Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S06-056
Parcel: Unknown

Address: Unknown

Review Status: Completed

Review Details: FINAL PLAT REVIEW

Plan Number - S06-056
Review Name: FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/26/2006 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
06/02/2006 PETER MCLAUGHLIN ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: Peter McLaughlin
Senior Planner
FOR: David Rivera
Principal Planner

PROJECT:
Sierra Morado Unit 3
S06-056
Final Plat

TRANSMITTAL: June 2, 2006
DUE DATE: June 26, 2006

1. Add the subdivision case number "S06-056" to the lower right hand corner /title block on each sheet. DS 2-03.6.1.K

2. Fill in the recordation information (docket #12420 and pages #1235-1296) for the CC&R's in the blanks of the Dedication Block.
DS 2-03.6.3.B.2.d

3. Since the project is located within the boundaries of a Planned Area Development (PAD) zone, include a reduced scale map of the entire PAD-12 District on the first sheet, indicating the location of the portion being developed. DS 2-03.6.1.F

4. Tentative Plat approval is required prior to final plat approval.

5. Add the beneficiary information (beneficiary's name and address, title company name and trust number) below the Dedication Block. DS 2-03.6.3.C


If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.
06/02/2006 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S06-056 SIERRA MORADO UNIT 3/REVISED FINAL PLAT
DATE: 6/01/06



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

1.) Include what portion of Civano Master Block Plat is being resubdivided on all Title Blocks.

2.) Make sure all lot numbers can be seen on Site Index per letter dated 3/30/06.







es
06/02/2006 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S06-056 SIERRA MORADO UNIT 3/REVISED FINAL PLAT
DATE: JUNE 26, 2006




The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:


Move Civano II Blks 1-2 Bk 58, Pg 92 to the correct location on Location Map.
Label approved interior street names.

Include file number on all pages.

Center lots 1037-1042 on pg. 2.

All books and pages must be filled in or deleted before this records.

Correct sections on pg. 7 & 10.




jg
06/06/2006 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Denied SUBJECT: SIERRA MORADO, UNIT 3
Lots 807-1117

S06-056



Tucson Electric Power Company (TEP) has received the final plat
submitted for review May 30, 2006. TEP is unable to approve the plat at
this time.



An electrical design to determine our easement requirements will be
provided on the Approved Tentative Plat within thirty (30) working days
upon receipt of the plat. Additional plans necessary for preparation of
the design are: building plans including water, electrical, landscape,
sidewalk and paving plans. Also, submit the AutoCAD version of the plat
on a CD or email to lcastillo@tep.com <mailto:lcastillo@tep.com> .
Should you have any questions, please contact me at (520) 917-8745.


Liza Castillo
Right of Way Agent
Land Management
Tucson Electric Power Co.
(520) 917-8745
lcastillo@tep.com
06/20/2006 FRODRIG2 PIMA COUNTY WASTEWATER Denied June 20, 2006

To: Ryan Stucki, Stantec

Thru: Patricia Gehlen, CDRC Project Manager
City of Tucson Development Services Department

____________________________________
From: Michael J. Harrington (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: Sierra Morado
Unit 3 Lots 807-1117 and Common Areas "A"-"C"
Final Plat - 1st Submittal
S06-056

The proposed final plat for the above-referenced project has been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.



The letter authorizing construction of a public and private gravity sewerage collection system, dated June 2, 2006, from the PCWMD Director, has been received by our office and is now in the project file.

Obtain a letter from the PCWMD's Development Services Section, written within the past 90 days, stating that treatment and conveyance system capacities for the project is available in the downstream public sewerage system. Provide a copy for this office. The required form may be found at:

http://www.pima.gov/wwm/forms/docs/CapResponseRequest.pdf.

The final plat for this project cannot be approved until a copy of this letter is in our project file. This is the 3rd request.

All Sheets: Add the subdivision case number, S06-056, to the title block of each sheet. This number should be shown larger or bolder than any cross-reference numbers. No wastewater review fees will be charged for sheets where this is the only required revision.

Sheet 1: In the Dedication block, 4th paragraph, 2nd sentence. Although City of Tucson may accept that Common Areas “A” & “B” are granted as easements to the PUBLIC, PCWMD would prefer that:

These elements are granted as easement to CITY OF TUCSON, PIMA COUNTY AND ALL UTILITY COMPANIES FOR THE PURPOSE OF…

Sheet 1: In the Dedication block, 4th paragraph, 3rd sentence. Revise this sentence so that:

PRIVATE SEWERS are included in the list of elements that an association of individual lot owners will take responsibility for the control, maintenance and liability for.

This office will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents.

Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the final plat. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet.

The next submittal of this project will be the second (2nd) submittal. A check for the review fee of this submittal in the amount of $50.00 (made out to PIMA COUNTY TREASURER) must accompany the revised set of bluelines and response letter.

If the number of sheets changes, please adjust the review fee accordingly.


