Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S05-034
Parcel: Unknown

Address: Unknown

Review Status: Completed

Review Details: TENTATIVE PLAT REVIEW

Plan Number - S05-034
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/02/2005 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/04/2005 JIM EGAN COT NON-DSD FIRE Approved The Tentative Plat is approved March 04, 2005.
03/08/2005 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S05-034 LA ESTANCIA DE TUCSON/TENTATIVE PLAT
DATE: MARCH 4, 2005



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

Delete W from W I-10 on Location Map.

Change Los Reales Rd (in Section 19) to Via Rio Pico on Location Map.

Correct scale on pg. 4.

Delete all “EW” and “NS” on streets.

Change See Sheet 3 to 7 on pg. 8.

Label all named streets on Index to Sheets.

Add lot 493 to pg. 16.

Label Camino Boleadoras on pg. 17.

Change See Sheet 17 to 21 on pg. 17.

10.) Change See Sheet 16 to 20 and See Sheet 13 to 7 on pg. 21.


jg
03/10/2005 JCLARK3 ENV SVCS REVIEW Approved * No known landfill with in 1000 feet of this development.
* 690 individual lots approved for APC curbside service. APC's are to be placed and removed from the curbside collection area on the day of service.
03/25/2005 FRODRIG2 PIMA COUNTY WASTEWATER Denied March 24, 2005

TO: Wocky Redsar
Castro Engineering Corp.

THRU: Craig Gross
City of Tucson, Development Services Department

FROM: Dickie Fernández, E.I.T.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: La Estancia de Tucson – Phase I, Lots 1-693 and Common Areas A & B
Tentative Plat – 1st Submittal
S05-034


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


This project will be tributary to the Roger Road Wastewater Treatment Facility via the Southeast Interceptor. Provide a letter from PCWWM Planning Services, written within the past 90 days, stating that treatment and conveyance system capacity for this project is available. Contact Robert Decker, PCWWM Planning Services, at (520) 740-6625 regarding this matter.

Based on the evaluation of project S99-060, this project would qualify for Non-Participating sewer connection fee rates.

ALL SHEETS. Add the project number, S05-034, to the title block of each sheet. This number should be shown larger or bolder than any cross-reference numbers.

Be aware that you are proposing to connect to a large diameter sewer line and thus, will require flow management when connecting to this line.

SHEET 17. Your project proposes the abandonment of an existing private sewer easement as well as building homes over an existing private sewer line. Provide written proof that the owner of the private sewer will allow these actions. Will the private sewer line be abandoned? If so, show this on the layout. If the private sewer line will be abandoned, where will the owner of the private sewer line discharge to?

SHEETS 12, 15, 17 & 19. Show the size and Pima County plan number for the existing public sewer.

We will require a revised set of drawings and a response letter addressing each comment. Additional comments may be made during the review of these documents.

The next submittal of this project will be the 2nd submittal. A check for the review fee of this submittal in the amount of $200.00 made out to PIMA COUNTY TREASURER must accompany the revised set of bluelines and response letter.

For any questions regarding the fee schedule, please go to http://www.pimaxpress.com/SubDivision/Documents/Fees.PDF where you may find the appropriate wastewater review fees at the bottom of page 1. If the number of sheets changes, please adjust the review fee accordingly.

If you have any questions regarding the above mentioned comments, please contact me. Sincerely,





Dickie Fernández, E.I.T.
Telephone: (520) 740-6947

Copy: Project
03/25/2005 FRODRIG2 PIMA COUNTY WASTEWATER Denied July 27, 2005

TO: Wocky Redsar
Castro Engineering Corp.

THRU: Patricia Gehlen
City of Tucson, Development Services Department

FROM: Dickie Fernández, E.I.T.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: La Estancia de Tucson – Phase I, Lots 1-674, Common Areas A & B and Blocks A & B
Tentative Plat – 2nd Submittal
S05-098


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


This submittal contains nine more sheets than the previous one, therefore, an additional $450.00 payable to PIMA COUNTY TREASURER is required before the approval of this tentative plat. Item 23 of this review letter will indicate the total number of review fees to be paid, including these $450.00.

As previously requested on March 24, 2005, please provide a letter from PCWWM Planning Services, written within the past 90 days, stating that treatment and conveyance system capacity for this project is available. Contact Robert Decker, PCWWM Planning Services, at (520) 740-6625 regarding this matter.

SHEET 12. Existing public sewer line G-84-050 is likely to be within a public sewer easement on the west side of this sheet. If that is the case, said easement shall be properly shown along with its recording information.

SHEET 13. Show the size and Pima County plan number for the existing public sewer.

SHEET 13. The existing public sewer likely lies within an existing public sewer easement. Show this easement along with its recording information.

