANDY STEUART | COT NON-DSD | REAL ESTATE | Approved | No comment. |
06/12/2008 | STEVE SHIELDS | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Enclave at Sarnoff S06-267 Final Plat (2nd Review) TRANSMITTAL DATE: June 12, 2008 DUE DATE: June 30, 2008 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. The Zoning Review Section conditionally approves the final plat for this subdivision, subject to the following changes on the executed final plat and the recorded Covenants, Conditions, and Restrictions. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements. 2. D.S. 2-03.6.3.D Zoning acknowledges that a prior comment asked that the Approval block be revised to show "ROGER W. RANDOLPH" as the Clerk of the City of Tucson. Please remove "ROGER W. RANDOLPH" and provide a blank space to be filled in at a later date. 3. D.S. 2-03.6.6 The provided Covenants, Conditions, and Restrictions (CC&Rs) do not address maintenance for Common Area "B" (Landscape Buffer). Revise the CC&Rs. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C\planning\cdrc\finaplat\S06-267fp-2nd.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat, CC&R's and additional requested documents. |
06/18/2008 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: ENCLAVE AT SARNOFF Lots 1-10 S06-267 Tucson Electric Power Co. (TEP) approves the final plat submitted June 2, 2008. Please forward any resubmittals of the final plat to this office. Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission. Please contact me at (520) 917-8745 if you have any questions. Liza Castillo, Right of Way Agent II Tucson Electric Power Co. Unisource Energy Services offc-(520) 917-8745 fax-(520) 545-1416 lcastillo@tep.com |
06/20/2008 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approved | June 20, 2008 To: Lloyd Rogers Rogers Civil Engineering Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department ___________________________ From: Tom Porter, Sr. CEA (520-740-6579), representing the Pima County Departments of Wastewater Management and Environment Quality Subject: Enclave @ Sarnoff Lots 1-10 and Common Area “A” and “B” Final Plat – 2nd submittal S06-267 The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Regional Wastewater Reclamation Department (RWRD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat as submitted. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above-mentioned comments, please contact me. |
06/23/2008 | JASON GREEN | ENGINEERING | REVIEW | Approv-Cond | DATE: June 23, 2008 SUBJECT: Enclave At Sarnoff Final Plat- 2nd Engineering Review TO: Patricia Gehlen, CDRC Manager LOCATION: 3727 S Sarnoff Road, T14S R15E Sec28 Ward 4 REVIEWERS: Jason Green, CFM ACTIVITY: S06-267 SUMMARY: Engineering Division of Development Services Department has received and reviewed the submitted Final Plat, Covenants, Conditions and Restrictions (CC&Rs), Assurance Package and a copy of the Title Report. Engineering Division recommends conditional approval of the Final Plat at this time. Prior to Mylar submittal the following items need to be addressed: FINAL PLAT COMMENTS: 1) DS Sec.2-03.6.3.A: DS Sec.2-03.6.3.A: For Final Plat Mylar approval the Certificate of Survey section must be sealed and signed by the Land Surveyor, Todd Hout prior to Mylar submittal. For future projects if the registrant does not want to sign the seal that is required on the document until Mylar submittal than the word "Preliminary" must be used across the registrants seal for initial review. Per the Rules of the AZ State Board R4-30-304.D.1 A registrant shall sign, date, and seal a professional document: 1. Before the document is submitted to a client, contractor, any regulatory or review body, or any other person, unless the document is marked "preliminary," "draft," or "not for construction" except when the document is work product intended for use by other members of a design team; and 2. In all cases, if the document is prepared for the purpose of dispute resolution, litigation, arbitration, or mediation. Provide on the Final Plat Mylar the seal and signature for the Land Surveyor, Todd Hout, which is shown in the Certificate of Survey Section. 2) DS Sec.2-03.6.3.B.1: It is acknowledge that the word "title" has been removed from the language however the word "record" was added in its place. Revise the Final Plat and the Certificate of Title paragraph in the Dedication Section to remove the word "record" prior to the word interest. The paragraph must read exactly as stated within the referenced section. GENERAL COMMENTS: Provide the revised Final Plat Mylar Set to CDRC for review and approval prior to submittal to Mayor and Council. The Final Plat Mylar must address the comments provided above. Be advised that if all comments have not been addressed at the Mylar stage this will cause a delay in the Mayor and Council submittal. If you have any questions, I can be reached at (520) 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division COT Development Services |
06/24/2008 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES June 24, 2008 Lloyd W. Rogers P.E. Rogers Civil Engineering 1765 West Klamath Drive Tucson, Arizona 85704 Subject: S06-267 Enclave at Sarnoff Final Plat Dear Lloyed: The above referenced project has been CONDITIONALLY APPROVED by the Community Design Review Committee. Please make any necessary corrections and submit the following documents: (2) Title reports current within the last thirty (30) days. (1) Executed Final Plat Double Matte Océ or Photo Mylar. (1) * 81/2"X11" copy of plat and (3) 11"X17" copies of the plat (1) * Check in the amount of $55.00 per plat page for recorded plat distribution made payable to the local print company that has access to Pima County Recorders on line platting system or provide an account number to charge. (1) Check made payable to "Pima County Recorder" in the amount of $20.00 per plat page plus a $4.00 handling fee, along with CC&R fees if applicable. CC&R fees are $9.00 for the first 5 pages and $1.00 for each additional page and fees for consent(s) to dedicate, if applicable. (2) Executed and notarized CC&R's document (if applicable) and Assurance Package (if applicable). One original set and one copy of each. Assurances (if applicable) must be reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CC&R's and assurances must be approved at the same Mayor and Council Meeting. Please expect 7 - 8 weeks from the date submitted to the date scheduled for Mayor and Council approval. Should you have any questions, please call me at 837-4919. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 888-8571 Fp-approved |