Plan Number: S06-168
Parcel: Unknown

Address:
4427 E LEE ST

Review Status: Completed

Review Details: TENTATIVE PLAT REVIEW

Plan Number - S06-168
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/03/2006 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
08/04/2006 JIM EGAN COT NON-DSD FIRE Denied 1. The distance between the overhangs on buildings 9 and 10 appear to require fire protection.
2. The carports for buildings 9 and 10 need a common firewall at the property line.
3. All portions of buildings 4, 9 and 10 and parts of buildings 3 and 5 are over 300 feet from a fire hydrant. Provide a hydrant per IFC Section 508.1 as amended.
08/08/2006 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved NO COMMENT
S06-168
GREGOR ENGINEERING
LEE STREET APARTMENTS

--------------------------------------------------------


Confidentiality and Nondisclosure Notice: This email transmission and any attachments are intended for use by the person(s)/entity(ies) named above and may contain confidential/privileged information. Any unauthorized use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, please contact the sender by e-mail, and delete or destroy all copies plus attachments.
08/10/2006 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: LEE STREET APARTMENTS

S06-168



Tucson Electric Power Company (TEP) has no objection to the tentative
plat submitted for review August 3, 2006.



There are existing electrical facilities within the boundaries of this
project that serve the existing buildings. The easement that is shown
as keynote 17, should be shown as Docket-1981 at Page-290.


Liza Castillo
Right of Way Agent
Land Management
Tucson Electric Power Co.
(520) 917-8745
lcastillo@tep.com
08/17/2006 SUZANNE BOHNET ENGINEERING REVIEW Denied DATE: August 17, 2006

To: Patricia Gehlen
CDRC/Zoning Manager
FROM: Suzanne Bohnet, CFM
Engineering Division

SUBJECT: Lee Street Apartments
Tentative Plat S06-168 (First Review)
T14S, R14E, Section 03

RESUBMITTAL REQUIRED: Tentative Plat

The Engineering Division has reviewed the Tentative Plat and we do not recommend approval at this time. The following review comments must be addressed.

Tentative Plat Comments:
1. General Note No. 11 is not correct. The site is completely located in a Zone X (Shaded), which is defined by the Federal Emergency Management Agency (FEMA) as an area subject to either shallow 100-year sheet flooding (less than 1 foot) or a 500-year floodplain or an area protected by a levee. The definition that applies for this site is shallow (less than 1 foot) 100-year sheet flooding. Therefore, all lots are affected by the City of Tucson Floodplain Regulations. (DS 2-03.2.2.C.2.a) and all lots will need a Floodplain Use Permit for any future development. Please correct General Note No. 11 to reflect this.
2. Also, General Note No. 11 states the western 20 feet of Lot 7 lie in a FEMA Zone AE. Zone AE is contained within the Catalina Ave. right-of-way, except for a small portion of the northwest corner of Lot 7. Please correct General Note No. 11 to reflect this.
3. It appears the water surface elevations given in the table on Sheet 2 are in the National Geodetic Vertical Datum (NGVD '29). The Basis of Elevation on Sheet 1 is given as the North American Vertical Datum (NAVD '88). Please either convert the water surface elevations to the NAVD '88 or note that these elevations are in NGVD '29.
4. Please add the drainage flow arrows symbol to the legend.
5. Please provide spot elevations at the locations where the drainage arrows point in opposite directions to support the indicated flow of drainage.
6. Per the Standards Manual for Drainage Design and Floodplain Management in Tucson AZ (SMDDFM) 2.3.1.4.C, please add the following to the Tentative Plat:
6.1. The 100-year floodplain limits and areas of sheet flooding, including spot water-surface elevations. The floodplain limits need to be shown in a surveyable format on the final plat.
6.2. Label the Regulatory Floodplain as a "Regulatory Floodplain".
6.3. Label the floodplain in one of the following ways:
6.3.1. To be left natural
6.3.2. To be channelized
6.3.3. Public or Private Flowage Easement
6.3.4. Public or Private Drainage Easement
6.3.5. Public or Private Right-of-Way
7. Please provide the sight visibility triangles (SVT) for the three driveways off Lee St. and for the corner intersection of Lee St. and Catalina Ave.
8. Keynote No. 15 (Sheet 2) calls out a 20-foot ingress/egress easement. However on Lot 9 the easement is only 10 feet wide. Also, Keynote No. 16, that calls out a 10-foot ingress/egress easement, is not called out on the Tentative Plat. Verify the width of the ingress/egress easement on Lot 9 and make the appropriate changes.
9. Keynote No. 1 is not called out on the Tentative Plat.
10. Please explain how the refuse is being picked up now. Please show proposed pick-up locations to support General Note No. 10.

