Review Date Reviewer's Name Type of Review Description Status Comments
04/26/2005 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
04/27/2005 JIM EGAN COT NON-DSD FIRE Denied 1. Fire hydrant required.
2. Minimum 20 feet wide, paved, fire apparatus access roadway must be provided and extended to within 150 feet of all portions of the exterior walls of proposed structures. An approved turnaround is required for dead-end access roadways.
04/29/2005 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved NO COMMENT
S05-067
MONTANO PROPERTY
05/06/2005 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S05-067 MONTANO PROPERTY / OTHER SUBDIVISION REVIEW
DATE: MAY 6, 2005



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

1: Change Camino Seco (western most) to Pantano Road on Location Map.

2: Delete Tanque Verde Road on Location Map.
05/09/2005 JCLARK3 ENV SVCS REVIEW Approv-Cond * No known landfill is within 1000 feet of this property.
* Refuse collection would be at the right of way of Speedway Place. Property owners would be required to bring the refuse containers and remove such containers from the collection area on the day of collection.
05/17/2005 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Approved DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S05-067 Montano Property 05/17/05

() Tentative Plat
() Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
(xxxxx) Other – Record of Survey

CROSS REFERENCE:

NEIGHBORHOOD PLAN: Pantano East Area Plan

GATEWAY/SCENIC ROUTE:

COMMENTS DUE BY: 05/24/05

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

(xxxxx) No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
() See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:
() Resubmittal Required:
() Tentative Plat
() Development Plan
() Landscape Plan
() Other

REVIEWER: VF 791-4505 DATE: 05/13/05
05/20/2005 JOE LINVILLE LANDSCAPE REVIEW Approved
05/24/2005 LOREN MAKUS ENGINEERING REVIEW Denied DATE: May 24, 2005

To: Patricia Gehlen
CDRC Coordinator
FROM: Loren Makus, EIT
Engineering Division

SUBJECT: Montano Property
Record of Survey S05-067(First Review)
T14S, R15E, Section 04

RESUBMITTAL REQUIRED: Tentative Plat, Drainage Report

The Tentative Plat and Drainage Report have been reviewed by the Engineering Division and we do not recommend approval at this time. The following review comments must be addressed.

Land Survey Comments
1. Provide a description of the monument at the NE Corner of the SW ¼ of the SE ¼ of Section 4 and provide recordation information.
2. Provide a basis of bearing. The basis of bearing should be established from two found physically monumented points described and shown on the plan.
3. Label all boundary monuments as found or set.
4. Indicate whether the distance between monuments is calculated or measured.
5. Provide a name for the proposed land survey in the Title Block.

Submit a revised Land Survey. Include a detailed response letter, detailing how each comment has been addressed.
If you have any questions, I can be reached at 791-5550 x1161 or loren.makus@tucsonaz.gov.

Loren Makus, EIT
Senior Engineering Associate
05/26/2005 FRODRIG2 OTHER AGENCIES PIMA ASSN OF GOVTS Approved 19 ESTIMATED DAILY TRIPS IN 24 HR PERIOD.
05/26/2005 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: MONTANO PROPERTY
S05-067

Tucson Electric Power Company has reviewed and approved the plans submitted
for review April 26, 2005.

It appears that there are no conflicts with the existing facilities within
the boundaries of this proposed development. However, location of the
underground electrical cables are to be determined by blue stake.

In order to apply for electric service, call the New Construction Department
at (520) 770-2062. Submit a final set of plans including approved site,
offsite and electrical load plans. Include a CD with the AutoCAD version of
the plans. If easements are required, they will be secured by separate
instrument. Your final plans should be sent to:

Juan Valenzuela
Design/Build - DB 102
Tucson Electric Power Company
P. O. Box 711
Tucson, AZ 85702

Please call me at (520) 917-8745, should you have any questions.

Liza Castillo
Right of Way Agent
Land Management
Tucson Electric Power Co.
(520) 917-8745
lcastillo@tep.com <mailto:lcastillo@tep.com>
05/26/2005 DALE KELCH COT NON-DSD TRAFFIC Approved Traffic Engineering recommends APPROVAL of this other subdivision review.

D. Dale Kelch, EIT
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dale.kelch@tucsonaz.gov
05/31/2005 MARILYN KALTHOFF COT NON-DSD REAL ESTATE Approved
06/01/2005 GLENN HICKS COT NON-DSD PARKS & RECREATION Approved DATE: May 27, 2005

TO: Ferne Rodriguez, Development Services

FROM: Glenn Hicks, Parks and Recreation

SUBJECT: CDRC Transmittal, S05-067 Montano Property: Other Subdivision Review

CC: Patricia Gehlen, Development Services


No comments.







