Plan Number: S06-128
Parcel: Unknown

Address:
3514 E GLENN ST

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Plan Number - S06-128
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/10/2007 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
01/18/2007 KAROL ARAGONEZ ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: S06-128
Glenn Duplexes
Tentative Plat Resubmittal

TRANSMITTAL DATE: January 18, 2007

DUE DATE: February 8, 2007

COMMENTS:

The Zoning Review Section approves the tentative plat for this subdivision, subject to the following changes on the executed tentative plat. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised tentative plat to verify that those changes do not affect any zoning requirements.

1. Remove the reference to "Site Plan" in sheet title on sheet C1.1 and replace with the sheet title "Tentative Plat".


If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550, ext. 1197.

KAA S:\zoning review\karol\planning\cdrc\tentativeplat\S06-128tprev1.doc
01/24/2007 FRODRIG2 PIMA COUNTY WASTEWATER Approved January 24, 2007

TO: Rick Bright
Bright / Kliman Architects.

THRU: Patricia Gehlen, CDRC Manager
City of Tucson, Development Services Department

FROM: Chandubhai C. Patel, P.E., Civil Engineering Manager
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: Glenn Duplexes
Tentative Plat – 3rd Submittal
S06-128

The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

The Pima County Department of Environmental Quality and the Wastewater Management Department hereby approve the above referenced submittal of the development plan as received by us on January 9, 2007.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality Department.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating, or engaging in any activity which may cause or contribute to air pollution.


If you have any questions regarding the above comments, please do not hesitate to contact me.

Sincerely,



Chandubhai C. Patel, P.E.
Telephone: (520) 740-6563

Copy: Project File
.
02/08/2007 PATRICIA GILBERT ENGINEERING REVIEW Approv-Cond TO: Patricia Gehlen; CDRC Coordinator DATE: February 8, 2007

SUBJECT: Engineering review of the Glenn Duplexes Tentative Plat. The activity number is S06-128.

SUMMARY: The Tentative Plat and Drainage Report were received by Engineering on January 10th, 2007. Engineering has reviewed the received items and recommends a conditional approval of the Tentative Plat.

CONDITIONAL APPROVAL: TENTATIVE PLAT

The next submittal must address the following items:

TENTATIVE PLAT

1. Remove the reference to "Site Plan" in sheet title on sheet C1.1 and replace with
the sheet title "Tentative Plat".
02/13/2007 FRODRIG2 COT NON-DSD REAL ESTATE Denied S06-128 Glenn Duplexes: Resubmittal - CDRC - Tentative Plat Review
- Request "Cross Access Easement" be annotated in the legend.
- R/W dedication along Glenn Ave. needs to be clarified. If area is dedicated by separate instrument, request the "Docket ______ Page ________" be completed before final plat. As a suggestion, the R/W may be dedicated by final plat and separate instrument is not needed.
- Request the proposed R/W to be dedicated have the easement (hash marks) annotations removed.
03/01/2007 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

March 1, 2007

Rick Bright
Bright/Kliman Architects
1661 North Swan Suite 128
Tucson, AZ 85712

Subject: S06-128 Glenn Duplexes Tentative Plat

Dear Rick:

Your submittal of January 10, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

2 Copies Revised Tentative Plat (Real Estate, DSD)











Should you have any questions, please call me at 791-5608 ext. 1179.

Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/
Via fax: 292-1142
03/01/2007 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved 4350 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702


WR#164026 March 1, 2007

Bright/Kilman
Attn: Jake Boen
1661 N Swan Rd, Suite 128
Tucson, Arizona 85712

Dear Mr. Boen :

SUBJECT: Glen Duplexes – Re-Review
S06-128

Tucson Electric Power Company has reviewed and approved the development plan submitted January 10, 2007. It appears that there are no conflicts with the existing facilities within the boundaries of this proposed development. TEP will need a full set of approved site, electrical load, paving off-site improvements and irrigation plans.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.

In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to:

Tucson Electric Power Company
Attn: Ms. Mary Boice
New Business Project Manager
P. O. Box 711 (DB-101)
Tucson, AZ 85702
520-917-8732

Please call the area Designer Warren McElyea at (520) 918-8268, should you have any questions.

Sincerely,


Elizabeth Miranda
Office Support Specialist
Design/Build
lm
Enclosures
cc: P. Gehlen and F. Rodriguez, City of Tucson (email)
W. McElyea, Tucson Electric Power