Plan Number: S06-185
Parcel: Unknown

Review Status: Completed

Review Details: ASSURANCES

Plan Number - S06-185
Review Name: ASSURANCES
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/24/2008 FERNE RODRIGUEZ START ASSURANCES RECEIVED Completed
07/23/2008 ELIZABETH EBERBACH ENGINEERING REVIEW Denied TO: Patricia Gehlen; CDRC Coordinator
SUBJECT: Starr Pass Vistas Village 1 (S06-185) Final Plat and assurances 3rd Review
REVIEWER: Elizabeth Eberbach
LOCATION: T14S R13E Section 16
ACTIVITY NUMBER: S06-185

SUMMARY: The revised Final Plat, assurance documents, revised CC&R's, boundary closure documents, title report, and response letter were received and reviewed for Final Plat conformance. This subdivision project is subject to ERZ and HDZ overlay applicability and is adjacent to ERZ Silvercroft Wash. The Final Plat and assurances are not recommended for approval at this time until the remaining assurances and Final Plat comments are addressed.

FINAL PLAT COMMENTS:
1) City of Tucson Development Standards (DS) Section No. 2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved. Address the remaining assurance comments:
a) In the Agreement to Construct, update Assurable item 8 to include both " … onsite and offsite improvements …"
b) Provide exhibit "A" for the Amendment.
2) DS Sec.2-03.6.1.L: If TOB line is not surveyed and specifically added to the engineer's certification statement, then this line should be removed (see comment below).
3) DS Sec.2-03.6.5.C.5: Address the remaining survey comments:
a) On sheet 3, remove extra lines that are either outside of Village 1 boundary or that are not surveyed such as the TOB delineations and the western dashed BEHS line. Add BEHS to legend.
b) On sheet 2 check text for "48" near label "FL47".
c) DS Sec.2-03.6.4.F: For the surveyable 100-year floodprone limits, show frequent ties to intersecting lot lines.
4) DS Sec.2-03.6.5.B: Explain in response letter, the purpose of Docket 8608 Page 545 (116-26-205D), adjacent to project parcel on northeast corner of project. Provide documentation from Tucson Water accepting proposed improvements in parcel 116-26-205D. It was stated in the response letter that there was a document submitted - none was found - please submit and explain what type of utility this is.
5) DS Sec.2-03.6.6: Provide an original signed copy of the CC&R's.

Submit the revised Final Plat, original signed copy of the CC&R's, copy of the title report, a revised assurance package, location map, documentation from Tucson Water, and response letter. If you have any questions, please call me at 837-4934.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services
07/23/2008 ELIZABETH EBERBACH ENGINEERING REVIEW Denied TO: Patricia Gehlen; CDRC Coordinator
SUBJECT: Starr Pass Vistas Village 1 (S06-185) Final Plat additional Review
REVIEWER: Elizabeth Eberbach
LOCATION: T14S R13E Section 16
ACTIVITY NUMBER: S06-185

SUMMARY: The revised Final Plat, assurance documents, revised CC&R's, boundary closure documents, title report, and response letter were received and reviewed for Final Plat conformance. This subdivision project is subject to ERZ and HDZ overlay applicability and is adjacent to ERZ Silvercroft Wash. Final Plat assurance comments must be addressed for further processing for Mayor and Council scheduling. The Final Plat is conditionally approved.

FINAL PLAT COMMENTS:
1) City of Tucson Development Standards (DS) Section No. 2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are completely approved. Address the remaining assurance comments:
a) In the Agreement to Construct, update Assurable item 8 to include both " … onsite and offsite improvements …"
b) Provide exhibit "A" for the Amendment.
2) The following items will be checked at mylar stage, as discussed with Mirela Hromatka at the counter and phone conversations.
a) DS Sec.2-03.6.1.L: If TOB line is not surveyed and specifically added to the engineer's certification statement, then this line should be removed (see comment below).
b) DS Sec.2-03.6.5.C.5: Address the remaining survey comments:
i) On sheet 3, remove extra lines that are either outside of Village 1 boundary or that are not surveyed such as the TOB delineations and the western dashed BEHS line. Add BEHS to legend.
ii) On sheet 2 check text for "48" near label "FL47".
iii) DS Sec.2-03.6.4.F: For the surveyable 100-year floodprone limits, show frequent ties to intersecting lot lines, as discussed at the counter and with the drafter.
c) DS Sec.2-03.6.5.B: Explain in response letter, the purpose of Docket 8608 Page 545 (116-26-205D), adjacent to project parcel on northeast corner of project. Provide documentation from Tucson Water accepting proposed improvements in parcel 116-26-205D. It was stated in the response letter that there was a document submitted - none was found - please submit and explain what type of utility this is.
d) DS Sec.2-03.6.6: Provide an original signed copy of the CC&R's.

Submit the revised Final Plat mylar, original signed copy of the CC&R's, copy of the title report, a revised assurance package, location map, documentation from Tucson Water, and response letter. If you have any questions, please call me at 837-4934.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services