Glenn Hicks
Parks and Recreation
791-4873 ext. 215
Glenn.Hicks@tucsonaz.gov
06/07/2005 DAVID RIVERA ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: David Rivera
Principal Planner

PROJECT: S05-067
Montaño Property
Record of Survey - 2 lots

TRANSMITTAL: 06/07/05

DUE DATE: 05/24/05

COMMENTS:

1. An applicant has one (1) year from the date of submittal to obtain approval of a Record of Survey plat that complies with zoning and other development requirements in effect at the time of application. This Record of Survey plat must be approved and recorded on or before April 25, 2005.

2. Identify conditions within the square mile area, such as land surveys, major streets, major watercourses, and railroads. Reference recorded land survey plats by book and page numbers. DS 2-03.11.7.D.2

3. Please provide a margin along the upper right corner of the sheet and place the words Book ______ and Page______. DS 2-03.11.7.E

4. Revise the title block as follows. The first line in the Title Block should state "Record of Survey" the name of the survey such as "Montaño Property" should be the second line. The third line should include the number of lots such as "Lots 1 and 2". The last line in item in the title block should be the brief legal description. DS 2-03.11.7.F.1-.4

5. A legend, which shows and describes all symbols used on the drawing, will be placed on either the first sheet, which contains all, or part of the drawing. DS 2-03.11.I

6. List the names, addresses, and telephone numbers of the primary owners of the site. DS 2-03.11.8.A.1

7. This project has been assigned the subdivision case number S05-067. Please list the case number in the lower right corner of all plan sheets. DS 2-03.11.8.B

8. The following information regarding the existing public right-of-way will be provided: the name, right-of-way width, recordation data, types and dimensioned width of paving, curbs, curb cuts, and sidewalks. This information must be provided for the street Speedway Place, which fronts the property. DS 2-03.11.11.B

9. The following information regarding existing utilities will be provided: the location and size of water wells, water pumping plants, water reservoirs, water lines, fire hydrants, and storm and sanitary sewers, including the pipe diameter and the invert and rim elevations of all manholes and cleanouts; the Pima County Wastewater Management Department (PCWMD) reference number; locations of gas lines, electric and telephone lines, poles, and on-ground junction boxes, and street lights. If water mains and sewers are not located on or adjacent to the tract, indicate the direction, distance to, and sizes of those nearest the property. Show sewer line invert elevations. DS 2-03.11.11.C

10. All zoning classifications, on and adjacent to the project, shall be indicated on the drawing with zoning boundaries clearly delineated. DS 2-03.11.11.D

11. All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. Recordation information (docket and page) must be included on the plan prior to final approval. Please clarify if the 20-foot ingress/egress and PUE is existing or is proposed. The recordation data for the proposed or existing 20-foot easement must be listed on the plan prior to final approval of the Record of Survey. DS 2-03.11.12.A


If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

DGR I:\planning\cdrc\recordofsurvey\S05067RofS.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Record of Survey and additional requested documents.
06/20/2005 FRODRIG2 PIMA COUNTY WASTEWATER Approv-Cond May 09, 2005

To: Daniel Montano, Daniel Montano

Thru: Patricia Gehlen, CDRC Project Manager
City of Tucson Development Services Department

____________________________________
From: Tim Rowe, P.E. (520-740-6563), representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: Montano Property - Lot Split
Record of Survey - 1st Submittal
S05-067

The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.



Public sewer line, I-70-11, is located approximately 250' away from the eastern boundary of the property being split, but per conversations with the owner, he wants these lots to be served by on-site wastewater treatment and disposal (septic) systems.

Per Arizona Administrative Code, R18-9-A309, a connection to a sewage collection system is required, if the connection is considered practical. To serve these lots using septic systems, the owner/developer of this property will need to obtain a waiver from the requirement to connect to the public sewer system from the Pima County Department of Environmental Quality, by demonstrating that a connection to the public sewer system is not practical per Arizona Administrative Code R18-9-A309.A.5.

At the time a request for building permit is submitted for review, the property owner shall therefore either:
Propose that both new lots will be connected to the public sewer system, or
Demonstrate that connecting these lots to the public sewer system is impractical, and that the soils on the lots are suitable for the use of on-site sewage disposal systems.

Mr. Robert Flynt of Pima County Development Services may be contacted for more information about the procedure for obtaining such waivers at 740-6502.

Show how the new 20' ingress/egress easement is to created.

Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the Record of Survey.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.



If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter
06/20/2005 PATRICIA GEHLEN ZONING-RECORDATION REVIEW Denied Recordation can not occur until plan is approved
06/21/2005 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

June 20, 2005

Daniel Montano
925 N. Natachee
Tucson, AZ 85710

Subject: S05-067 Montano Property Record of Survey

Dear Daniel:

Your submittal of April 26, 2005 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

6 Copies Revised Record of Survey (fire, environmental services, zoning, engineering, addressing, DSD)



Should you have any questions, please call me at 791-5608 ext. 1179.


Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 885-1840