Plan Number: S06-185
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S06-185
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/23/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
07/07/2008 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: STARR PASS VISTAS VILLAGE I

Lots 1-30

S06-185



Tucson Electric Power Co. (TEP) approves the final plat submitted June
25, 2008.

Please forward any resubmittals of the final plat to this office.



Electric service will be provided to this subdivision in accordance with
the rules and regulations approved by the Arizona Corporation
Commission.



Please contact me at (520) 917-8745 if you have any questions.


Liza Castillo, Right of Way Agent II
Tucson Electric Power Co.
Unisource Energy Services
offc-(520) 917-8745
fax-(520) 545-1416
lcastillo@tep.com
07/22/2008 ELIZABETH EBERBACH ENGINEERING REVIEW Passed See comments for both Assurances and Final Plat.
08/26/2008 ELIZABETH EBERBACH ENGINEERING Assurances and Final Plat review Approv-Cond TO: Patricia Gehlen; CDRC Coordinator
SUBJECT: Starr Pass Vistas Village 1 (S06-185) Final Plat and assurances 3rd Review
REVIEWER: Elizabeth Eberbach
LOCATION: T14S R13E Section 16
ACTIVITY NUMBER: S06-185

SUMMARY: The revised Final Plat, assurance documents, revised CC&R's, boundary closure documents, title report, and response letter were received and reviewed for Final Plat conformance. This subdivision project is subject to ERZ and HDZ overlay applicability and is adjacent to ERZ Silvercroft Wash. The Final Plat and assurances are not recommended for approval at this time until the remaining assurances and Final Plat comments are addressed.

FINAL PLAT COMMENTS:
1) City of Tucson Development Standards (DS) Section No. 2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved. Address the remaining assurance comments:
a) In the Agreement to Construct, update Assurable item 8 to include both " … onsite and offsite improvements …"
b) Provide exhibit "A" for the Amendment.
2) DS Sec.2-03.6.1.L: If TOB line is not surveyed and specifically added to the engineer's certification statement, then this line should be removed (see comment below).
3) DS Sec.2-03.6.5.C.5: Address the remaining survey comments:
a) On sheet 3, remove extra lines that are either outside of Village 1 boundary or that are not surveyed such as the TOB delineations and the western dashed BEHS line. Add BEHS to legend.
b) On sheet 2 check text for "48" near label "FL47".
c) DS Sec.2-03.6.4.F: For the surveyable 100-year floodprone limits, show frequent ties to intersecting lot lines.
4) DS Sec.2-03.6.5.B: Explain in response letter, the purpose of Docket 8608 Page 545 (116-26-205D), adjacent to project parcel on northeast corner of project. Provide documentation from Tucson Water accepting proposed improvements in parcel 116-26-205D. It was stated in the response letter that there was a document submitted - none was found - please submit and explain what type of utility this is.
5) DS Sec.2-03.6.6: Provide an original signed copy of the CC&R's.

Submit the revised Final Plat, original signed copy of the CC&R's, copy of the title report, a revised assurance package, location map, documentation from Tucson Water, and response letter. If you have any questions, please call me at 837-4934.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services
08/26/2008 ELIZABETH EBERBACH ENGINEERING Assurances and Final Plat review Approv-Cond TO: Patricia Gehlen; CDRC Coordinator
SUBJECT: Starr Pass Vistas Village 1 (S06-185) Final Plat additional Review
REVIEWER: Elizabeth Eberbach
LOCATION: T14S R13E Section 16
ACTIVITY NUMBER: S06-185

SUMMARY: The revised Final Plat, assurance documents, revised CC&R's, boundary closure documents, title report, and response letter were received and reviewed for Final Plat conformance. This subdivision project is subject to ERZ and HDZ overlay applicability and is adjacent to ERZ Silvercroft Wash. Final Plat assurance comments must be addressed for further processing for Mayor and Council scheduling. The Final Plat is conditionally approved.