Submit a revised Tentative Plat with a detailed response letter detailing how each comment has been addressed.
If you have any questions, I can be reached at 791-5550 x1188 or suzanne.bohnet@tucsonaz.gov.

Suzanne Bohnet, CFM
Engineering Associate
08/21/2006 JOSE ORTIZ COT NON-DSD TRAFFIC Approv-Cond August 21, 2006
ACTIVITY NUMBER: S06-168
PROJECT NAME: Lee Street Apartments
PROJECT ADDRESS: 4427 E Lee Street
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering recommends a conditional approval of the Tentative Plat. Due to the fact that the site is existing and no improvements are proposed. Traffic Engineering has reviewed this site similar to the way a condo conversion would be reviewed therefore no additional improvements are required at this time. For any reason the developer chooses to revise this site then a revised Tentative Plat is required for re-submittal for review with Traffic Engineering.


If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov
08/22/2006 JOE LINVILLE LANDSCAPE REVIEW Approved
08/22/2006 FRODRIG2 OTHER AGENCIES PIMA ASSN OF GOVTS Approved Transportation Information for
Rezoning, Subdivision, and
Development Requests
Delivered to:
Date Delivered:
Development Services - City of Tucson
8/22/2006
Case Number Project Name
Average number of daily trips
(ADT) forecasted as a result of the
proposed development
This information is provided for jurisdictional
planning departments to assess the impact of
the proposed residential or commercial
development on surrounding traffic patterns
and roads. If the forecasted daily traffic
exceeds 500 average daily trips, a more
detailed analysis is also provided.
S06-168 Lee Street Apartments 323
Pima Association of Governments
Sandra C. Holland, Data Services
177 N. Church Ave., Suite 405, Tucson, Arizona
85701-1127
(520) 792-1093 FAX (520) 620-6981
08/24/2006 JCLARK3 ENV SVCS REVIEW Approved * No known landfill within 1000 feet of this development.
* Project is existing apartment complex that is serviced by 6-300's APC's.
* NOTE: Existing review proceedures do not require the developer to upgrade the existing coditions to todays standards. Recommend that the complex place enclosures for metal dumpsters in the project.
08/25/2006 ED ABRIGO PIMA COUNTY ASSESSOR Approv-Cond Office of the Pima County Assessor


115 N. Church Ave.


Tucson, Arizona 85701



BILL STAPLES

ASSESSOR










TO: CDRC Office

Subdivision Review

City of Tucson (FAX# 791-5559



FROM: Gary Ault, Mapping Supervisor

Pima County Assessor's Office

Mapping Department



DATE: August 23, 2006





RE: Assessor's Review and Comments Regarding Tentative Plat




S06-168 LEE STREET APARTMENTS T141403

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *



X Plat meets Assessor's Office requirements.

_______ Plat does not meet Assessor's Office requirements.





COMMENTS: PLEASE MAKE THE FOLLOWING ADJUSTMENTS BEFORE FINAL PLAT
STAGE:



1. ADD BEARINGS FOR ALL PARCEL LINES.

2. SHOW SECTION TIE WITH DIMS AND BEARINGS

THANK YOU FOR YOUR SUBMITTA. IF YOU HAVE ANY QUESTIONS PLEASE CALL
ROSANNA WERNER AT 740-4390.



NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS
TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN
THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING
THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK
YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
08/30/2006 FRODRIG2 COT NON-DSD REAL ESTATE Denied S06-168 Lee Street Apartments: Tentative Plat Review - Request the following items:
1. Diagonal parking appears to back into Lee St. Defer comments to Traffic Engineering review.
2. Confirm that a "cross-easement" type of agreement exists along the E. area of the parcel to accommodate in/egress of single family residences to the E.
3. Keynotes 15 & 16; Easement corridors accurately annotated to show locations stated in Dt./Pg. 2045/535 & 2028/314.
09/05/2006 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S06-168 LEE STREET APARTMENTS/TENTATIVE PLAT
DATE: 9/05/06



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

1.) Delete 9/67 and 58/62 from Location Map.

2.) Please call me at 740-6480 to schedule a meeting for discussion of Addresses and Unit Numbers prior to further review.






es
09/07/2006 GLENN HICKS COT NON-DSD PARKS & RECREATION Approved DATE: September 07, 2006

TO: Ferne Rodriguez, Development Services

FROM: Glenn Hicks
Parks and Recreation
791-4873 ext. 215
Glenn.Hicks@tucsonaz.gov

CC:


SUBJECT: S06-168 Lee Street Apartments: Tentative Plat Review


Staff has no comments.
09/07/2006 FRODRIG2 PIMA COUNTY WASTEWATER Denied September 7, 2006

To: Steven Gregor, P.E.
Gregor Engineering, Inc.

Thru: Patricia Gehlen, CDRC Project Manager
City of Tucson Development Services Department

____________________________________
From: Michael J.Harrington (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: Lee Street Apartments
Lots 1-10
Tentative Plat - 1st Submittal
S06-168

The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


This project will be tributary to the Roger Road Wastewater Treatment Facility via the South Rillito - West (South Line) Interceptor. The on-site sewers are existing and private. No new sewers are proposed. The requirement that a Capacity Response letter be obtained from PCWMD Development Services Section is therefore waived.

All Sheets: Add the subdivision case number, S06-168, to the title block of each sheet. This number should be shown larger or bolder than any cross reference numbers. No wastewater review fees will be charged for sheets where this is the only required revision.

Sheet 1: Add a General Note that states:

A PROPERTY OWNERS’ ASSOCIATION WILL BE FORMED TO ACCEPT RESPONSIBILITY AND LIABILITY FOR MAINTENANCE, OPERATION AND CONTROL OF ALL SHARED PRIVATE SEWERS.

Sheet 1: Revise the Legend block so that it shows:

An example of the EXISTING SANITARY SEWER MANHOLE.

Sheet 2: Revise the site plan so that:

PRIVATE SEWER EASEMENTS are provided to contain any shared private sewers.

Sheet 2: The IMS numbers used to identify the public sewer cleanouts in the Lee Street rights of way are labeled incorrectly. Revise the labels for these two public sewer elements so that:

The hyphen mark (-) is replaced with the asterisk mark (*) that is used in the IMS system to designate a cleanout feature.

Sheet 2: Revise the site plan so that:

The non-existent 6” sewer line is deleted from the drawing East of EXIST. CO #8549*06.

This office will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents.

Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the tentative plat. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet.

The next submittal of this project will be the second (2nd) submittal. A check for the review fee of this submittal in the amount of $100.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of bluelines and response letter.

If the number of sheets changes, please adjust the review fee accordingly.


