Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Plan Number - S05-052
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/26/2006 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
07/07/2006 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approv-Cond | July 5, 2006 To: Kent A. Delph, P.E., Delph Engineering, Inc. Thru: Patricia Gehlen, CDRC Project Manager City of Tucson Development Services Department ____________________________________ From: Michael J. Harrington (520-740-6579), representing the Pima County Departments of Wastewater Management and Environmental Quality Subject: Barrio Pantano Lots 1-57 and Common Areas "A"-"D" Final Plat - 2nd Submittal S05-052 The proposed final plat for the above-referenced project has been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The Sewer Service Agreement has been forwarded to PCWMD for further processing. Sheet 1: General Notes #6 and #12 are the same. Sheet1: Revise the Beneficiary block so that: The title company name appears as it does in the Dedication block. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter CC: Project File |
07/15/2006 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Peter McLaughlin Senior Planner FOR: David Rivera Principal Planner PROJECT: Barrio Pantano S05-052 Final Plat TRANSMITTAL: July 15, 2006 DUE DATE: July 25, 2006 1. As acknowledged in the respsonse comments tentative plat approval is required prior to final plat approval. If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
07/19/2006 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S05-052 BARRIO PANTANO/FINAL PLAT DATE: 7/18/06 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** ES |
07/21/2006 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Denied | SUBJECT: BARRIO PANTANO Lots 1-57 S05-052 Tucson Electric Power Company (TEP) has received the final plat submitted for review June 26, 2006. TEP is unable to approve the plat at this time. An electrical design to determine our easement requirements will be provided on the Approved Tentative Plat within fifteen (15) working days upon receipt of the plat. Additional plans necessary for preparation of the design are: building plans including water, electrical, landscape, sidewalk and paving plans. Also, submit the AutoCAD version of the plat on a CD or email to lcastillo@tep.com <mailto:lcastillo@tep.com> . Should you have any questions, please contact me at (520) 917-8745. Liza Castillo Right of Way Agent Land Management Tucson Electric Power Co. (520) 917-8745 lcastillo@tep.com |
07/25/2006 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 07/25/2006, TO: Patricia Gehlen FROM: Laith Alshami, P.E. CDRC Engineering SUBJECT: Barrio Pantano S05-052, T14S, R15E, SECTION 219 RECEIVED: Final Plat and Assurances on June 26, 2006 Final Plat: The subject submittal has been reviewed. The Final Plat can not be approved at this time. Address the following comments on a revised Final Plat: 1. Show a 1' no access easement on the side of lots 44, 45, 1 (adjacent to Common Area "D") and 7 (adjacent to Common Area "B") (D.S. 2-03.6.4.H). 2. Although the basis of bearing is shown on the Plat, it does not appear that the subject development is tied into the basis of bearing. Verify compliance with the requirements of D.S. 2-03.6.5.A. 3. Revise the words (City of Tucson Engineer) in the Assurances Block to (City of Tucson Development Services Department Engineering Administrator). 4. It does not appear that this project is dedicating any new public right of way, parks, drainageways, or new easements that necessitate paragraphs 2 and 3 in the Dedication. Address this issue and revise as necessary. Assurances: The Assurances Package is missing the following information: 1. The "Agreement to construct Subdivision Improvements" is missing Exhibit "A" to Exhibit "A". 2. Exhibit "B" to Exhibit "A" is missing the following assurable item: · "If any offsets against impact fees have been requested, all improvements that are the subject of the requested offsets shall be completed and accepted by the city prior to the final release of assurances. Assurances may be partially released prior to the completion of all improvements provided the releases are proportional to the level of completion of improvements". 3. The "Amendment to Trust" is missing Exhibit "A". CC & R's: 1. Revise Article Ten in the CC & R's to replace "Pima County" with "City of Tucson". 2. This Office recommends attaching the Drainage Facilities Maintenance Checklist to the CC & R's as an exhibit to facilitate the maintenance process for the Association. RESUBMITTAL REQUIRED: Revised Final Plat, Assurances and CC & R's |
07/25/2006 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | . |
07/26/2006 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES July 26, 2006 Kent Delph Delph Engineering 221 North Court #103 Tucson, AZ 85701 Subject: S05-052 Barrio Pantano Final Plat Dear Kent: Your submittal of June 26, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLUELINES MUST BE FOLDED 3 Copies Revised Final Plat (TEP, Engineering, DSD) Should you have any questions, please call me at 791-5608, ext 1179. Sincerely, Patricia Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 882-6570 |