Plan Number: S06-185
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Plan Number - S06-185
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/19/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
07/03/2007 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Approved DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S06-185 Starr Pass Vistas Village 1

(ü) Tentative Plat - RCP
( ) Development Plan
(ü) Landscape Plan
( ) Revised Plan/Plat
( ) Board of Adjustment
( ) Other

CROSS REFERENCE: N/A

NEIGHBORHOOD PLAN: Tumamoc Area Plan, Subarea 4

GATEWAY/SCENIC ROUTE: N/A

COMMENTS DUE BY: July 18, 2007

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

( ) No Annexation or Rezoning Conditions, Not an RCP - No Comment
( ) Proposal Complies with Annexation or Rezoning Conditions
( ) RCP Proposal Complies With Plan Policies
( ) See Additional Comments Attached
(ü) No Additional Comments - Complies With Planning Comments Submitted on 3/28/07 - thank you

(ü) No Resubmittal Required
( ) Tentative Plat
( ) Development Plan
( ) Landscape Plan
( ) Other

REVIEWER: Joanne Hershenhorn 791-4505 DATE: 6/29/07
07/16/2007 JOE LINVILLE LANDSCAPE REVIEW Approved
07/17/2007 KAROL ARAGONEZ ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: S06-185
Starr Pass Vistas Village 1
Tentative Plat Resubmittal

TRANSMITTAL DATE: July 13, 2007

DUE DATE: July 18, 2007

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. Three (3) copies of CC&R were not found in submittal package provided to staff. Review of CC&Rs will be accomplished at final plat submittal.

2. Previous comment. Please provide a detail as to how screening of the mechanical equipment is done. If ground mounted and screened by property walls please provide note stating that. If roof mounted provide a detail showing how screening will be architecturally integrated with the overall design of the RCP.
LUC 3.6.1.4.A.9

Because general note 21 states that ground mounted equipment "may be" screened with yard walls and as such does not provide a definitive answer the comment will remain until a detail is provided or wording revised from may be to will or shall.


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised tentative plat and additional requested documents.

If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 74960.

KAA S:\zoning review\karol\planning\cdrc\tentativeplat\S06-185tpr1tp.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised tentative plat, CC&R's, and additional requested documents.
07/31/2007 GLENN HICKS COT NON-DSD PARKS & RECREATION Approved DATE: July 31, 2007

TO: DSD_CDRC@ tucsonaz.gov

FROM: Glenn Hicks
Parks and Recreation
791-4873 ext. 215
Glenn.Hicks@tucsonaz.gov


SUBJECT: S06-185 Starr Pass Vistas Village I: Resubmittal(6-19-06) CDRC Tentative Plat Review


Approved.
08/10/2007 ELIZABETH EBERBACH ENGINEERING REVIEW Denied TO: Patricia Gehlen; CDRC Coordinator
SUBJECT: Starr Pass Vistas Village 1 (S06-185) Tentative Plat 3rd Review and ERZ / HDZ Overlay review
REVIEWER: Elizabeth Eberbach
LOCATION: T14S R13E Section 16
ACTIVITY NUMBER: S06-185, T07SA00049

SUMMARY: The revised Tentative Plat sheets, revised Drainage Report, geotechnical report, landscape documents, TDOT correspondence, title report, and response letters were received by Engineering for review. The Drainage Report was reviewed for Tentative Plat purposes only. Engineering does not recommend approval of the Tentative Plat at this time.

PROJECT SAC SUMMARY: For this submittal, the Starr Pass Vistas Village 1 project proposes no encroachment into the Silvercroft ERZ Wash. The existing Silvercroft Wash is designated as an ERZ Wash located along the west and north boundaries of the project. The wash is a natural channel with sand, rock, and desert vegetation. The wash channel width varies and has a tributary wash converging at the west side of the project contributing a 232 cfs to the Silvercroft Wash's 1,862 cfs during the 100-year event. In this submittal, the proposed trail along the west and south banks is now relocated outside of the 100-year floodplain limits, and there are no utility grading or drainage improvement structures proposed in the ERZ floodplain area. Engineering recommends approval of the Starr Pass Vistas Village 1 ERZ Overlay.

