Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Plan Number - S06-056
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/21/2006 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
08/24/2006 | KAROL ARAGONEZ | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Karol Aragonez Planner PROJECT: S06-056 Sierra Morado Unit 3 Final Plat Resubmittal TRANSMITTAL DATE: August 21, 2006 DUE DATE: September 19, 2006 The Zoning Review Section approves the final plat for this subdivision, subject to the tentative plat being approved. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements. If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550. KAA C:\planning\cdrc\finalplat\S06-056fpr.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan, tentative plat, final plat, CC&R's and additional requested documents. |
08/25/2006 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Denied | SUBJECT: SIERRA MORADO, UNIT 3 Lots 807-1117 S06-056 Tucson Electric Power Company (TEP) has received the final plat submitted for review August 21, 2006. TEP is unable to approve the plat at this time. An electrical design to determine our easement requirements will be provided on the Approved Tentative Plat with thirty (30) working days upon receipt of the plat. Additional plans necessary for preparation of the design are: building plans including water, electrical, landscape, sidewalk and paving plans. Also, submit the AutoCAD version of the plat on a CD or email to lcastillo@tep.com <mailto:lcastillo@tep.com> . Should you have any questions, please contact me at (520) 917-8745. Liza Castillo Right of Way Agent Land Management Tucson Electric Power Co. (520) 917-8745 lcastillo@tep.com |
09/14/2006 | KAY MARKS | PIMA COUNTY | ADDRESSING | Denied | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S06-056 SIERRA MORADO UNIT 3/REVISED FINAL PLAT DATE: September 14, 2006 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval: Should Arrolla Pina be Arrolla Pine? That is what was reserved. Please correct. Label all streets on pgs. 5-8. jg |
09/19/2006 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and floodplain Review, 09/19/2006 TO: Patricia Gehlen FROM: Laith Alshami, P.E. CDRC Engineering SUBJECT: Sierra Morado Unit 3 S06-056, T15S, R15E, SECTION 12 RECEIVED: Final Plat and CC & R's on August 21, 2006 The subject project has been reviewed. The subject submittal can not be approved at this time. We offer the following comments: Final Plat: 1. The Tentative Plat has not been approved yet. 2. Call out the centerline and provide the centerline information for Drexel Road, Bilby Road (D.S. 2-03.6.5.B.). 3. The distance and bearings between all monuments used shall be labeled whether they are measured or calculated (D.S. 2-03.6.5.C.5.). It does not appear that this comment was addressed properly in this submittal. 4. Sheet 8 of 13 does not show the 12' wide ADA compliant multi-use trail and trail easement, shown on the Tentative Plat (Sheet 10 of 12, extending east from Hoptree Place Cul De Sac. Clarify if this easement is existing (include the recording information) or if it is proposed to be dedicated by the Final Plat. 5. Provide a recent copy of the Title Report (more recent than January 18, 2006) in order to verify the easements that are shown on the Plat. It appears that there are several easements, included in the Title Report, are not shown on the Final Plat (look at items A5, A9, A10, A11, A12). Additionally, the Conservation Easement, DKT 12781, PG 2040, does not appear to be included in the Title Report. Clarify and revise as needed. 6. Submit a copy of the Assurances package. Assurances: 1. Remove the word "Grading" from Common Area "B" description in the Original Agreement recitals, the Amendment and all exhibits "A". 2. Add, in Exhibit "B", the following assurable item "All applicable fees, e.g. permit fees, impact fees must be paid in full to the City of Tucson prior to the final release of subdivision assurances. 3. Include the "Trust Agreement" in the Assurances Package. 4. Include the "Special Warranty Deed" in the Assurances Package. 5. Include in the Assurances Package and up to date Title report. Prepare a detailed response that explains the revisions that were made and references the exact location in the drainage report and on the Tentative Plat where the revisions were made. RESUBMITTAL REQUIRED: Revised Final Plat, Title Report and Assurances |
09/19/2006 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approved | September 18, 2006 To: Ryan Stucki, Stantec Thru: Patricia Gehlen, CDRC Project Manager City of Tucson Development Services Department From: Chandubhai C. Patel, P.E. Pima County Development Services Department Development Review Division (Wastewater) Subject: Sierra Morado, Unit 3 Lots 807-1117 and Common Areas "A"-"C" Final Plat – 2nd Submittal S06-056 The proposed final plat for the above-referenced project has been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat as received by us on August 18, 2006. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer lines or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Department of Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality prior to constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above comments, please do not hesitate to contact me. Sincerely, Chandubhai C. Patel, P.E. Telephone: (520) 740-6563 Copy: Project file |
09/21/2006 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES September 21, 2006 Ryan R. Stucki Stantec Consulting 201 North Bonita Tucson, AZ 85745 Subject: S06-056 Sierra Morado Unit 3 Final Plat Dear Ryan: Your submittal of August 21, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLUELINES MUST BE FOLDED 4 Copies Revised Final Plat (Addressing, TEP, Engineering, DSD) 2 Copies Title Report (Engineering, DSD) Should you have any questions, please call me at 791-5608 ext. 1179. Sincerely, Patricia Y. Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 750-7470 |