If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter

CC: Project File
06/22/2006 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 06/22/2006


TO: Patricia Gehlen FROM: Laith Alshami, P.E.
CDRC Engineering

SUBJECT: Sierra Morado Unit 3
S06-056, T15S, R15E, SECTION 12

RECEIVED: Final Plat and CC & R's on May 30, 2006

The subject project has been reviewed. We offer the following comments:

Final Plat:

1. Include a reduced-scale map of the entire PAD District on the first sheet, including the location of the portion being developed (D.S. 2-03.6.1.F.).
2. Provide the complete S(YR)- _______ number (D.S. 2-03.6.1.K.).
3. The "Certification of Survey" should include also the words "or proposed survey monuments" ((D.S. 2-03.6.3.A.). Revise.
4. The project gross area is different from the Tentative Plat. Explain the discrepancy and revise either the Tentative or the Final Plat to reflect the correct area (D.S. 2-03.6.2.A.).
5. Remove the words "Rights-of-way and" from the 3rd paragraph of the dedication.
6. Provide the "Beneficiary" Block as required by D.S. 2-03.6.3.C.
7. It is not clear if the shown street names are final or the letter designations will be replaced with other names.
8. All lots that are adjacent to common areas should have 1' no vehicular access easements along the sides that abut the common area (D.S. 2-03.6.4.H.).
9. The proposed abandonment of the State Lease #3457 has to be been processed before the Final Plat can be approved.
10. The exact delineation of the proposed 42.50' right of way dedication is not clear (see Sheet 3 of 13, above Common Area "B" and lot 849). Clarify.
11. Show the detention/retention areas (within the common areas) in a surveyable and readily retraceable manner (D.S. 2-03.6.4.I.).
12. Provide right of way dimensions for all private streets on Sheet 9 of 13 (D.S. 2-03.6.4.A. and D.S. 2-03.6.5.B.).
13. Provide the centerline information for Drexel Road, Bilby Road and Melpomene Way ((D.S. 2-03.6.5.B.).
14. Show and call out the basis of bearing and demonstrate how the project ties into it. The purpose of the basis of bearings on a survey is to enable another surveyor to retrace the original survey. As such, the statement must be referenced to found readily locatable monuments (D.S. 2-03.6.5.C.). Please be advised that the "Basis of Bearing" description in the General Notes is different from the one shown on the Tentative Plat. Clarify
15. The distance and bearings between all monuments used shall be labeled whether they are measured or calculated (D.S. 2-03.6.5.C.5.).
16. It is not clear why Common Area's "B" are dedicated in the Title Block for "Grading". Grading usually is a temporary activity during construction time. Clarify. Additionally, since Common Area "B" has parking areas, the common area description should also include "Parking". Revise as necessary.
17. Common Area "B", between lots 925 and 926, is smaller than the area shown on the Tentative Plat. Clarify the change and address whether this change will be reflected on the Tentative Plat and whether it impacts the proposed drainage scheme.
18. There is a Common Area "B", between lots 917 and 918, that was not shown on the Tentative Plat. Clarify the change and address whether this change will be reflected on the Tentative Plat and whether it impacts the proposed drainage scheme.
19. Sheet 8 of 13 does not show the 12' wide ADA compliant multi-use trail and trail easement, shown on the Tentative Plat (Sheet 10 of 12, east of lot 954). Clarify if this easement is existing (include the recording information) or if it is proposed to be dedicated by the Final Plat.
20. Provide a recent copy of the Title Report in order to verify the easements that are shown on the Plat.
21. In order to expedite the plat review and approval, provide the boundary survey and closure calculations report in accordance with D.S. 2-03.6.5.C.3.
22. Provide all applicable keynotes on all the sheets.
23. Submit a copy of the Assurances package.

CC & R's

The CC & R's are acceptable for Engineering and Floodplain purposes.

Prepare a detailed response that explains the revisions that were made and references the exact location in the drainage report and on the Tentative Plat where the revisions were made.


RESUBMITTAL REQUIRED: Revised Final Plat, Title Report and Assurances
06/27/2006 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Gary Ault, Mapping Supervisor
Pima County Assessor’s Office
Mapping Department

DATE: June 26, 2006


RE: Assessor’s Review and Comments Regarding Final Plat
S06-056 Sierra Morado Unit 3 T151512 (141-01)

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor’s Office requirements.
_______ Plat does not meet Assessor’s Office requirements.


COMMENTS: Thank you for your submittal.

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.







Susan King
07/11/2006 FRODRIG2 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed
07/11/2006 FRODRIG2 COT NON-DSD REAL ESTATE Approved S06-056 Sierra Morado Unit 3: Final Plat Review - Concerning State Lease #3457, City does not object to the removal ofannotation "75.00' Right-of-Way per State Lease #3457 to be abandoned by separate instrument".
07/13/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

July 13, 2006

Ryan R. Stucki
Stantec Consulting
201 North Bonita
Tucson, AZ 85745

Subject: S06-056 Sierra Morado Unit 3 Final Plat

Dear Ryan:

Your submittal of May 30, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

6 Copies Revised Final Plat (Addressing, TEP, Wastewater, Zoning, Engineering, DSD)

2 Copies Title Report (Engineering, DSD)









Should you have any questions, please call me at 791-5608 ext. 1179.

Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/
Via fax: 750-7470