Plan Number: S06-025
Parcel: Unknown

Address:
2000 N 1ST AV

Review Status: Completed

Review Details: FINAL PLAT REVIEW

Plan Number - S06-025
Review Name: FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/03/2006 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
04/04/2006 FRODRIG2 PIMA COUNTY WASTEWATER Approv-Cond February 27, 2006

To: Rick Murillo, Stantec

Thru: Patricia Gehlen, CDRC Project Manager
City of Tucson Development Services Department

____________________________________
From: Michael Harrington (520-740-6579), representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: Rancho Del Sol Condominiums
Units 1-88 & Common Element "A"
Final Plat - 1st Submittal
S06-025

The proposed final plat for the above-referenced project has been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


This project will be tributary to the Roger Road Wastewater Treatment Facility via the Santa Cruz East Interceptor. Per written guidance provided by the PCWMD Development Services Section, sufficient conveyance and treatment capacity exists in the downstream public sewerage system for this project, and a formal capacity response letter from PCWMD will not be required. The on-site sanitary sewers exist and are privately operated and maintained.

All Sheets: Add the subdivision case number, S06-025, to the title block of each sheet. This number should be shown larger or bolder than any cross-reference numbers. No wastewater review fees will be charged for sheets where this is the only required revision.

Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.


If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter

CC: Project File
04/11/2006 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: RANCHO DEL SOL CONDOMINIUMS
S06-025



Tucson Electric Power Company has reviewed and approved the plat
submitted for review April 4, 2006.



Please call me at (520) 917-8745, should you have any questions.




Liza Castillo
Right of Way Agent
Land Management
Tucson Electric Power Co.
(520) 917-8745
lcastillo@tep.com
04/26/2006 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S06-025 RANCHO DEL SOL CONDOMINIUMS/FINAL PLAT
DATE: 4/26/06



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

Include lots in resubdivision information on all Title Blocks.

Change First Street to Avenue on Project Layout.

Include the unit numbers that are being used.

Include unit numbers on the Project Layout.

Change Mansfield Height Addition Book 7, Page 90 to Tucson Heights Book 2, Page 18 on pgs. 2 & 3.

Change unit 65 to 66 on pg. 3.



es
05/01/2006 JOSE ORTIZ ENGINEERING REVIEW Approved
05/04/2006 FRODRIG2 COT NON-DSD REAL ESTATE Approved S06-025 Rancho del Sol Condominiums: Final Plat Review. On-site parking configurations are oriented so parked vehicles back out into public alleys. A conflict is evident with on-site parking, the public/private use of private property and the two alleys.** R.E. has no other comments.
05/15/2006 PGEHLEN1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed WATER SUPPLY
Tucson Water has been designated by the State of Arizona, Department of Water Resources, as having an assured water supply. This does not mean that water service is currently available to the proposed development. This development lies within the exterior boundary of Tucson Water's planned 50-year service area. Therefore, water supply is assured.

WATER SERVICE
The approval of water meter applications is subject to the availability of water service at the time an application is made. The developer shall be required to submit a water master plan identifying but not limited to:

Water Use
Fire Flow Requirements
Offsite / Onsite Water Facilities
Loops and Proposed Connection Points to Existing Water System
Easements / Common Areas

Any specific area plan fees, protected main / facility fees and / or other needed facilities' cost are to be paid by the developer.

If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be fiscally responsible for modifying/enhancing the existing water system to meet those needs.

This letter shall be null and void one year from the date of issuance.

Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development.

If you have any questions, please call New Development at 791-4718.

Sincerely,



Richard S. Williamson, P.E.
Manager, New Development
RW:bjh
05/16/2006 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Gary Ault, Mapping Supervisor
Pima County Assessor’s Office
Mapping Department

DATE: April 28, 2006


RE: Assessor’s Review and Comments Regarding Final Plat
S06-025 Rancho Del Sol Condominiums T141406 (123-14)

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor’s Office requirements.
_______ Plat does not meet Assessor’s Office requirements.


COMMENTS: Thank you for your submittal.

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.









Susan King
05/22/2006 PETER MCLAUGHLIN ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: Peter McLaughlin
Senior Planner
FOR: David Rivera
Principal Planner

PROJECT:
Rancho Del Sol Condominiums
S06-025
Final Plat

TRANSMITTAL: May 22, 2006
DUE DATE: May 1, 2006

1. Add the subdivision case number "S06-025" to the lower right hand corner /title block on each sheet. DS 2-03.6.1.K

2. The minimum text size required is 12 point (.012") for microfilming purposes. Revise the lettering in the Curve Table and in the Map Reference Notes on sheet 2 of 11 to meet this minimum archiving standard. DS 2-03.6.1.C

3. The Approval and Recording Data Blocks must be placed adjacent to each other on sheet 1 of 12. DS 2-03.6.3.D

4. For condominium conversion projects such as this, an affidavit is required showing that all requirements of LUC 4.1.9 have been met. Prior to final plat approval, submit a copy of this affidavit which demonstrates compliance with LUC 4.1.9.2. LUC 4.1.9

5. Show all easements on the final plat. DS 2-03.6.4.A

6. Revise the zoning designation to the south on the project layout map on sheet 1 to be correct. Only a portion of the block to the south is zoned C-1. The east portion of this block is zoned R-2.

7. If there is a common elements, as indicated in the CC&R's, dedication block and title block, label its location and delineate it clearly with a solid line and in a surveyable manner on the plat. DS 2-03.6.1.H.1
DS 2-03.6.4.C


If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.
05/25/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

May 25, 2006

Rick Murillo
Stantec Consulting, Inc.
201 North Bonita Avenue
Tucson, AZ 85745

Subject: S06-025 Rancho Del Sol Condominiums Final Plat

Dear Rick:

Your submittal of April 4, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

3 Copies Revised Final Plat (Addressing, Zoning, DSD)

2 Copies LUC Affidavit (Zoning, DSD)









Should you have any questions, please call me at 791-5608 ext. 1179.

Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/
Via fax: 750-7470