Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Plan Number - S06-235
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/15/2008 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
10/08/2008 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Approved | DEPARTMENT OF URBAN PLANNING & DESIGN COMMENTS Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: S06-235 CASE NAME: Wootton Property, TP DATE SENT: Items reviewed: Tentative Plat and Landscape Plan Cross Reference Cases: N/A; C9-97-24 denied M&C, Nov. 15, 2005 Area or Neighborhood Plan: Bear Canyon Neighborhood Plan Gateway or Scenic Route: Houghton Rd. is Scenic Route Due Date: October13, 2007 Comments: Staff's comments from December 10, 2007 have been satisfactorily addressed. The plans are APPROVED. No additional submittal is required. Joanne Hershenhorn, 837-6965 date: 10-6-08 |
10/09/2008 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | Approval dependent on field visit (10-13-08) concerning the clean up of debris on the bank of the Aqua Caliente Wash. PM. 10-09-08. |
10/10/2008 | GLENN HICKS | COT NON-DSD | PARKS & RECREATION | Approved | DATE: October 10, 2008 TO: DSD_CDRC@ tucsonaz.gov FROM: Glenn Hicks Parks and Recreation 791-4873 ext. 215 Glenn.Hicks@tucsonaz.gov SUBJECT: S06-235 Wootton Property: Resubmittal Tentative Plat(09-16-08) Approved. |
10/10/2008 | DAVID RIVERA | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: S06-235 Wooton Property Tentative Plat Resubmittal TRANSMITTAL DATE: October 10, 2008 DUE DATE: October 13, 2008 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Whether these roadways are within an easement they are considered a private street. List the miles or percent of miles in general note 10. This would include the (Previous Comment: Please add to general note 10 "The total miles of new private streets are _____". Both private and public miles must be stated.) DS 2-03.2.2.D.1.b 2. A DSMR request was requested for the visitor parking areas. One of the parking areas was approved the other was denied. Due to the denial of one of the visitor parking areas (between lots 3 and 4) the drawing must be modified to provide the applicable parking lot design. The DSMR case number must be listed as reference in the lower right corner next to the title block of all plan sheets and the DSMR case number, date of approval, and conditions of approval must be listed as a general note on sheet one. (Previous Comment: Please provide a detail of both proposed visitor parking areas. When the street cross section does not allow for on-street parking, visitor parking space calculations and common areas must be clearly indicated on the plan in conformance with the distribution criteria listed in Sec. 3-05.2.4.A.1. The detail should show parking space dimensions, PAAL required widths, and back up areas as required by DS 3-05.0 for vehicle use areas.) 3. The sidewalk area along the back of the parking spaces between lots 3 and 4 must be relocated along the sides and the front of the parking spaces. (Previous Comment: Visitor parking spaces should be provided within one hundred fifty (150) feet of the front or street side yard property lines of each residential unit as accessed from provided sidewalk. Visitor parking cannot be located on a residentially zoned lot for use by other than the owner of the lot on which the parking is located. Easements over both designated visitor parking areas is required. For the visitor parking area to be within one hundred and fifty (150) feet of lots 2 and 3 a crosswalk with HC ramps and additional sidewalk area will need to be provided.) 4. See comment two. Previous Comment: A DSMR would need to be approved to allow visitor parking to be placed at a ninety (90) degree angle from the street, utilizing the street for maneuvering. 5. Define or delineate the access easement over the common area. It is not clear on the plan where the north access easement line is located. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised tentative plat. |
10/20/2008 | FERNE RODRIGUEZ | PDEQ | PIMA COUNTY DEPT OF ENVIRONMENTAL QUALITY | Approved | DATE: October 20, 2007 TO: Patricia Gehlen, CDRC Mgr., City of Tucson Development Services Dept. FROM: Robert E. Flynt, Public Works Manager Development Review Division (Environmental Quality Section) SUBJECT: Wootton Property, Lots 1-7 Plat # S06-235 The final plat has been reviewed for conformance with Department of Environmental Quality requirements. Please note the following comments: 1. The Final Plat is approved. Any grading land clearing or earthmoving of more than one acre, more than 50 feet of road construction, or more than 300 feet of trenching will require an Air Quality Activity Permit. These permits must be obtained prior to commencement of construction. |
10/23/2008 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES October 23, 2008 Carl Bueter Urban Engineering, Inc 877 South Alvernon Way, Suite 200 Tucson, Arizona 85711 Subject: S06-235 Wotton PropertyTentative Plat Dear Carl: The above referenced plan has been CONDITIONALLY APPROVED by the Community Design Review Committee, subject to the revisions required on the bluelines per the on-line comments. Please submit the following documents for sign-off: 1 Blueline set of the Plat, Landscape Plan and NPPO. Please include applicable sheets from any other concurrent reviews. 2 CD that contains all of the drainage/hydrology and other reports submitted for the review and approval of this plan. Additional blackline copies will be made from the complete set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your bluelines to the CDRC office for sign-off approval. Your printing company will deliver the stamped blueline set and three (3) blackline copies to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options. Please note that the final plat must be approved by Mayor and Council and recorded within one year of date of approval of the tentative plat per LUC 4.1.7.3. PLEASE HAVE THE CITY OF TUCSON APPROVAL STAMP PLACED ON EACH SHEET OF THE SUBMITTAL SET, PREFERABLY IN THE LOWER RIGHT HAND CORNER NEAR THE TITLE BLOCK. THE STAMP IS LOCATED AT http://www.tucsonaz.gov/dsd/CDRC___Rezoning/CDRC/CDRC_Stamp/cdrc_stamp.html. BLUELINE SETS THAT DO NOT HAVE THE STAMP WILL BE RETURNED FOR CORRECTION. Should you have any questions, please call me at 791-5608 extension 1179. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 318-3808 tp-approved |