SHEET 14. Label the sewer line starting at manhole 60 to be ductile iron pipe, as this section does not achieve the required four feet of cover for PVC pipe.

SHEET 15. Show the size and Pima County plan number for the existing public sewer.

SHEET 15. If there are any public sewer easements containing the existing public sewer, show them on this sheet along with their recording information.

SHEET 16. Show the size and Pima County plan number for the existing public sewer.

SHEET 16. Show the recording information for all public sewer easements.

SHEET 19. Show any public sewer easements that may be associated with the existing public sewer shown on this sheet, including the recording information.

SHEET 21. This sheet shows, what appears to be an existing public sewer. If so, show the size and Pima County plan number.

SHEET 22. Show the size and Pima County plan number for all existing public sewers shown on this sheet. Additionally indicate if any of those existing public sewers are abandoned.

SHEET 23. If any existing public sewers belong on this sheet, show them along with their size and Pima County plan number.

SHEET 24. Show the size and Pima County plan number for the existing public sewers shown on this sheet, along with any associated existing public sewer easements.

SHEET 25. There are three existing public sewers shown on this sheet. Show the size and Pima County plan number. Additionally, the existing public sewer along Via Pompas Morenus is only shown partially. Show this sewer in its entirety.

SHEET 26. There appears to be an existing public sewer along Via Pompas Morenus. Show this existing public sewer, its size, Pima County plan number and any associated existing public sewer easements.

SHEET 27. There appears to be an existing public sewer and an existing private sewer that should be included on this sheet. Show them both and include the size. Include the Pima County plan number for the existing public sewer.

SHEETS 28 & 29. Show any existing public sewers, their size and Pima County plan number that may be on this sheet and/or within 100 feet of the project boundaries.

SHEET 30. Indicate which sewers are existing and which sewers are abandoned.

SHEET 30. Show the size and Pima County plan number for all existing public sewers on this sheet. If the sewer without a Pima County plan number is a private sewer, use a different line type to differentiate between public and private sewers.

Please follow the following during your revision of this project as a rule of thumb:

Show different line types for existing public sewers, existing private sewers, sewers that will be abandoned and proposed public sewers. Reflect this in the legend in Sheet 1.
Where ever existing public sewers may be located, show the size and Pima County plan number.
Where ever existing public sewers may be located, show their associated public sewer easements, along with the recording information. This easements shall be labeled rather than pointed with a keynote.

We will require a revised set of drawings and a response letter addressing each comment. Additional comments may be made during the review of these documents.

The next submittal of this project will be the 2nd submittal. A check for the review fee of this submittal in the amount of $1,074.00 ($450 + $624 = $1,074) made out to PIMA COUNTY TREASURER must accompany the revised set of bluelines and response letter.

For any questions regarding the fee schedule, please go to http://www.pimaxpress.com/SubDivision/Documents/Fees.PDF where you may find the appropriate wastewater review fees at the bottom of page 1. If the number of sheets changes, please adjust the review fee accordingly.

If you have any questions regarding the above mentioned comments, please contact me. Sincerely,





Dickie Fernández, E.I.T.
Telephone: (520) 740-6947

Copy: Project
03/28/2005 PETER MCLAUGHLIN ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Center
Plans Coordination Office

FROM: Peter McLaughlin
Senior Planner

FOR: David Rivera
Principal Planner

PROJECT:
S05-034
La Estancia de Tucson
Tentative Plat Review (1st review)

TRANSMITTAL: 3-28-05
DUE DATE: 3-31-05


1. An applicant has one (1) year from the date of application to obtain approval of a tentative plat that complies with zoning and other development requirements in effect at the time of application. This tentative plat must be approved on or before March 2, 2006.
LUC 4.1.7.1

2. Please place the S05-034 number in or near the title block in the lower right hand corner of all sheets of the plat, landscape and NPPO plans.
DS 2-03.2.2.B.1

3. Provide the proposed residential density in a calculation as a general note on sheet 1 of 21.
DS 2-05.2.1.D

4. As indicated in general note 26 the project is located within the Airport Environs Zone (AEZ). Add an Airport Hazard District (AHD) note to indicate that the elevation above median sea level (MSL) of the SE end of Davis Monthan Airforce Base runway is 2,705 feet. Include the mean elevation of the site and indicate max height of the proposed homes. Along with the maximum proposed building height add the maximum allowed building height to the notes. Provide elevation drawings to detail heights and to demonstrate compliance with PAD Standards. The subdivision is also partly located within the ADC-2 zone, which does not allow residential uses, some commercial uses, parks, and other uses listed in LUC 2.8.5.8.B.2. The ADC-2 line clips an area of the proposed residential subdivision near its northeast corner. In addition, most of the proposed subdivision area is within the NCD-65, which requires that residential site-built uses be insulated for sound attenuation as required by LUC 2.8.5.9. Add notes stating that the plat is subject to the requirements of ADC-2 and NCD-65. For clarity and to show where the AEZ applies, add the correct location of the AHD and ADC-2 and NCD-65 lines onto the maps. Refer to Davis-Monthan Airport Environs Zone maps to verify the location of these AEZ boundary lines. LUC 2.8.5.7.A.2

