Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S06-006
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S06-006
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/29/2006 MARILYN KALTHOFF START PLANS SUBMITTED Completed
04/03/2006 FRODRIG2 PIMA COUNTY WASTEWATER Approved March 31, 2006

To: Rick Murillo, Stantec

Thru: Patricia Gehlen, CDRC Project Manager
City of Tucson Development Services Department

____________________________________
From: Michael J. Harrington, representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: Solana Vista Condominiums
Units 100 to 108 et al
Final Plat - 2nd Submittal
S06-006

The proposed final plat for the above-referenced project has been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.



The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.


If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter

CC: Project File
04/04/2006 PETER MCLAUGHLIN ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: Peter McLaughlin
Senior Planner

FOR: David Rivera
Principal Planner

PROJECT:
Solana Vista Condominiums
S06-006
Final Plat

TRANSMITTAL: April 4, 2006
DUE DATE: April 12, 2006

COMMENTS: The Zoning Review Section at the Development Services Department approves the final plat for this subdivision, subject to the following requirement. However, should there be any changes requested by other CDRC members, the approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements.

1. Provide a copy of the signed and notarized affidavit with the sign-off copies for the condominium conversion showing that all requirements of LUC 4.1.9 have been met. LUC 4.1.9

2. The parking calculation on sheet 1 reads 178 vehicle parking spaces to be provided but only 170 spaces are indicated on the plat drawing on sheet two and in the title block. Based on the approved plan for the existing apartments, no fewer than 178 spaces are required for the condominiums. Revise drawing /sheet 2 to show all required vehicle parking.


If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.
04/10/2006 JOSE ORTIZ ENGINEERING REVIEW Approved
04/18/2006 FRODRIG2 COT NON-DSD REAL ESTATE Approved Real Estate's comments below...

>>> Andy Steuart 4/17/2006 4:28:37 PM >>>

S06-006 Solana Vista Condominiums: Final Plat. Per review of Stantec 3/29/06 Ltr., Real Estate para. 1., Real Estate identified a conflict with onsite parking, public/private use of private property, alley, Winstel and Haskell right of way. After consultation with the City Attorney's office, ARS 33-1205, is not considered applicable in this case because the re-plat of the subdivision is considered as a new use of the existing subdivision. R.E. does not object to the proposed use.

1. The re-subdivision changes the use of the parcel from multiple unit apartment to condominium type of housing (new use).

2. Zoning points out that the parking configuration displayed on proposed Final Plat (existing) is different than the approved site plan. Therefore the new traffic circulation patterns are not an approved existing use.

3. Real Estate stands by its initial recommendations that the public/private traffic circulation patters of private property, the alley, Winstell and Haskell should be reviewed and improved. If necessary Real Estate will assist in any additional dedications or vacations of right of way.
05/06/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

May 6, 2006

Rick Murillo
Stantec Consulting, Inc.
201 North Bonita Avenue
Tucson, AZ 85745

Subject: S06-006 Solana Vista Condominiums Final Plat

Dear Rick:

The above referenced project has been CONDITIONALLY APPROVED by the Community Design Review Committee. Please make the any necessary corrections and submit the following documents:

(2) Title reports current within the last (30) days.
(1) Executed Final Plat Double Matte Océ or Photo Mylar.
(1) * Check made to "Reproductions, Inc." in the amount of $8.50 per plat page for Mayor & Council distribution.
(1) * Check made to "Reproductions, Inc." in the amount of $55.00 per plat page for recorded plat distribution.
(1) Check made to "Pima County Recorder" in the amount of $20.00 per plat page plus a $4.00 handling fee, along with CC&R fees if applicable. CCR fees are $9.00 for the first 5 pages and $1.00 for each additional page.
(1) Executed and notarized CC&Rs (if applicable).

*Please do not combine the checks for "Reproductions, Inc.". They are processed at different times and require separate checks. An account number is also acceptable.

Assurances (if applicable) must be reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CCR's and assurances must be approved at the same Mayor and Council Meeting. Please expect 7-8 weeks from the date submitted to the date scheduled for Mayor and Council approval.

Should you have any questions, please call me at 791-5608 ext. 1179.

Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 750-7470