Plan Number: S06-056
Parcel: Unknown

Address: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S06-056
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/21/2006 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
08/24/2006 KAROL ARAGONEZ ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: Karol Aragonez
Planner

PROJECT: S06-056
Sierra Morado Unit 3
Final Plat Resubmittal

TRANSMITTAL DATE: August 21, 2006

DUE DATE: September 19, 2006

The Zoning Review Section approves the final plat for this subdivision, subject to the tentative plat being approved. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements.

If you have any questions about this transmittal, please call Karol Aragonez, (520) 791-5550.

KAA C:\planning\cdrc\finalplat\S06-056fpr.doc


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan, tentative plat, final plat, CC&R's and additional requested documents.
08/25/2006 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Denied SUBJECT: SIERRA MORADO, UNIT 3

Lots 807-1117

S06-056



Tucson Electric Power Company (TEP) has received the final plat
submitted for review August 21, 2006. TEP is unable to approve the plat
at this time.



An electrical design to determine our easement requirements will be
provided on the Approved Tentative Plat with thirty (30) working days
upon receipt of the plat. Additional plans necessary for preparation of
the design are: building plans including water, electrical, landscape,
sidewalk and paving plans. Also, submit the AutoCAD version of the plat
on a CD or email to lcastillo@tep.com <mailto:lcastillo@tep.com> .
Should you have any questions, please contact me at (520) 917-8745.


Liza Castillo
Right of Way Agent
Land Management
Tucson Electric Power Co.
(520) 917-8745
lcastillo@tep.com
09/14/2006 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S06-056 SIERRA MORADO UNIT 3/REVISED FINAL PLAT
DATE: September 14, 2006




The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:



Should Arrolla Pina be Arrolla Pine? That is what was reserved. Please correct.

Label all streets on pgs. 5-8.













jg
09/19/2006 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and floodplain Review, 09/19/2006

TO: Patricia Gehlen FROM: Laith Alshami, P.E.
CDRC Engineering

SUBJECT: Sierra Morado Unit 3
S06-056, T15S, R15E, SECTION 12

RECEIVED: Final Plat and CC & R's on August 21, 2006

The subject project has been reviewed. The subject submittal can not be approved at this time. We offer the following comments:

Final Plat:

1. The Tentative Plat has not been approved yet.
2. Call out the centerline and provide the centerline information for Drexel Road, Bilby Road (D.S. 2-03.6.5.B.).
3. The distance and bearings between all monuments used shall be labeled whether they are measured or calculated (D.S. 2-03.6.5.C.5.). It does not appear that this comment was addressed properly in this submittal.
4. Sheet 8 of 13 does not show the 12' wide ADA compliant multi-use trail and trail easement, shown on the Tentative Plat (Sheet 10 of 12, extending east from Hoptree Place Cul De Sac. Clarify if this easement is existing (include the recording information) or if it is proposed to be dedicated by the Final Plat.
5. Provide a recent copy of the Title Report (more recent than January 18, 2006) in order to verify the easements that are shown on the Plat. It appears that there are several easements, included in the Title Report, are not shown on the Final Plat (look at items A5, A9, A10, A11, A12). Additionally, the Conservation Easement, DKT 12781, PG 2040, does not appear to be included in the Title Report. Clarify and revise as needed.
6. Submit a copy of the Assurances package.

Assurances:

1. Remove the word "Grading" from Common Area "B" description in the Original Agreement recitals, the Amendment and all exhibits "A".
2. Add, in Exhibit "B", the following assurable item "All applicable fees, e.g. permit fees, impact fees must be paid in full to the City of Tucson prior to the final release of subdivision assurances.
3. Include the "Trust Agreement" in the Assurances Package.
4. Include the "Special Warranty Deed" in the Assurances Package.
5. Include in the Assurances Package and up to date Title report.


Prepare a detailed response that explains the revisions that were made and references the exact location in the drainage report and on the Tentative Plat where the revisions were made.


RESUBMITTAL REQUIRED: Revised Final Plat, Title Report and Assurances
09/19/2006 FRODRIG2 PIMA COUNTY WASTEWATER Approved September 18, 2006

To: Ryan Stucki, Stantec

Thru: Patricia Gehlen, CDRC Project Manager
City of Tucson Development Services Department

From: Chandubhai C. Patel, P.E.
Pima County Development Services Department
Development Review Division (Wastewater)

Subject: Sierra Morado, Unit 3 Lots 807-1117 and Common Areas "A"-"C"
Final Plat – 2nd Submittal
S06-056

The proposed final plat for the above-referenced project has been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.



The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat as received by us on August 18, 2006.

Please note the following: Approval of the above referenced submittal does not authorize
the construction of public or private sewer lines or water distribution lines. Prior to the
construction of such features, a Construction Authorization (Approval To Construct) may
need to be obtained from the Pima County Department of Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the
Pima County Department of Environmental Quality prior to constructing, operating or engaging
in an activity which may cause or contribute to air pollution.


If you have any questions regarding the above comments, please do not hesitate to contact me.

Sincerely,


Chandubhai C. Patel, P.E.
Telephone: (520) 740-6563

Copy: Project file
09/21/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

September 21, 2006

Ryan R. Stucki
Stantec Consulting
201 North Bonita
Tucson, AZ 85745

Subject: S06-056 Sierra Morado Unit 3 Final Plat

Dear Ryan:

Your submittal of August 21, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

4 Copies Revised Final Plat (Addressing, TEP, Engineering, DSD)

2 Copies Title Report (Engineering, DSD)









Should you have any questions, please call me at 791-5608 ext. 1179.

Sincerely,


Patricia Y. Gehlen
CDRC Manager