5. Revise the square footage of common area "A" (part of keynote 5) adjacent to realigned Julian Wash on sheet 16 of 21 to be correct. The square footage reads 2577 square feet but this common area scales to be much larger. Add the square footage of the parks (keynote 5) on sheets 13, 14 and 17 of 21. Add the square footage of common area "A" adjacent to lots 334-340 on sheet 18 of 21. Add the square footage of the drainage easements (common areas "B"-keynote 8) on sheets 12 and 17. Make sure all other common areas have the area stated on the plat.
DS 2-05.2.4.W

6. Include a reduced-scale map of the PAD district on the first sheet, indicating the location of the portion to be developed with this proposal. DS 2-05.2.1.F

7. Phasing note 7 indicates that, unless otherwise amended, dedications of right-of-way, assurances, construction of storm drains, parks, etc. must be done in sequence per the phasing plan. Development Note 1 on the La Estancia Block Plat states that no development, including grading, grubbing or other alterations shall occur on any portion of the platted property until the relocation of Julian Wash has been completed and evidence of the completion has been certified and recorded by the Devleopment Services Director. In addition, based on the PAD 7 document the relocation of Los Reales Road and Julian Wash will be completed prior to approval of phase 1. Provide evidence that this wash realignment has occurred. La Estancia Plat

8. Roads, parks and the general layout of the subdivision does not match the approved block plat for La Estancia. A new master block plat will be required so that dedications of public areas are correct and consistent with what is approved. Additional comments may be necessary based on a redesign or replatting of La Estancia. La Estancia Development PAD 7 Document, Block Plat

9. A requirement of the La Estancia Pad 7 is that linear park be provided along Julian Wash and bike lanes be provided along main project roads. Label the location of the linear park and bike route on the drawings to further clarify what is shown in the Julian Wash cross section A on sheet 2 of 4. Document - PAD 4 Development Area 2
Development Standard e

10. Per La Estancia Pad document, all proposed development plans must be submitted to the La Estancia Design Review Committee prior to Development Plan Review. Document - PAD 7 Section IV-B.

11. All requested changes must be made to the Development Plan and Landscape Plan.
DS 2-07.2.1.A

If you have any questions about this transmittal, please call Peter McLaughlin, (520)791-5608.
03/29/2005 FRODRIG2 OTHER AGENCIES PIMA ASSN OF GOVTS Approved Transportation Information for Rezoning,
Subdivision and Development Review Requests
File Number Description Date Reviewed
E
Pima Association of Governments
Transportation Planning Division
177 N. Church Avenue, Suite 405
Tucson, AZ 85701
Phone: (520) 792-1093
Fax: (520) 792-9151
www.pagnet.org
S05-034 La Estancia de Tucson 3/28/2005
1. Nearest Existing or Planned Major Street
2. Is improvement planned as part of the 5-Year Transportation Improvement Program
Planned Action:
STREET IDENTIFICATION
3. Existing Daily Volume – Based on Average Daily Traffic
4. Existing Daily Capacity- Level of Service “E”
5. Existing Number of Lanes
9. Estimated Traffic Generation for Proposed Development
(Expressed in Average 24 Hr. Vehicle Trips)
8. Future Number of Lanes
TRANSIT AND BIKEWAYS CONSIDERATIONS
10. Present Bus Service (Route, Frequency, Distance)
11. Existing or Planned Bikeway
Remarks:
Street Number 1 Street Number 2
Year Year
Planned Action:
VOLUME/CAPACITY/TRAFFIC GENERATION CONSIDERATIONS
6. Future Daily Volume - Adopted Plan System Completed
7. Future Daily Capacity - Level of Service “E”
Kolb (Valencia to I-10)
No 0
13,800
46,600
4
46,600
57,670
4
6,632
None
None
0
0
0
0
0
0
0
03/31/2005 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 03/31/2005

SUBJECT: La Estancia De Tucson
S05-034, T15S, R15E, SECTION 18

RECEIVED: Tentative Plat, Landscape Plan and Drainage Report on March 03, 2005

The subject submittal can not be reviewed until the revised Master Drainage Report and a revised Block Plat are submitted for review and approved.

