Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT REVIEW
Plan Number - S06-182
Review Name: FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/10/2007 | KAY MARKS | PIMA COUNTY | ADDRESSING | Denied | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S06-182 THE POST/FINAL PLAT DATE: 1/10/07 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval: Correct Unit 045 to 405 on Sheet 7. es |
01/11/2007 | FRODRIG2 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Passed | |
01/11/2007 | FRODRIG2 | COT NON-DSD | REAL ESTATE | Approved | S06-182 The Post: Final Plat Review - No comment. |
01/16/2007 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Denied | January 12, 2007 TO: David Little, P.E. The WLB Group. THRU: Patricia Gehlen, CDRC Manager City of Tucson, Development Services Department FROM: Chandubhai C. Patel, P.E. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: The Post Condominiums, Commercial Units 101 Thru 106, Residential Units 201 Thru 213, 301 Thru 312, 401 Thru 411, 501 Thru 509, 601 Thru 607, Common Elements A and B, Residential Limited Common Element and Commercial Limited Common Element Final Plat-1st Submittal, SO6-182 The drawings for the proposed Final Plat for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. Paragraph SHEET 1. DEDICATION. In the second paragraph, 7th line, after the word SUBDIVISION, add the following: AND ARE GRANTED AS EASEMENTS TO THE CITY OF TUCSON, PIMA COUNTY AND ALL UTILITY COMPANIES FOR THE INSTALLATION AND MAINTENANCE OF UNDERGROUND AND ABOVE GROUND UTILITIES AND PUBLIC SEWERS. SHEET 1. DEDICATION. In the third paragraph, 5th line, after the word ELEMENTS, add AND PRIVATE SEWERS. SHEET 1. DEDICATION. Second paragraph, 7th line: What you have written after the word SUBDIVISION does not make sense. May be some word or words are missing. Please edit and correct as necessary. 4. The next submittal of this project will be the 2nd submittal. A check for the review fee of this submittal in the amount of $50.00 made out to PIMA COUNTY TREASURER must accompany the revised set of bluelines and the response letter. For any questions regarding the fee schedule, please go to http://www.pimaxpress.com/SubDivision/Documents/Fees.PDF where you may find the appropriate wastewater review fees at the bottom of page 1. If the number of sheets changes, please adjust the review fee accordingly. If you have any questions regarding the above comments, please do not hesitate to contact me. Sincerely, Chandubhai C. Patel, P.E. Telephone: (520) 740-6563 Copy: Project File |
01/18/2007 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES January 18, 2007 David Little The WLB Group 4444 East Broadway Blvd. Tucson, Arizona 85711 Subject: S06-182 The Post Final Plat Dear David: Your submittal of December 19, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 6 Copies Revised Final Plat (Zoning, Engineering, Addressing, Wastewater, Assessor DSD) 2 Copies LUC Affidavit (Zoning, DSD) 2 Copies CC&R's (Zoning, DSD) Should you have any questions, please call me at 791-5608 extension 1179. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 881-7492 fpresubmittal |
01/18/2007 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Denied | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Gary Ault, Mapping Supervisor Pima County Assessor's Office Mapping Department DATE: January 17, 2007 RE: Assessor's Review and Comments Regarding Final Plat S06-182 THE POST T141312 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Plat meets Assessor's Office requirements. ___X___ Plat does not meet Assessor's Office requirements. COMMENTS: PLEASE MAKE THE FOLLOWING ADJUSTMENTS BEFORE RECORDING: 1. ADD SQUARE FOOTAGE FOR ALL UNITS AND COMMON ELEMENTS. 2. ADD BEARINGS AND DIMS FOR ALL LOT LINES' THANK YOU FOR YOUR SUBMITTAL. IF YOU HAVE ANY QUESTIONS PLEASE CALL ROSANNA WERNER AT 740-4390 NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. ROSANNA WERNER |
12/19/2006 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
12/20/2006 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: THE POST S06-182 Tucson Electric Power Company (TEP) has reviewed and approved the final plat submitted December 19, 2006. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Ms. Mary Boice New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8732 Please call the area Designer Mike Kaiser at (520) 918-8244, should you have any questions. Liza Castillo, Right of Way Agent Land Management Tucson Electric Power Co. Unisource Energy Gas & Unisource Energy Electric PH: (520) 917-8745 lcastillo@tep.com <mailto:lcastillo@tep.com> |
