Plan Number: S06-182
Parcel: Unknown

Address:
56 E CONGRESS ST

Review Status: Completed

Review Details: REVISION - TENTATIVE PLAT REVIEW

Plan Number - S06-182
Review Name: REVISION - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/13/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
04/19/2007 MATT FLICK ENGINEERING REVIEW Approv-Cond Former Parking Space #31: Needs to be delineated from the Limited Common Element that surrounds it.

Also, the parking spaces remain numbered up to 64 even though it is said there are only 63. It would be much clearer if the spaces were renumbered to reflect the actual number of parking spaces.
04/19/2007 JIM EGAN COT NON-DSD FIRE Approved
04/19/2007 KAROL ARAGONEZ ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: S06-182
The Post
Tentative Plat

TRANSMITTAL DATE: April 19, 2007

DUE DATE: May 9, 2007

COMMENTS:

The Zoning Review Section verifies that the tentative plat meets the requirements of the Land Use Code. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the corrected tentative plat to verify that those changes do not affect any zoning requirements.



If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 74960.

KAA S:\zoning review\karol\planning\cdrc\tentativeplat\S06-182tpr1.doc
04/20/2007 FRODRIG2 PIMA COUNTY WASTEWATER Approved April 20, 2007

TO: Peggy Rau
The WLB Group

THRU: Patricia Gehlen, CDRC Manager
City of Tucson, Development Services Department

FROM: Chandubhai Patel, P.E.,Civil Eng. Manager
Development Review Division (Wastewater)
Pima County Development Services Department

SUBJECT: The Post Condominiums
Development Plan/Tentative Plat (Revised)
S06-182


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


The Pima County Department of Environmental Quality and the Wastewater Management Department hereby approve the above referenced submittal of the Development Plan/Tentative Plat as received by us on April 19, 2007.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval to Construct) may need to be obtained from the Pima County Department of Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating, or engaging in any activity which may cause or contribute to air pollution.

If you have any question regarding the above comments, please do not hesitate to contact me.

Sincerely,



Chandubhai Patel, P.E.
Telephone: (520) 740-6563

Copy: Project File
04/20/2007 PATRICIA GEHLEN LANDSCAPE REVIEW Passed
04/20/2007 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Approved DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S06-182 The Post 04/20/07

( X ) Tentative Plat
( X ) Development Plan
( X ) Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: C9-06-25

NEIGHBORHOOD PLAN: El Centro Redevelopment Plan

GATEWAY/SCENIC ROUTE:

COMMENTS DUE BY: May 9, 2007

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
( X ) Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
( ) See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:
( X ) No Resubmittal Required:
( ) Tentative Plat
( ) Development Plan
( ) Landscape Plan
( ) Other

REVIEWER: JBeall 791-4505 DATE: 04/20/07
04/20/2007 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S06-182 THE POST/REVISED TENTATIVE PLAT
DATE: APRIL 20, 2007



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.





***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through Pima
County Addressing. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***




JG
04/25/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

April 25, 2007

David Little
The WLB Group, Inc
4444 East Broadway Blvd.
Tucson, Arizona 85711

Subject: S06-182 The Post Revised Development Plan/Tentative Plat

Dear David:

The above referenced development plan/tentative plat has been CONDITIONALLY APPROVED by the Community Design Review Committee. Once the necessary corrections are made per the on-line comments, please submit the following documents for sign-off.

1 Double Matte right-reading Océ or Photo Mylar of the COMPLETE SET of the Development Plan/Tentative Plat, Landscape Plan, and the Native Plant Preservation Plan (if part of the original submittal).
AND
1 Double Matte right-reading Océ or Photo Mylar of the Development Plan/Tentative Plat.

The extra Double Matte right-reading Océ or Photo Mylar that you submit will be delivered to Pima County for permanent recording. Additional blackline copies will be made from the complete mylar set and distributed to various review agencies for their files. These copies will be ordered from the City's contracted print company and billed to you unless you already have an account at another printing company. Please let us know which printing company you would prefer to use and list them on your attached transmittal form when submitting your mylars to the CDRC office for sign-off approval. Your printing company will deliver the mylar and two (2) blackline copies to your office. If you are out of town you will need to contact the printing company for pick up or mailing arrangement options.

Please note that the final plat must be approved by Mayor and Council and recorded within one year of date of approval of the tentative plat per LUC 4.1.7.3.

Should you have any questions, please call me at 791-5608 extension 1179.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/
Via fax: 881-7492
04/25/2007 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved 4350 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702


WR#167787 April 25, 2007

The WLB Group
Attn: Melisa Snedegar
444 E Broadway
Tucson, Arizona 85711

Dear Ms. Snedegar :

SUBJECT: The Post - Resubmittal
S06-182

Tucson Electric Power Company has reviewed and approved the development plan submitted April 13, 2007. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. TEP will need a full set of approved site, electrical load, paving off-site improvements and irrigation plans.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.

In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to:

Tucson Electric Power Company
Attn: Ms. Mary Boice
New Business Project Manager
P. O. Box 711 (DB-101)
Tucson, AZ 85702
520-917-8732

Please call the area Designer Mike Kaiser at (520) 918-8244, should you have any questions.

Sincerely,


Elizabeth Miranda
Office Support Specialist
Design/Build
lm
Enclosures
cc: P. Gehlen and F. Rodriguez, City of Tucson (email)
M. Kaiser, Tucson Electric Power