Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S05-109
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Plan Number - S05-109
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/28/2005 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
11/30/2005 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S05-109 FAIRVIEW INDUSTRIAL PARK / REVISED TENTATIVE PLAT
DATE: November 30, 2005



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.


***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through the Pima
County Subdivision Coordinator. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***
12/01/2005 JOE LINVILLE LANDSCAPE REVIEW Denied 1) Revise the landscape plans to provide screening along Fairview Industrial Park Place. LUC Table 3.7.2-I
The screening may only be located within the street landscape border in accordance with LUC 3.7.3.2.C. The screening proposal still includes unacceptable gaps and may encroach too far into the street landscape border. The screening is required to conceal the land use from street and public view.

2) Show Identify any screening proposed along Fairview Avenue on the landscape plan. LUC Table 3.7.2-I,
DS 2-07.2.2.A.3

3) Provide screen walls for any loading areas within 100 feet of any street per LUC Table 3.7.2-I on the landscape plan. DS 2-07.2.2.A.3

4) Revise the plans to show any applicable sight visibility triangles and revise the landscape plans to comply with the sight visibility standards. DS 3-01.5.0
Refer to Detail S2 on shet 3 of the TP/DP for the location of the future sight visibility triangle and revise as requested.

RESUBMITTAL OF ALL PLANS IS REQUIRED
12/05/2005 JCLARK3 ENV SVCS REVIEW Approved
12/14/2005 JOSE ORTIZ ENGINEERING REVIEW Approv-Cond DATE: DECEMBER 14, 2005

TO: Patricia Gehlen

FROM: Jose E. Ortiz, PE

SUBJECT: Fairview Industrial Park - TENTATIVE PLAT
Job S05-109 T13S, R13E, Sec 35

RESUBMITTAL REQUIRED: A copy of the modified Drainage Report.

A conditional approval will be applied to the Tentative Plat, and a final approval will be granted once the following comment has been addressed.

Drainage Report

1. Need to specify within the Drainage Report who will be responsible for the maintenance of the retention basins per the Standard Manual for Drainage Design and Floodplain Management Section 14.3 (Pages 14.03 and 14.04). We also recommend including a copy of the check list in the CC & R's to allow the Home Owners Association access to the list and facilitate their maintenance responsibility.


If you have any questions or would like to meet with me you may contact me at 791-5640 ext.1191 or Jose.Ortiz@tucsonaz.gov
12/15/2005 DALE KELCH COT NON-DSD TRAFFIC Approved Traffic Engineering recommends APPROVAL of this TP/DP

D. Dale Kelch, PE
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dale.kelch@tucsonaz.gov
12/21/2005 HEATHER THRALL ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Heather Thrall
Senior Planner

PROJECT: S05-109
Fairview Industrial
Tentative Plat/Development Plan

TRANSMITTAL: 12/21/2005

DUE DATE: 12/12/2005

COMMENTS:

1. Section 4.1.7.1, LUC, permits a maximum of one year from the date of application to obtain approval of a tentative plat. If, at the end of that time, the tentative plat has not been approved, it must be revised to be in compliance with all regulations in effect at that time, and must be resubmitted for a full CDRC review. The one-year expiration date for this tentative plat is July 4, 2006.

2. Per last review - please label the future curb for Fairview Avenue and the future property line on page 6 of the submittal.

3. Please clearly label the amount provided and location of the bicycle parking areas for Lots 2, 3, 8 and 10 on the resubmittal.

4. The handicapped parking provided for Lot 9, near the north end of the site, does not have a ramp nor access aisle. If this parking space is to be provided as a handicapped accessible space, please provide an access aisle and ramp designed to meet standards defined in ANSI Chapters 4 and 5.

Please correct the location of the painted handicapped parking sign on Lot 4 - the handicapped paint symbol should be referencing the parking space, not the access aisle.

5. Please clarify if the pedestrian access aisles leading to Fairview Business Park Place on Lots 1 and 10 are in flush with the asphalt when bisecting the landscape area, or if ramps are needed.

NOTE: Truncated domes are needed on these same pedestrian access areas - where transitioning from pedestrian to vehicular use areas.

6. Please revise the dimensions of the loading space on lot 3 to read "12" by 55, not 20 feet, as was listed.

7. Per last review - please revise the typical parking space detail "L" to include wheel stops, with dimension information. Wheel stops must be placed two and one half feet (2.5) from the front of a parking space.

8. Per first review - the City of Tucson Major Streets and Routes Map lists the maximum right of way for Fairview Avenue as 76 feet. The submittal indicates a maximum right of way at 60 feet, with a cross-section provided to that effect. To ensure the correct right of way is noted on this plan, as future road widening would impact this site, please contact Gary Oaks at Department of Urban Planning and Design, 791-4505. Please provide a written statement from Gary Oaks with the future right of way width for Fairview clarified.

9. Depending upon the responses provided, further review comments may be forthcoming. Please contact me via email at Heather.Thrall@tucsonaz.gov or at 791-4541x1156 if you have any questions.


If you have any questions about this transmittal, please call (520) 791-5608.

C:\planning\cdrc\tentativeplat\S05-109.fairview.3rd.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan/tentative plat.
12/29/2005 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

December 29, 2005

Morris I. Riback
Urban Engineering
877 South Alvernon Way, Suite 200
Tucson, AZ 85711

Subject: S05-109 Fairview Industrial Park Tentative Plat

Dear Morris:

Your submittal of November 28, 2005 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

4 Copies Revised Tentative Plat (Landscape, Zoning, Engineering, DSD)

4 Copies Revised Landscape Plan (Engineering, Landscape, Zoning, DSD)

2 Copies Modified Drainage Report (Engineering, DSD)

Should you have any questions, please call me at 791-5608, ext 1179.

Sincerely,

Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 318-3808