12/28/2006 | KAROL ARAGONEZ | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Karol Aragonez Planner PROJECT: S06-182 The Post Final Plat TRANSMITTAL DATE: December 28, 2006 DUE DATE: January 17, 2007 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. An applicant has one (1) year from the date of approval of tentative plat to obtain approval of a final plat that complies with zoning and other development requirements in effect at the time of application. As of this final plat review date the tentative plat has not been approved therefore the one year date of the final plat approval is based on the date of submittal of the final plat documents, December 18, 2007. Once the tentative plat has been approved the approval date of the final plat will be on one year from the tentative plat approval date. This date will be provided on a future review of the final plat. 2. Please add note which reads "This plat is subject to the conditions of rezoning case number C9-06-25, unless superceded by a subsequent rezoning ordinance". Also place the case number in the lower right corner of all sheets of the final plat DS 2-03.6.2.D & DS 2-03.6.1.K 3. Please add the MDR case number in the lower right corner of all sheets of the final plat and add the following note "This plat is subject to Modifications of Development Regulations (MDR) of the Rio Nuevo and Downtown Zone (RND) case number MDR-06-01. 4. Please revise the Certification of Survey to read verbatim to DS 2-03.6.3.A. 5. Please revise the hold harmless statement to read verbatim to DS 2-03.6.3.B.3. 6. Please add to the end of the Recording Data block "Witness my hand and official seal, the day and year above as written". DS 2-03.6.3.D 7. Please add the Assurances block as written in DS 2-03.6.3.E. 8. Please correct the unit description matrix headings on sheet 9 of 10. 9. Article 3.01.b indicates that the declarant reserves the right to create a maximum of seventy-five (75) units within the condominium. Even though the Development Designator "X" does not have a maximum density, the number of units that can be developed is limited by the number of motor vehicle parking spaces that can be legally accommodated on the site per the RND zone. All future expansions will require CDRC review and approval. 10. Any subdivider who files a final plat for a condominium, cooperative, community apartment, townhouse, or mobile home park subdivision, whether for the purpose of new development or the subdivision of an existing development, shall submit a copy of a report on the physical condition of all buildings, structures, and other improvements to the property to be subdivided prior to approval of a final plat by the Mayor and Council. The subdivider shall provide this report to all prospective purchasers of units prior to execution of a binding contract of purchase. The report shall contain the following. Please submit a copy of a report on the physical condition of all buildings, structures, and other improvements to the property to be subdivided prior to approval of a final plat by the Mayor and Council. The subdivider shall provide this report to all prospective purchasers of units prior to execution of a binding contract of purchase. The report shall contain the following. a. A statement of the estimated fees or assessments, if any, that the purchaser of a unit will pay, on a monthly and yearly basis, for at least a two (2) year period following purchase. b. A report from a licensed pest control operator on each building or structure and each unit within the building or structure. c. A statement of the unit's average monthly utility costs based on the preceding twelve (12) month period, where the subdivider has access to such utility cost data. d. A report describing, to the best knowledge or estimate of the subdivider, the physical condition of elements of the structure, equipment, or appliances in a unit, the repair or replacement of which will be the responsibility of the purchaser. The report shall state the approximate date on which the element, equipment, or appliance was originally constructed or installed; the approximate date on which it was subsequently replaced or will likely require replacement; and the current estimated cost of replacement. This report shall not be construed to create any warranties, express or implied. e. A report containing information to be obtained from the City Fire Department describing the extent to which the buildings and structures to be converted by the plat submitted by the subdivider deviate from applicable requirements of the Building Code, Tucson Code, Chapter 6, and the Fire Prevention Code, Tucson Code, Chapter 13, in the following specified areas of fire safety. 1. Accessibility of buildings and structures to fire-fighting equipment; and 2. Proximity and frequency of fire hydrants. LUC 4.1.9.2 If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 1197. KAA S:\zoning review\karol\planning\cdrc\finalplat\S06-182fp.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat, CC&R's and additional requested documents. |
12/29/2006 | MATT FLICK | ENGINEERING | REVIEW | Denied | DSD Engineering Comments for 1st Submittal of The Post Condominium Final Plat 1. Revise the hold-harmless statement to read as stated in Dev. Std. 2-03.6.3.B.3. 2. Add the assurance block as given in Dev. Std. 2-03.6.3.E substituting "City of Tucson Development Services Department Engineering Administrator" for "City of Tucson Engineer". |