Plan Number: S06-097
Parcel: Unknown

Address:
3808 N 1ST AV

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S06-097
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/03/2008 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
07/11/2008 STEVE SHIELDS ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: Steve Shields
Lead Planner

PROJECT: The Lofts at Villa Sovona
S06-097
Final Plat (2nd Review)

TRANSMITTAL DATE: July 11, 2008

DUE DATE: August 01, 2008

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. The Zoning Review Section approves the final plat for this subdivision. Should there be any changes requested by other CDRC members, however, the Zoning Review Section approval is void, and we request copies of those changes to insure that those changes do not affect zoning requirements.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C\planning\cdrc\finaplat\S06-097fp-2nd.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED
07/18/2008 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: THE LOFTS AT VILLA SAVONNA

S06-097




Tucson Electric Power Company has reviewed and approved the Final Plat
submitted for review July 8, 2008.



In order to apply for electric service, call the New Construction
Department at (520) 770-2062. Submit a final set of plans including
approved site, offsite and electrical load plans. Include a CD with the
AutoCAD version of the plans. If easements are required, they will be
secured by separate instrument.



Please call me at (520) 917-8745, should you have any questions.




Liza Castillo, Right of Way Agent II
Tucson Electric Power Co.
Unisource Energy Services
offc-(520) 917-8745
fax-(520) 545-1416
lcastillo@tep.com
07/25/2008 ANDY STEUART COT NON-DSD REAL ESTATE Approved no comment
07/25/2008 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207


JENNIFER STEPHENS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: JENNIFER STEPHENS, ADDRESSING OFFICIAL
SUBJECT: S06-097 THE LOFTS AT VILLA SAVONNA/REVISED FINAL PLAT
DATE: 7/25/08



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.





***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through Pima
County Addressing. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***
07/30/2008 JASON GREEN ENGINEERING REVIEW Approved DATE: July 30, 2008
SUBJECT: The Lofts at Villa Savonna Final Plat Submittal- 2nd Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 3808 N 1st Ave, T13S R14E Sec 30 Ward 3
REVIEWERS: Jason Green, CFM
ACTIVITY: S06-097


SUMMARY: Engineering Division of Development Services Department has received, Sheet 1 and 2 of the revised Final Plat, a copy of the CC&R's and a copy of the Assurance Package. Engineering Division has reviewed the submitted Final Plat, CC&R's and Assurance Package and recommends approval of the Final Plat at this time.

" Provide a final Mylar Set to CDRC for review and approval prior to submittal to Mayor and Council.


ASSURANCE PACKAGE COMMENTS: Comments for the Assurance Package will be submitted under a separate letter.

1) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the Financial Assurances package is received and approved.

2) The complete original Assurance package, with seals and signatures must be submitted prior to Final Plat approval.

3) Before submitting the assurance paperwork, assure that the descriptions of the Common Areas of the Final Plat title block match the assurance paperwork descriptions of the Common Areas. Please be aware that the legal office may reject the assurance paperwork if the verbiage does not match exactly the verbiage on the Final Plat's Title Block.


If you have any questions I can be reached at 837-4929.




Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Development Services
08/16/2008 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

August 16, 2008

Thomas E. Guido, P.E.
T and T Engineering, LLC
6420 East Tanque Verde Road #100
Tucson, Arizona 85715

Subject: S06-097 The Lofts at Villa Savonna Final Plat

Dear Thomas:

As we discussed on the telephone earlier this week, the above listed plat may not be approved. In November 2006, the Land Use Code was revised to require a Special Exception for any proposed residential cluster project less than five (5) acres. The Lofts at Villa Savonna meets this criterion. Although the tentative plat was submitted prior to the code change (April 25, 2006), it needed to be approved prior to April 24, 2007 to avoid the need for a Special Exception. The last submittal of the tentative plat was made on May 8, 2007 which is after the last date for tentative plat approval.

Since the CDRC office did not catch the expiration date of the tentative plat and accepted the final plat, the City of Tucson will refund the final plat review fee or give you a credit on your next submittal. Please let me know how you would like to use the $1,750.33 owed for the final plat review.

In order to proceed with this plat, the applicant may submit an application for a Special Exception. To process a Special Exception, please contact Michael Wyneken with DUPD for more information. The phone number is 791-4505.


Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Gehlen
CDRC Manager