HDZ OVERLAY SUMMARY: Engineering recommends approval of the Starr Pass Vistas Village 1 HDZ Overlay.

DRAINAGE COMMENTS:
1) DS Sec.10-02.2.3.1.9: Add page numbers or tabs or some other clarification to find appendix items in Drainage report. Specifically, provide reference page for the following comments:
a) Provide street capacity analysis at a northeast street section using 42cfs entering basin.
b) Update threshold retention calculations.
2) DS Sec.2-03.2.4.L.2: Check/revise PAD elevations and proposed finished floor elevations for lots 1-6, 9, and 10 to assure lots adjacent to floodplain are elevated to meet minimum floodplain ordinance requirements to assure minimum 1-foot above adjacent WSEL.

TENTATIVE PLAT COMMENTS:
3) DS Sec.2-03.2.3.J.1: On sheet 1, clarify delineation of a floodplain line that appears to be the 404 bottom of the wash by providing as legend symbol. If there is 404 wash, the legend shall reflect this delineation.
4) DS Sec.11-01: Address the following conceptual grading design questions:
a) DS Sec.2-03.2.4.L.2: Revise PAD elevations and proposed finished floor elevations for lots 1-6, 9, and 10 per the WSEL's shown or as determined by drainage report, to assure lots adjacent to floodplain are elevated to meet minimum floodplain ordinance requirements to assure minimum 1-foot above adjacent WSEL.
b) DS Sec.2-03.2.4.M, 2-03.2.4.K: Project design should reflect geotechnical report recommendations. The typical lot grading detail shall reflect recommendations from geotechnical report for minimum sideyard setbacks for positive drainage from structure. Feasibility for project must be shown at Tentative Plat stage. Lots indicate side yard setbacks that do not comply with typical building setbacks nor geotechnical report. Revise lot sizes or show that lot grading is feasible with a typical lot detail. Clarify typical lot grading details on sheet 4, show lot grading information / clarification:
i) The minimum side and rear setbacks, building setbacks to swales shall reflect recommendations per geotechnical report. The report states the same as building codes, at 10-ft. Side yard drainage section must be acceptable to geotechnical engineer.
ii) Note 21 acknowledged. For feasibility concerns, show any A/C unit / utility pads if located along the side yards. The sideyard setback must be recommended/referenced in the Geotechnical Report.

LANDSCAPE PLAN COMMENT:
5) DS Sec.3-01.5.1.A.1: Revise sheet 4 of Landscape plans to clarify width of basin access ramp. Minimum ramp width is 15-ft.

The next submittal should address all the above items. Submit revised Tentative Plat, a bound copy of the geotechnical report, revised Drainage Report, title report, and response letter. If you have any questions before resubmittal, please call me at 837-4934.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services
08/13/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

August 13, 2007

Mirela Hromatka
Rick Engineering Company, Inc.
1745 East River Road, Suite 101
Tucson, Arizona 85718

Subject: S06-185 Starr Pass Vista Village I Tentative Plat

Dear Mirela:

Your submittal of June 19, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

3 Copies Revised Tentative Plat (Zoning, Engineering, DSD)

3 Copies Revised Landscape Plan (Zoning, Engineering, DSD)

2 Copies Bound Geotechnical Report (Engineering, DSD)

2 Copies Revised Drainage Report (Engineering, DSD)

2 Copies Title Report (Engineering, DSD)


Should you have any questions, please call me at 837-4919.

PRIOR TO RESUBMITTAL OF THESE PLANS, A WRITTEN REQUEST FOR A REVIEW EXTENSION MUST BE SUBMITTED TO AND APPROVED BY THE CDRC OFFICE.

Sincerely,

Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/