Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT REVIEW
Plan Number - S06-025
Review Name: FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/03/2006 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
04/04/2006 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approv-Cond | February 27, 2006 To: Rick Murillo, Stantec Thru: Patricia Gehlen, CDRC Project Manager City of Tucson Development Services Department ____________________________________ From: Michael Harrington (520-740-6579), representing the Pima County Departments of Wastewater Management and Environmental Quality Subject: Rancho Del Sol Condominiums Units 1-88 & Common Element "A" Final Plat - 1st Submittal S06-025 The proposed final plat for the above-referenced project has been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. This project will be tributary to the Roger Road Wastewater Treatment Facility via the Santa Cruz East Interceptor. Per written guidance provided by the PCWMD Development Services Section, sufficient conveyance and treatment capacity exists in the downstream public sewerage system for this project, and a formal capacity response letter from PCWMD will not be required. The on-site sanitary sewers exist and are privately operated and maintained. All Sheets: Add the subdivision case number, S06-025, to the title block of each sheet. This number should be shown larger or bolder than any cross-reference numbers. No wastewater review fees will be charged for sheets where this is the only required revision. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter CC: Project File |
04/11/2006 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: RANCHO DEL SOL CONDOMINIUMS S06-025 Tucson Electric Power Company has reviewed and approved the plat submitted for review April 4, 2006. Please call me at (520) 917-8745, should you have any questions. Liza Castillo Right of Way Agent Land Management Tucson Electric Power Co. (520) 917-8745 lcastillo@tep.com |
04/26/2006 | KAY MARKS | PIMA COUNTY | ADDRESSING | Denied | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S06-025 RANCHO DEL SOL CONDOMINIUMS/FINAL PLAT DATE: 4/26/06 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval: Include lots in resubdivision information on all Title Blocks. Change First Street to Avenue on Project Layout. Include the unit numbers that are being used. Include unit numbers on the Project Layout. Change Mansfield Height Addition Book 7, Page 90 to Tucson Heights Book 2, Page 18 on pgs. 2 & 3. Change unit 65 to 66 on pg. 3. es |
05/01/2006 | JOSE ORTIZ | ENGINEERING | REVIEW | Approved | |
05/04/2006 | FRODRIG2 | COT NON-DSD | REAL ESTATE | Approved | S06-025 Rancho del Sol Condominiums: Final Plat Review. On-site parking configurations are oriented so parked vehicles back out into public alleys. A conflict is evident with on-site parking, the public/private use of private property and the two alleys.** R.E. has no other comments. |
05/15/2006 | PGEHLEN1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Passed | WATER SUPPLY Tucson Water has been designated by the State of Arizona, Department of Water Resources, as having an assured water supply. This does not mean that water service is currently available to the proposed development. This development lies within the exterior boundary of Tucson Water's planned 50-year service area. Therefore, water supply is assured. WATER SERVICE The approval of water meter applications is subject to the availability of water service at the time an application is made. The developer shall be required to submit a water master plan identifying but not limited to: Water Use Fire Flow Requirements Offsite / Onsite Water Facilities Loops and Proposed Connection Points to Existing Water System Easements / Common Areas Any specific area plan fees, protected main / facility fees and / or other needed facilities' cost are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be fiscally responsible for modifying/enhancing the existing water system to meet those needs. This letter shall be null and void one year from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Sincerely, Richard S. Williamson, P.E. Manager, New Development RW:bjh |
05/16/2006 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Gary Ault, Mapping Supervisor Pima County Assessor’s Office Mapping Department DATE: April 28, 2006 RE: Assessor’s Review and Comments Regarding Final Plat S06-025 Rancho Del Sol Condominiums T141406 (123-14) * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor’s Office requirements. _______ Plat does not meet Assessor’s Office requirements. COMMENTS: Thank you for your submittal. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. Susan King |
05/22/2006 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Peter McLaughlin Senior Planner FOR: David Rivera Principal Planner PROJECT: Rancho Del Sol Condominiums S06-025 Final Plat TRANSMITTAL: May 22, 2006 DUE DATE: May 1, 2006 1. Add the subdivision case number "S06-025" to the lower right hand corner /title block on each sheet. DS 2-03.6.1.K 2. The minimum text size required is 12 point (.012") for microfilming purposes. Revise the lettering in the Curve Table and in the Map Reference Notes on sheet 2 of 11 to meet this minimum archiving standard. DS 2-03.6.1.C 3. The Approval and Recording Data Blocks must be placed adjacent to each other on sheet 1 of 12. DS 2-03.6.3.D 4. For condominium conversion projects such as this, an affidavit is required showing that all requirements of LUC 4.1.9 have been met. Prior to final plat approval, submit a copy of this affidavit which demonstrates compliance with LUC 4.1.9.2. LUC 4.1.9 5. Show all easements on the final plat. DS 2-03.6.4.A 6. Revise the zoning designation to the south on the project layout map on sheet 1 to be correct. Only a portion of the block to the south is zoned C-1. The east portion of this block is zoned R-2. 7. If there is a common elements, as indicated in the CC&R's, dedication block and title block, label its location and delineate it clearly with a solid line and in a surveyable manner on the plat. DS 2-03.6.1.H.1 DS 2-03.6.4.C If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
05/25/2006 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES May 25, 2006 Rick Murillo Stantec Consulting, Inc. 201 North Bonita Avenue Tucson, AZ 85745 Subject: S06-025 Rancho Del Sol Condominiums Final Plat Dear Rick: Your submittal of April 4, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLUELINES MUST BE FOLDED 3 Copies Revised Final Plat (Addressing, Zoning, DSD) 2 Copies LUC Affidavit (Zoning, DSD) Should you have any questions, please call me at 791-5608 ext. 1179. Sincerely, Patricia Y. Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 750-7470 |