This Office conducted an informal review for the revised Master Drainage Report and we offer the following comments:

Drainage Report:

1. The Revised Master Drainage Report should be submitted formally in conjunction with a revised Block Plat submittal.
2. The revised Master Drainage Report should be a stand-alone document. It should not cross-reference the previously approved Master Drainage Report for information. Revise the entire drainage report accordingly.
3. Revise Fig #1 to reflect the revised roadway network.
4. Table A on page 4 is missing several of the existing offsite runoffs. Revise.
5. Figure #3 does not appear to have all the concentration points that correspond to their perspective watersheds. Revise.
6. The realignment of the Julian Wash, including any required excavation and fill, requires a floodplain use permit. Revise Item #5 of the Methodology & Procedures accordingly.
7. A CLOMR and a LOMR are required for the proposed realignment of the Julian Wash. An approved CLOMR will be needed for the approval of any tentative plat and/or development that show improvements within the existing alignment of the Julian Wash. The fill within the existing Julian Wash should be made an assurable item and the LOMR will be needed prior to issuance of the first C of O.
8. Figure #2 does not include a Map Key or a Legend to help understand the different color-coded land uses. Revise.
9. It appears that Concentration Point ON-16, in Table C, has the wrong runoff amounts. Revise.
10. The text in page 8 states that nine culverts, two bridges and nine detention basins proposed to convey the flow across the site. Figure #4 shows different proposed drainage structures numbers. Revise the text and Table E to demonstrate consistency.
11. Table G shows that the post development Q2-year detention basin discharge for Concentration Points 6+7+8 has increased, which is not acceptable unless it can be demonstrated that the proposed increase will not adversely impact adjacent and downstream properties.
12. Without the Hydrological Sheets for the entire site existing conditions, the calculated retention basin volume adequacy could not be verified. Additionally, Section 4.2 states that the site area is 550 acres, yet Section 1.1 states that the site area is 558 acres. Verify the correct area and revise as necessary.
13. Show the streets names on the drainage exhibits.
14. Drainage related street designs for the proposed streets should be included in the revised Master Drainage Report.
15. Include the hydrologic data sheets for the existing conditions. Additionally, existing and proposed conditions hydrologic data sheets should be provided for all watersheds and subwatersheds.
16. It is not clear of Figure #3 where Offsite watershed IX, which is included in HEC-1 flow chart, is located.
17. HEC-1 flowchart shows onsite runoff 1-B concentrates at concentration point CP-1 instead of CP-1b as shown on Fogure #4. Revise.
18. Provide a legend for the labels used in the HEC-1 flowchart.
19. HEC-1 routing can not be reviewed effectively without including the offsite runoff in the Revised Drainage Report.
20. Show on Figure #4 the direction of flow within watershed 13.
21. Clarify how the proposed channels and culverts capacities were determined. Additionally, specify which watersheds will be discharging into the proposed channels and culverts.
22. It is not clear where the proposed scuppers will be located. Additionally, clarify how the scupper capacities were determined.
23. Clarify the purpose for the "Roadway Drainage Hydrologic Data Sheet" provided at the end of the report.
24. The Phasing Plan states that "certain drainage infrastructure is required to be built with the main infrastructure and other infrastructure can wait for the individual blocks to develop before being constructed". It is not clear if the drainage infrastructure to be built with the main infrastructure will be completely designed in the Revised Master Drainage Report (RMDR) or the design will be part of the individual blocks drainage reports. The RMDR addresses the design of some detention/retention basins, channels and box culverts, but it does not provide detailed design information such as erosion control requirements, water harvesting, retention basins percolation rates/bleed pipes, detention/retention basins maintenance ramps and sediment traps and drainage facilities maintenance responsibility, etc. Clarify.
25. Address 404 Permit requirements for this project
03/31/2005 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Denied DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S05-0034 La Estancia De Tucson 03/31/05

(x) Tentative Plat
( ) Development Plan
(x) Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: La Estancia PAD

NEIGHBORHOOD PLAN: Rincon / Southeast Subregional Plan

GATEWAY/SCENIC ROUTE: N/A

COMMENTS DUE BY: March 30, 2005

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
(x) See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:
(x) Resubmittal Required:
(x) Tentative Plat
( ) Development Plan
(x) Landscape Plan
( ) Other: Elevations

REVIEWER: E. Anderson 791-4505 DATE: 03/30/05

Department of Urban Planning and Design Comments
La Estancia De Tucson – D05-0034: 1st submittal

The La Estancia Planned Area Development (PAD) establishes comprehensive guidance and regulations for the development of homes and associated support services on approximately 565 acres along the north side of Interstate 10 between Kolb Road and Wilmot Road. The PAD implements the City of Tucson General Plan by specifying policies and site development standards, which replace the current zoning on the property. The subject property is located in the La Estancia PAD and Rincon/Southeast Subregional Plan. The La Estancia PAD, Rincon/Southeast Subregional Plan, General Plan, and Design Guidelines Manual all provide guidance for the review of this development.

