Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: S05-082
Parcel: Unknown

Address:
102 E DELTA RD

Review Status: Completed

Review Details: RESUBMITTAL- RECORD OF SURVEY

Plan Number - S05-082
Review Name: RESUBMITTAL- RECORD OF SURVEY
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/13/2006 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
02/21/2006 JCLARK3 ENV SVCS REVIEW Approved
02/27/2006 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S05-082 NASSAR/FREIJ 4 LOT SPLITS / REVISED OTHER SUBDIVISION REVIEW
DATE: February 23, 2006



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.
03/07/2006 LOREN MAKUS ENGINEERING REVIEW Denied S05-082
Nasser/Freij Land Split
Engineering Review Comments
Loren Makus - Reviewer
6 March, 2006

Resubmittals required: Revised Record of Survey, Drainage Report and Grading Plan reflecting all revisions.

Engineering Division has reviewed the proposed Record of Survey/Land split proposal, and approval is not recommended at this time. Please address the following comments prior to resubmittal:

1. There appears to have been a lot split recorded for this parcel earlier this year. Provide copies of the approved lot split documents with your resubmittal. Additional comments may be forthcoming once the earlier split has been addressed.
2. Street dedications in accordance with the Major Streets and Routes (MS&R) Plan must be shown.. Record of Survey approval will not occur prior to dedication. The dedication must be by separate instrument. Provide recording information on the plan. (DS 2-03.2.4 H).
3. The drainage report must address Balanced Basin Flow attenuation requirements. Refer to Section 2.1 of the Pima County/City of Tucson Stormwater Retention/Detention Manual (DS 10-01.0). Please provide a revised report adressing how this proposed development will meet these requirements, or how alternative design(s) may preclude providing such.
4. Refer to Section 2.2 for 5-year threshold retention requirements. Since the parcel was created from a parcel larger than one acre after September 4, 1984, threshold retention is required. (DS 10-01.0). Provide water harvesting/drainage easements for the water harvesting areas. Provide recordation information on the record of survey.

If you have any questions, please feel free to contact me at 791-5550 x 1161 or at loren.makus@tucsonaz.gov

Loren Makus
Senior Engineering Associate
Engineering Division
Development Services Dept.
04/04/2006 TERRY STEVENS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: S05-082
5901 S. 6th Av.
Nasser/Freij 4 Lot Split

TRANSMITTAL: 04/04/06 3rd review

DUE DATE: 2/28/06

COMMENTS:

1. The following comment has not been addressed.

DS 2-03.11.7.E Place the words "Book_____Page______" in both the upper and lower right corners out side the margin line. The blanks will be completed by the Pima County Recorder"s Office at the time of recordation.

2. The following comment has not been addressed. If it has not already been completed contact the Real Estate Division of the City of Tucson for direction on completion of the right of way dedication.

DS 2-03.11.11.E. Projects bounded by streets having only a portion of the Major Streets and Routes (MS&R) right-of-way width will be required to dedicate right-of-way to the MS&R width. Right-of-way dedication is required prior to Land Survey Exception approval. Include right-of-way dedication recordation information on the plan.

Right of way dedication cannot be done by a record of survey. It must be completed and recorded prior to approval of the record of survey. Indicate on Record of Survey sheet #1 the docket and page recordation information for the dedication.

3. On the supplemental page clearly indicate location of the following:

1. Dimension from back of future curb to the west wall of the new structure on lot 1. The required set back for the structure on lot 1 along the west property line is 21' or the height of the structure from back of future curb. The indicated 18' setback from back of future curb does not meet the minimum 21' required setback.
2. Indicate clearly the height of the building walls towards each property line The required setbacks of perimeter yards for a R2 zone is 10' or ¾ the height of the structure which ever is greater. If the walls toward the east and west property lines are 18.5' in height as indicated the required setbacks are 13.9'. Lot 1 on the east perimeter yard setback is indicated as 8', this does not meet the minimum required 10'. Dimension the setbacks for the front setback and perimeter yard setbacks for all lots. (Missing east setback for lot 4 and all front and rear setback dimensions)
3. Location of existing and future sight visibility triangles have not been indicated on the supplemental sheets.

If you have any questions about this transmittal, please call Terry Stevens, (520) 791-5608 @ ext 2000.


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development plan, tentative plat, final plat, CC&R's and additional requested documents.
04/14/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

April 14, 2006

Charles Corrales
Steve Corrales Engineering Corporation
1008 West Saint Mary's Road, Bdg #1
Tucson, AZ 85745

Subject: S05-082 Nasser/Freij Record of Survey

Dear Charles:

Your submittal of February 13, 2006, for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

3 Copies Revised Record of Survey (engineering, zoning, DSD)

3 Copies Revised Landscape Plans (engineering, zoning, DSD)

2 Copies Revised Drainage Report and Grading Plans (engineering, DSD)


An extention of the review period must be request in writing and granted prior to resubmittal of this record of survey.


Should you have any questions, please call me at 791-5608, ext 1179.

Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 622-2554
04/14/2006 PATRICIA GEHLEN ZONING-RECORDATION REVIEW Needs Review