FINAL PLAT COMMENTS:
1) City of Tucson Development Standards (DS) Section No. 2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are completely approved. Address the remaining assurance comments:
a) In the Agreement to Construct, update Assurable item 8 to include both " … onsite and offsite improvements …"
b) Provide exhibit "A" for the Amendment.
2) The following items will be checked at mylar stage, as discussed with Mirela Hromatka at the counter and phone conversations.
a) DS Sec.2-03.6.1.L: If TOB line is not surveyed and specifically added to the engineer's certification statement, then this line should be removed (see comment below).
b) DS Sec.2-03.6.5.C.5: Address the remaining survey comments:
i) On sheet 3, remove extra lines that are either outside of Village 1 boundary or that are not surveyed such as the TOB delineations and the western dashed BEHS line. Add BEHS to legend.
ii) On sheet 2 check text for "48" near label "FL47".
iii) DS Sec.2-03.6.4.F: For the surveyable 100-year floodprone limits, show frequent ties to intersecting lot lines, as discussed at the counter and with the drafter.
c) DS Sec.2-03.6.5.B: Explain in response letter, the purpose of Docket 8608 Page 545 (116-26-205D), adjacent to project parcel on northeast corner of project. Provide documentation from Tucson Water accepting proposed improvements in parcel 116-26-205D. It was stated in the response letter that there was a document submitted - none was found - please submit and explain what type of utility this is.
d) DS Sec.2-03.6.6: Provide an original signed copy of the CC&R's.

Submit the revised Final Plat mylar, original signed copy of the CC&R's, copy of the title report, a revised assurance package, location map, documentation from Tucson Water, and response letter. If you have any questions, please call me at 837-4934.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services
09/08/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

July 24, 2008

Mirela Hromatka
Rick Engineering Company, Inc.
1745 East River Road, Suite 101
Tucson, Arizona 85718

Subject: S06-185 Starr Pass Vistas Village I Final Plat

Dear Mirela:

Your submittal of June 25, 2008 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

2 Copies Revised Final Plat (Engineering, DSD)

2 Copies Title Report (Engineering, DSD)

2 Copies CC&R's (Engineering, DSD)

2 Copies Documentation for Tucson Water (Engineering, DSD)

2 Copies Assurance Package (Engineering, DSD)



Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 322-6956
09/08/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

September 8, 2008
Mirela Hromatka
Rick Engineering Company, Inc.
1745 East River Road, Suite 101
Tucson, Arizona 85718

Subject: S06-185 Starr Pass Vistas Village I Final Plat

Dear Mirela:

The above referenced project has been CONDITIONALLY APPROVED by the Community Design Review Committee. Please make any necessary corrections and submit the following documents:

(2) Title reports current within the last thirty (30) days.
(1) Executed Final Plat Double Matte Océ or Photo Mylar.
(1) * 81/2"X11" copy of plat and (3) 11"X17" copies of the plat
(1) * Check in the amount of $20.00 per plat page for recorded plat distribution made payable to the local print company that has access to Pima County Recorders on line platting system or provide an account number to charge.
(1) Check made payable to "Pima County Recorder" in the amount of $20.00 per plat page plus a $4.00 handling fee, along with CC&R fees if applicable. CC&R fees are $9.00 for the first 5 pages and $1.00 for each additional page and fees for consent(s) to dedicate, if applicable.
(2) Executed and notarized CC&R's document (if applicable) and Assurance Package (if applicable). One original set and one copy of each.

*Please do not combine the checks for the printing charges. They are processed at different times and require separate checks. An account number is also acceptable and you can include this information on your transmittal sheet when submitting the above listed items.

Assurances (if applicable) must be reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CC&R's and assurances must be approved at the same Mayor and Council Meeting. Please expect 7 - 8 weeks from the date submitted to the date scheduled for Mayor and Council approval.

Should you have any questions, please call me at 791-5608 extension 1179.



Sincerely,


Patricia Gehlen
CDRC Manager