It is staff’s understanding that the PAD needs to be replated, per the Real Estate Division. The following comments are in response to the first submittal and should be addressed after the replat process is completed and prior to the second submittal.

1. The PAD states that the project has been designed to locate residential uses outside the 65LDN noise levels and the air operations approach/departure zone. Residential development that may be affected by DMAFB will not be permitted without approval of DMAFB. Please submit a letter from DMAFB that supports the construction of the houses located in blocks 1, 2, 3, and 4, which are located in the 65 LDN.

2. Please locate all residential lots outside the ADC-2.

3. Please show the ADC-2 and NCD-A on the plat and state under General Notes that both exist. Also, please state what lots are located in the NCD-A and that they will be constructed with proper sound attenuation that reduces noise to the required level of 40-45 Ldn.

4. The PAD states that there needs to be a variety of housing types including single-family homes, patio homes, and apartments. The submittal shows all single-family homes in the 693 lot phase. Please create diversity in the types of housing provided. Opportunities exist to locate higher density housing (apartments) around the Village Center commercial area, in block 18, which is located adjacent to future commercial uses, in areas of blocks that are next to proposed high-density residential, and other sporadic locations throughout the development. (II.A, II.A.2.6, & II.A.2.7)

5. Please increase the densities in the MDR blocks that do not meet the minimum standards. Also, please provide the densities and the number of units for each block. (Land Use Density Table)

6. Blocks 18 and 26 have the opportunity to be developed together and provide for an opportunity for residential and commercial uses that are integrated, interconnected, and work together, not separately. Please configure block 18 to allow for better integration, connectivity, and cohesiveness with block 26. (II.A.2)

7. Collector streets are to be designed in conjunction with each of the subdivision plats. This was refined in the minor refinement letter to allow more flexibility to combine development pods and design the amount and type of streets to respond better to the needs of each subdivision. The major collector and the collector that leads to the industrial collector road, via the village center, are the only two collectors in the submittal. Please create a collector system in the tentative plat or demonstrate the need to not have any additional collectors. (minor refinement letter & II.B)

8. The size of the proposed commercial use on the northwest corner of the industrial collector and Kolb Road creates a need for access to and from the commercial use to a controlled intersection. Please provide a collector street north to the industrial collector that leads to the commercial property. This will help ensure a better coordinated and responsible planning approach. (refinement letter & II.A.2)

9. The proposed layout of the subdivision creates an environment along the major collector, Camino Boleadoras, which is dominated by screen walls. This needs to be addressed and altered to create an environment along the major collector that is more visually pleasing. (II.A.2.2, II.A.2.6, & II.A.2.7)

10. Please show the landscape in the medians along the major collector. The medians need to have a combination of canopy trees, understory, and ground vegetation.

11. Please show the landscape along the entire major collector, Camino Boleadoras. This needs to include a mix of low shrubs and colorful groundcover, in addition to the canopy trees. (II.D.3)

12. Via Bombachas is a minor collector street and therefore needs a secondary streetscape. Please provide the required landscape. (Exhibit II.D)

13. Please provide five feet wide sidewalks along all local streets.

14. Please locate, at minimum, one tree in the front yard of every lot. The tree needs to be at least 15 gallon in size. (II.D.5)

15. Please demonstrate the different neighborhood themes. Please provide the unique tree and plant palettes for each neighborhood. (II.D.5)

16. Construction of the Julian Wash park is the responsibility of the property owner and shall be completed during Phase I of the project. Please show the Julian Wash park and all the applicable amenities. Please construct the paths in the Julian Wash park to the same standards as the paths in the developments to the west. This includes a 12 feet wide hard surface path and an eight feet wide soft surface path. (II.C & I.A.2)

17.To make the Julian Wash park more accessible and to help separate vehicular and pedestrian circulation please provide access to the Julian Wash park path via EW St. A at an approximate interval of ¼ mile. There seems to be an opportunity to address these objectives and intents of the PAD with, or along the common areas labeled as ‘B’ that lead to the Julian Wash (between lots 17&18, the common area and 38, 442&443, and the area previously described as between lots 426&427). The access should include a sidewalk and appropriate vegetation that includes shade trees, understory, and ground vegetation. In addition, the access should be wide and open enough to allow for a safe feeling for all pedestrians. (I.A & I.A.2)

18. Construction of the community park is the responsibility of the property owner and shall be completed during Phase I of the project. Please show the community park and all the amenities. (II.C)

