Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S05-164
Parcel: Unknown

Address: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Plan Number - S05-164
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/24/2006 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
04/26/2006 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S05-164 INTERSTATE BUSINESS PARK/REVISED TENTATIVE PLAT
DATE: April 26, 2006



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.




***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through the Pima
County Subdivision Coordinator. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***









jg
05/03/2006 JOE LINVILLE LANDSCAPE REVIEW Denied 1) Clarify if the portions of the project will be phased. For example if the drainage improvements are installed in an initial phase with the road construction, then the landscape requirement for dust control is applicable. In addition, if the retention basin in the northern portion of the site is constructed, then it will be required to meet the grading and landscaping requirements of DS 10-01.
DS 10-01.V.5.2 (p. 100), LUC 3.7.4.3.A, DS 2-03.2.4.E
A landscape plan will be required for the proposed basin.
DS 2-03.2.1.C

2) Revise the plan to include slope ratios for retention and detention basins. Basin slopes are required to have slopes no steeper than 4:1 where depths exceed three feet, 3:1 for unprotected slopes and 2: 1 for protected slopes for depths less than three feet. DS 10-01.4

3) The landscape coverage for the retention/detention
basin should be at least 35%. Provide landscape plans for the basin and include provisions for dust control per
LUC 3.7.2.7 for all disturbed portions of the site. Indicate limits of grading on the landscape plan. DS 2-07.2.2.B
05/11/2006 FRODRIG2 COT NON-DSD REAL ESTATE Approved S05-164 Interstate Business Park: Resubmittal - CDRC - Tentative Plat. No comment.
05/15/2006 LOREN MAKUS ENGINEERING REVIEW Denied DATE: May 15, 2006

To: Patricia Gehlen
CDRC/Zoning Manager
FROM: Loren Makus, EIT
Engineering Division

SUBJECT: Interstate Business Park
Tentative Plat S05-164 (Third Review)
T14S, R14E, Section 30

RESUBMITTAL REQUIRED: Tentative Plat, Drainage Report

The Tentative Plat and Drainage Report have been reviewed by the Engineering Division and we do not recommend approval at this time. The following review comments must be addressed.

Tentative Plat
1. Since the drainage scheme for the project has changed from each lot providing its own retention and detention to having project-wide retention and detention, address the change in the General Notes on the Tentative Plat and in your response letter. Note 20 indicates that the maintenance will be the responsibility of the individual lot owners. Confirm that this note is the intent of the developers or revise the note to provide for common maintenance. The drainage report indicates that a lot owners' association will be required.
2. Clearly indicate the proposed drainage structures on the Tentative Plat. Show the location of each check dam and where the pipes will be provided with orifice plates.
3. Provide details with sufficient details to demonstrate that retention will be achieved in the pipes as proposed. Provide entry and exit inverts to demonstrate that the volume will be contained and will not merely flow out through the non-blocked pipe. This should be reflected on the Tentative Plat and in the Drainage Report.

Drainage Report
4. Provide details with sufficient details to demonstrate that retention will be achieved in the pipes as proposed. Provide entry and exit inverts to demonstrate that the volume will be contained and will not merely flow out through the non-blocked pipe. This should be reflected on the Tentative Plat and in the Drainage Report.
5. Number all pages in the drainage report including the Appendices. Include the page numbers for the appendices in the table of contents.

Please note that a Stormwater Pollution Prevention Plan and Floodplain Use Permit will be required as part of the grading permit submittal.
Submit a revised Tentative Plat and a revised Drainage Report. Include a detailed response letter, detailing how each comment has been addressed.
If you have any questions, I can be reached at 791-5550 x1161 or loren.makus@tucsonaz.gov.

Loren Makus, EIT
Senior Engineering Associate
05/17/2006 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Denied Traffic only has one question on this plat; is the cul-de-sac at the east end of the project a new connection to Ajo Way? If so, identify all access control on the plan because it may need to be permitted by ADOT(?).
I will foreword the drainage to Dan Williams for his comments. Thank you. TM.
06/03/2006 DAVID RIVERA ZONING REVIEW Approved TO: Development Services Department Plans Coordination Office
FROM: David Rivera
Principal Planner

PROJECT: S05-164
Interstate Business Park II, Lots 1 through 16
Tentative Plat

TRANSMITTAL DATE: June 3, 2006

DUE DATE: May 08, 2006

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. The Zoning Review Section verifies that the tentative plat meets the requirements of the Land Use Code. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the corrected tentative plat to verify that those changes do not affect any zoning requirements.

If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

C:\planning\cdrc\finalplat\S05164fpa.doc
06/05/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

June 23, 2006

Jeff Stanley
P.O. Box 1888
Tucson, AZ 85702

Subject: S05-164 Interstate Business Park Tentative Plat

Dear Jeff:

Your submittal of April 24, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

4 Copies Revised Tentative Plat (Landscape, Engineering, ADOT, DSD)

2 Copies NPPO Plan (landscape, DSD)

3 Copies Revised Drainage Report (ADOT, engineering, DSD)

ADOT HAS NOT SUBMITTED COMMENTS CONCERNING THE DRAINAGE REPORT. PLEASE CONTACT ADOT FOR REQUIRED REVISIONS PRIOR TO RESUBMITTAL OF THIS TENTATIVE PLAT.


Should you have any questions, please call me at 791-5608, ext 1179.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 297-3944