If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter

CC: Project File
09/13/2006 FRODRIG2 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed
09/15/2006 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Approved DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S06-168 Lee Street Apartments 09/14/06

(X) Tentative Plat
() Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE:

NEIGHBORHOOD PLAN: Grant-Alvernon Area Plan

GATEWAY/SCENIC ROUTE: NO

COMMENTS DUE BY: August 31, 2006

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

(X) No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
() See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:







REVIEWER: msp 791-4505 DATE: September 12, 2006
09/18/2006 TERRY STEVENS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: S06-168
Lee Street Apartments
Tentative Plat

TRANSMITTAL: 09/18/06

DUE DATE: 8/31/06

COMMENTS:

NOTICE: ADDITONAL COPIES OF THE TENTATIVE PLAT WILL BE REQUIRED TO BE SUBMITTED FOR THE SECOND REVIEW. BUILDING, ELECTRICAL, AND MECHCANICAL/PLUMBING SECTIONS OF DSD WILL BE REQUIRED TO REVIEW THIS PLAT BECAUSE OF UTILITY EASEMENT AND POSSIBLE FIRE SEPARATION ISSUES.

1. Section 4.1.7.1, LUC, permits a maximum of one year from the date of application to obtain approval of a tentative plat. If, at the end of that time, the tentative plat has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this tentative plat is 8/30/07.

2. DS 2-03.2.2.B.1 This project has been assigned the subdivision case number S06-168. Please list the case number in the lower right corner of all tentative plat sheets including the NPPO and landscape sheets.

3. DS 2-03.2.4.A Clearly indicate the distance from all structures to new or relocated property lines.

The minimum setback requirements are 10' or ¾ the height of the structure from property lines.

The east property line of lot 7 has been relocated 2' to the west. Provide a dimension from the property line to the existing covered parking structures. If the carports do not meet the above setback requirements a setback waiver can be provided for the detached accessory structures or can be included in the DDO (See following comment).

The distances for setbacks on lots 9 (east setback) and 10 (west setback) does not meet the above setback requirements. A DDO (Design Development Option) will be required to be applied for and approved before approval of the tentative plat. If a DDO is obtained and approved, place the case number near the lower right corner of each sheet and add a note indicating the date of approval and any conditions of the DDO.

The swimming pool located at lots 6, 5 and 8 is considered a structure. A structure is not allowed to be located across property lines. Relocate the property lines or remove the swimming pool.

4. DS 2-03.2.4.B The square footage indicated for each lot does not appear to match the indicated lot dimensions. Revise on the plat and in the lot coverage and density calculations. (Required because of the density calculations being so close to maximum allowed.)

5. DS 2-03.2.4.J All proposed easements (utility, sewer, drainage, access, etc.) are to be
dimensioned and labeled as to their purposes and whether they will be public or
private.

Provide a separate sheet clearly indicating all required easements.

Easements will be required for sewer lines, water lines, gas lines and electrical lines which cross any property lines and serve more than one parcel.

If existing easements are to be abandoned provide recordation information of abandonment.

An ingress/egress easement will be required along the east property line of lots 1 and 10 in conjunction with the neighboring properties, Provide recordation information.

6. DS 2-03.2.4.J Cross parking, cross access, and maintenance agreements are required to be provided. These can be provided through a CC&R (Conditions, Covenants and Restrictions) agreement. Provide at the next submittal.

7. Based on changes to the plans and responses to the comments additional comments may be forth coming.

If you have any questions about this transmittal, please call Terry Stevens, (520) 791-5550 ext. 2000.


TLS C:\planning\cdrc\tentativeplat\S06-168tp.doc
09/19/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

September 19, 2006

Steve Gregor
Gregor Engineering, Inc.
5232 East Pima Street, Suite A
Tucson, Arizona 85712

Subject: S06-168 Lee Street Apartments Tentative Plat

Dear Steve:

Your submittal of August 3, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

11 Copies Revised Final Plat (Fire, Engineering, Assessor, Real Estate, Addressing, Wastewater, Zoning, Building, Electrical, Mechcanical/Plumbing, DSD )

3 Copies Cross access and parking agreement (Zoning, Real Estate, DSD)


Should you have any questions, please call me at 791-5608 extension 1179.

Sincerely,


Patricia Gehlen
CDRC Manager