19. The proposed neighborhood parks need to be usable. Please provide amenities in these parks including bike racks. Depending on the size of the individual neighborhood parks, these amenities can include, park benches, picnic tables, water fountains, shade shelters, BBQ grills, tot lots, grass play areas, basketball courts, and other active recreational uses. Please shade all tot lots with a canopy, or similar structure that provides shade. Please provide a wide range of shade trees from the Low Water Use Drought Tolerant List. To increase appearance, shade and longevity diversity please provide some longer living trees, including evergreens that are in the Low Water Use Drought Tolerant List. This can include pines, or other evergreen trees, and oaks. Also, please do not locate any vegetation that has thorns at maturation in the parks. (minor refinement letter & II.D.6)

20. Construction of the Gas Line Park is the responsibility of the property owner and shall be completed during Phase I of the project. Please show the park and all the amenities. (II.C)

21. Please locate corridors from the residential area that connect to the Gas Line Park. This should can be accomplished along all east/west streets and along block 3 and block 4 (end of the cul-de-sac, between lots 547 & 548 and lots 379 & 380)

22. Please show the proposed use for Common Area “B” (south of lot 38) on the tentative plat. The landscape plan labels this area as Common Area “C”. Please label this are uniformly on the landscape plan and tentative plat.

23. Please create a more visually appealing development by incorporating the broad range of Sonoran Desert colors in the base and accent colors of the houses and varying the building elevations. Please see the following website for examples of possible shade of Sonoran Desert Colors. Please place a note on the tentative plat that states that no more than two houses in succession will have the same color patterns. Please place a note on the tentative plat that states that no more than two houses in succession will have the same building elevations. Please provide the proposed base and accent colors for the houses.
http://intranet.ci.tucson.az.us/cptf/sonorandesertcolors.pdf

24. Demonstrate the state of the art building techniques and design being used to conserve energy, water and non-renewable resources. (I.2 Project Objectives)

25. Provide for spine infrastructure to create a state of the art wired community and enable homes and businesses to take advantage of any new, enhanced communication opportunities. If this has been provided, please state on the development plan what infrastructure has been provided. (I.2. Project Objectives)
03/31/2005 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Denied DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S05-0034 La Estancia De Tucson 08/12/05

(x) Tentative Plat
( ) Development Plan
(x) Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: La Estancia PAD

NEIGHBORHOOD PLAN: Rincon / Southeast Subregional Plan

GATEWAY/SCENIC ROUTE: N/A

COMMENTS DUE BY: August 12, 2005

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
(x) See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:
(x) Resubmittal Required:
(x) Tentative Plat
( ) Development Plan
(x) Landscape Plan
( ) Other: Elevations

REVIEWER: Eric Anderson 791-4505 DATE: 07/28/05

Department of Urban Planning and Design Comments
La Estancia De Tucson – D05-0034: 2nd submittal

The La Estancia Planned Area Development (PAD) establishes comprehensive guidance and regulations for the development of homes and associated support services on approximately 565 acres along the north side of Interstate 10 between Kolb Road and Wilmot Road. The PAD implements the City of Tucson General Plan by specifying policies and site development standards, which replace the current zoning on the property. The subject property is located in the La Estancia PAD and Rincon/Southeast Subregional Plan. The La Estancia PAD, Rincon/Southeast Subregional Plan, General Plan, and Design Guidelines Manual all provide guidance for the review of this development.


4. The PAD states that there needs to be a variety of housing types including single-family homes, patio homes, and apartments. The submittal shows all single-family homes in the 674-lot phase. Please create diversity in the types of housing provided. Opportunities exist to locate higher density housing (apartments) around the Village Center commercial area, in block 18, which is located adjacent to future commercial uses, in areas of blocks that are next to proposed high-density residential, and other sporadic locations throughout the development. (II.A, II.A.2.6, & II.A.2.7)

6. Blocks 18 and 26 and Blocks 5 and 14, and 23 have the opportunity to be developed together and provide for an opportunity for residential and commercial uses that are integrated, interconnected, and work together, not separately. Please configure blocks to allow for better integration, connectivity, and cohesiveness with block 26. (II.A.2)

8. The size of the proposed commercial use on the northwest corner of the industrial collector and Kolb Road creates a need for access to and from the commercial use to a controlled intersection. If the size of the commercial use on the lot continues, please provide a collector street north to the industrial collector that leads to the commercial property. This will help ensure a better coordinated and responsible planning approach. Please show where this collector street will be located and connect to Camino Boleadoras. (refinement letter & II.A.2)

9. The proposed layout of the subdivision creates an environment along the major collector, Camino Boleadoras, which is dominated by screen walls. This needs to be addressed and altered to create an environment along the major collector that is more visually pleasing. (II.A.2.2, II.A.2.6, & II.A.2.7)

13. Please provide five feet wide sidewalks along all local streets. Since the PAD was approved in 1999, five feet wide sidewalks have been a standard in all PADs along local streets.

