Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT REVIEW
Plan Number - S06-169
Review Name: FINAL PLAT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/01/2006 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 08/04/2006 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Denied | SUBJECT: SPEEDTANO CORP. CTR. CONDOMINIUMS S06-169 Tucson Electric Power Company (TEP) has reviewed the final plat submitted August 1, 2006. TEP is unable to approve the plat at this time. In order for this Company to approve the final plat, the following dedication is required. "An easement is granted for the purpose of access, installation replacing repairing and maintenance of electrical meters, cable and conduits, which grouped electrical meters are attached to the exterior walls." Show the required dedication on the resubmittal of the final plat. Submit two bluelines to the City of Tucson for TEP's final approval. Please contact me at (520) 917-8745 if you have any questions. Liza Castillo Right of Way Agent Land Management Tucson Electric Power Co. (520) 917-8745 lcastillo@tep.com |
| 08/22/2006 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Gary Ault, Mapping Supervisor Pima County Assessor's Office Mapping Department DATE: August 21, 2006 RE: Assessor's Review and Comments Regarding Final Plat S06-169 Speedtano Corporate Center Condominium T141508 (133-23) * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor's Office requirements. _______ Plat does not meet Assessor's Office requirements. COMMENTS: THANK YOU FOR YOUR SUBMITTAL. NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
| 08/28/2006 | KAY MARKS | PIMA COUNTY | ADDRESSING | Denied | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S06-169 SPEEDTANO CORP CTR CONDOMINIUM/FINAL PLAT DATE: AUGUST 28, 2006 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval: Include Section Numbers on Location Map. Spell out all street suffixes except on Location Map. Correct the building addresses on all applicable pages. Correct the units on building 2 pg. 1. jg |
| 08/30/2006 | FRODRIG2 | COT NON-DSD | REAL ESTATE | Denied | S06-169 Speedtano Corp. Ctr. Condominium: Final Plat Review - No title report received. |
| 09/05/2006 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: Patricia Gehlen DATE: September 5, 2006 CDRC/Zoning Manager SUBJECT: Speedtano Corporate Center Condominium 7350 E. Spedway Blvd. Final Plat S06-169 (First Review) T14S, R15E, Section 08 RESUBMITTAL REQUIRED: Final Plat. The Final Plat (FP) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Final Plat: 1. Please provide North arrow and scale on the first sheet per D.S. 2-02.2.1. 2. Please include a response letter to the comments along with the corrected copies of the FP. 3. Submit the Subdivision Improvement Assurances for review. The following items are required in the assurance package if a Third Party Trust Agreement will be used: · Title Report · Special Warranty Deed · Trust Agreement · Amendment to Trust · Agreement to Construct Submit the above documents containing original signatures, copies of the documents and signatures will not be forwarded to the City of Tucson attorney for review. 4. The title block of the plat must match the Subdivision Assurances verbatim. 5. The sheet shall have a 2" margin on the left and ½" on the remaining sides per D.S. 2-03.6.1.B. 6. Please re-label all common areas that may be used in a dual and/or single use capacity per D.S. 2-03.6.4.C. For example, a Ret./Det. Basin may also be used as a recreation facility or only as a drainage facility or drainage pipe and this must be reflected on the Final Plat. A key note explaining the labels could be used in conjunction with the labels, ie.: Common Element "A" - Streets Common Element "B" - Drainage/Recreation Facilities Common Element "C" - Recreation Facilities Common Element "D" - Drainage Facilities Common Element "E" - Landscaping 7. Show sight visibility triangles per D.S. 2-02.2.1.10. 8. Complete the case no. S06-169. 9. All verbiage shall reference common elements through out the plat instead of common areas. 10. A CCR's or a maintenance agreement for the drainage pipe shall be included on the plat with the re-submittal 11. Show total cross-sections for each building for volume calculations. 12. Show a 1' no access esmt. along the east portion of the property line. 13. Please submit a copy of the subdivision boundary closure calculations. If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov Paul P. Machado Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 791-5550 x1193 office (520) 879-8010 fax 7350 E. Spedway Blvd. |
| 09/11/2006 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: SPEEDTANO CORP. CENTER CONDOMINUM S06-169 Final Plat TRANSMITTAL DATE: September 07, 2006 DUE DATE: August 29, 2006 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. An applicant has one (1) year from the date of submittal to obtain approval of a final plat that complies with zoning and other development requirements in effect at the time of application. This final plat must be approved and recorded on or before August 28, 2007. 2. Each sheet will measure 24'x36" and include a two (2) inch margin on the left side and one-half (1/2) inch margins on the remaining sides. D.S. 2-03.6.1.B. 3. All lettering and dimensions will be the equivalent of twelve (0.12) point or greater in size. D.S. 2-03.6.1.C. 4. A small project map will be provided with the subject property approximately centered within the one (1) square mile area & the section corners labeled. D.S. 2-03.6.1.D.1 & 3. 5. Complete the subdivision case number S06-169 in the lower right hand corner. D.S. 2-03.6.1.K 6. Permiting note #1 is incorrect, the zoning is O-3. 7. The plat calls out "COMMON AREAS", the CC&R's definitions do not address "COMMON AREAS". The CC&R's definitions do define "COMMON ELEMENTS", either revise the plan so that it reflects the information provided in the CC&Rs or revise the CC&Rs to reflect the plan. Declaration: 8. The title should reflect "SPEEDTANO CORPORATE CENTER CONDOMINIUM" 9. Article 4.3 MAXIMUM MEDICAL SQUARE FOOTAGE, should reflect the square footage specified on the approved development plan parking calculations, 9,035 sq. ft. 10. Article 4.4 SETBACKS: The set backs for the buildings on this development shall be governed by the City of Tucson Land Use Code not the Declaration or the plat. Please remove all references to building setbacks. If you have any questions about this transmittal, please call Steve Shields, (520) 791-5608 ext. 1180 C\planning\cdrc\finaplat\S06-169fp.doc. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat, CC&R's and additional requested documents. |
| 09/13/2006 | FRODRIG2 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Passed | |
| 09/14/2006 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approv-Cond | September 14, 2006 TO: T. Wayne Ashby Ashby Surveying & Drefting THRU: Patricia Gehlen City of Tucson, Development Services Department FROM: Chandubhai C. Patel, P.E. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: Speedtano Corporate Center Condominiums, Units 1-17 & Common Areas A&B Final Plat – 1st Submittal S06-169 The drawings for the Final Plat of the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. All Sheets. Show the project number S06-169 with large and bold letters. 2. Add the following notes in the GENERAL NOTES: THE LANDSCAPING WITHIN ALL PUBLIC SEWER EASEMENTS SHOWN HEREON SHALL BE IN ACCORDANCE WITH THE PLANTING GUIDELINES OF PC/COT STANDARD DETAIL WWM A-4 NO PERMITS FOR PERMANENT STRUCTURES (I.E., MASONRY WALLS, FENCES, ETC.) ON OR THROUGH THE PUBLIC SEWER EASEMENT WILL BE ISSUED WITHOUT SEPARATE WRITTEN AUTHORIZATION FROM THE PCWMD. Dedication Block: In the first line of the second paragraph, following the word TUCSON, add: ,PIMA COUNTY AND PIMA COUNTY FLOOD CONTROL DISTRICT, 3. Dedication Block: In the third line of the third paragraph, following the word to, add: CITY OF TUCSON, Subject to satisfactorily addressing the above comments, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat as received by us on August 1, 2006. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer lines or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Department of Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality prior to constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any comments regarding the above comments, please do not hesitate to call me. Sincerely, Chandubhai C. Patel, P.E. Telephone: (520) 740-6563 Copy: Project File |
| 09/19/2006 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES September 19, 2006 Ashby Surveying & Drafting, Inc. 717 North Swan Road Tucson, Arizona 85711 Subject: S06-169 Speedtano Corporate Center Condominiums Final Plat Dear Sir: Your submittal of August 1, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 6 Copies Revised Final Plat (TEP, Addressing, Real Estate, Engineering, Zoning, DSD) 2 Copies Title Report (Real Estate, DSD) 3 Copies CC&R's (Zoning, Engineering, DSD file copy) Should you have any questions, please call me at 791-5608 extension 1179. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 325-2074 fpresubmittal |