16. Construction of the Julian Wash park is the responsibility of the property owner and shall be completed during Phase I of the project. Please show the Julian Wash park and all the applicable amenities. Please construct the paths in the Julian Wash park to the same standards as the paths in the developments to the west. This includes a 12 feet wide hard surface path and an eight feet wide soft surface path. (II.C & I.A.2)

17.To make the Julian Wash park more accessible and to help separate vehicular and pedestrian circulation please provide access to the Julian Wash park path via Street A Please provide the access along the north side of Common Area “B” Drainage on the western side of the PAD, next to the drainage area where Street “H” ends to the north, north of lot 438, and from Block 18. The access should include a sidewalk and appropriate vegetation that includes shade trees, understory, and ground vegetation. In addition, the access should be wide and open enough to allow for a safe feeling for all pedestrians. (I.A & I.A.2)

19. Please shade all tot lots with a canopy, or similar structure that provides shade. (minor refinement letter & II.D.6)

23. Please create a more visually appealing development by incorporating the broad range of Sonoran Desert colors in the base and accent colors of the houses and varying the building elevations. Please see the following website for examples of possible shade of Sonoran Desert Colors. Please place a note on the tentative plat that states that no more than two houses in succession will have the same color patterns. Please place a note on the tentative plat that states that no more than two houses in succession will have the same building elevations. Please place a note that states that a wide range of Sonoran Desert colors will be used, similar to what is shown on the following website.
http://www.ci.tucson.az.us/planning/sonorandesertcolors.pdf

24. Demonstrate the state of the art building techniques and design being used to conserve energy, water and non-renewable resources. Please state under the General Notes what techniques and design will be used (I.2 Project Objectives)

25. Provide for spine infrastructure to create a state of the art wired community and enable homes and businesses to take advantage of any new, enhanced communication opportunities. Please state under General Notes what infrastructure has been provided. (I.2. Project Objectives)


New comments
26. Please provide shade trees along the sidewalks along all designated common areas. To provide a pleasing microclimate for pedestrians, the distance needs to be similar to the average lot width in the PAD. The vegetation in the pocket parks are acknowledged and sufficient per the policies of the PAD.
04/01/2005 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Ed Abrigo, Mapping Supervisor
Pima County Assessor’s Office
Mapping Department

DATE: March 30, 2005


RE: Assessor’s Review and Comments Regarding Tentative Plat
S05-034 La Estancia De Tucson T151518 (141-09)

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor’s Office requirements.
_______ Plat does not meet Assessor’s Office requirements.


COMMENTS: Thank you for your submittal. Please remove the hatching in the line of sight triangles, or cut away the hatching that goes over lettering.

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.







Susan King
04/08/2005 JOE LINVILLE LANDSCAPE REVIEW Denied 1) Based on the minor refinements proposed for the La Estancia PAD in the June 29, 2004 from Mike Grassinger of the Planning Center to the City of Tucson Planning Director, several changes to the PAD documents will be required in order to establish effective guidance and regulation. The following exhibits and sections from the October 11, 1999 document appear to be impacted by the changes contemplated and should be updated:
EXHIBIT II.A: LAND USE PLAN
EXHIBIT II.B: CIRCULATION PLAN
EXHIBIT II.C: OPEN SPACE/RECREATION PLAN
EXHIBIT II.C.3: GAS LINE PARK CONCEPTUAL ILLUSTRATIVE
EXHIBIT II.D: LANDSCAPE CONCEPT
EXHIBIT II.E: UTILITIES/PHASING PLAN
III DEVELOPMENT REGULATIONS
D. Landscape Plan

2) This proposal should be consistent with the phasing proposed on page 32 & 33 of the PAD. A number of improvements were proposed to be completed as part of Phase 1 of the PAD, such as development of the Julian Wash Linear park, relocation of Los Reales Road and the Julian Wash, construction of the community park, construction of the gas line park and various streets. Provide an update on the status and timing of these improvements. A revision to the phasing plan approved in the PAD and the La Estancia De Tucson Tentative Plat may be required.


3) Revise or clarify the plans as necessary to comply with the following section. "The Project's pedestrian network will connect residential Development Areas with open space areas and recreational facilities and will tie into the Julian Wash trail system. Bike and/or pedestrian paths will also be provided within the open space greenbelt buffers. Bike and pedestrian trail road crossings will be at road intersections where possible". LEPAD, p. 15

4) Demonstrate compliance with the following section: "The sidewalk trail system and the El Paso gas pipeline will interconnect neighborhoods and commercial areas with the Julian Wash Riverpark and the Community Park". LEPAD, p. 23

5) "The first phase of the park (1/2 of the total park area) must be in place once 250
residential units are built in the project. No other units may be built until this portion of the park is in place. Development of the remainder of the park will be required when 1,500 residential units are built". P.23
Demonstrate compliance with the above section from the PAD.

6) The proposed Community Park will include such facilities as soccer and ball fields,
picnic areas, tennis courts, and community meeting rooms. P. 23

Construction of the park, as described above, will be the responsibility of the property owner and shall be completed during Phase I of the project.







7) Revise the plans to provide the landscape elements identified Section D starting on p. 27 of the PAD.
A)Project Entry Statements, Secondary Entry Statements, Medians for major collectors, and Primary & Secondary Streetscapes are required.

B) It appears that the size of the entry features has been reduced on the plat and the improvements are not shown on the landscape plan.

C) 24" box trees are to be used on the primary streetscape.

D) Via Bombachas requires a secondary streetscape with landscape borders and medians.

E) The landscaping should be consistent with that shown in the PAD and tentative block plat.

F) Provide a landscape buffer for the south side of Camino Boleadoras.

G) Per LUC 2.6.3.11.B.3, changes to designated buffers or perimeter landscaping, as delineated in the PAD District are considered a substantial change.

H) Provide landscape/development plans for the Gas Line Park.

9) Provide calculations for landscape coverage and other information in accordance with the PAD DEVELOPMENT REGULATIONS, where applicable.

Low Density Residential (LDR): Development Area 1 (1a, 1b, 1c,
1d) Minimum landscape coverage: 20 percent of gross site area.

Medium Density Residential (MDR): Development Area 2 (2a, 2b,
2c, 2d, 2e, 2f, 2g) 4) Minimum landscape coverage: 20 percent of gross site area.


Medium High Density Residential (MHDR): Development Area 3 (3a, 3b) 5) Minimum landscape coverage: 10 percent of gross site area. (6) A 6-foot screen wall and a 5-foot landscape buffer shall be installed where the proposed Project abuts residential land uses.


High Density Residential (HDR): Development Area 4 (4a, 4b, 4c, 4d, 4e) (3) Minimum landscape coverage: 10 percent of gross site area. (4) A 6-foot screen wall and a 5-foot landscape buffer shall be installed where the proposed Project abuts residential land uses.

Village Commercial (VC): Development Area 5 (5a, 5b, 5c, 5d)

Public pedestrian ways may be located in required street landscape areas provided landscape area is a minimum 10 ft. wide and customer seating is adjacent to landscape
areas/pedestrian way.


Commercial (C): Development Area 6 (6a, 6b, 6c, 6d)
Building setback requirements may be reduced by 50% when any of the following conditions are met:
??Landscape requirements are increased by 50%.

Regional/Freeway Related Commercial (RFC): Development Area 7 (7a, 7b, 7c, 7d)

Provide transitions to adjacent residential uses by demonstrating compliance with Section I.5.a Mixed Use Opportunities and Use Transitions, in the Design
Guidelines Manual

1) All standards are as required for the I-1 Zone of the City of Tucson Land Use Code.

Light Industrial (LI): Development Area 8 (8a, 8b, 8c, 8d, 8e, 8f)

1) All standards are as required for the I-1 Zone of the City of Tucson Land Use Code.

10) Revise the native plant preservation plan to include the Native Plant Inventory and Mitigation Plans for Blocks 1-4.

11) Revise the NPP plan to include the off-site areas identified for improvements on sheets 4 & 18 of the tentative plat.

12) Provide specifics regarding where fencing will be installed on the native plant preservation plan and show the limits of grading. DS 2-15.3.4

13) Revise the native plant preservation and landscape plans as necessary to meet mitigation requirements for each phase of development. Remove the note regarding deferred mitigation on sheet N-1.

14) Revise the landscape and native plant preservation plans as necessary to correct the property lines, public streets will not have property lines in the center.

15) Provide Plans for Blk.19 (Community Park).

16) Revise the plat to clarify the status of the central drainage channel and the gas easement. The PAD identifies this area as a linear park, to be constructed by the owner. Provide landscape/development plans.

17) Revise the landscape submittal to include a sheet index and labeling for streets.

18) Identify the easement shown as keynote 6 on the tentative plat.

19) Include a native plant summary per DS 2-15.3.4.B on the landscape plans. Each phase of development is required to meet applicable requirements.

RESUBMITTAL OF ALL PLANS IS REQUIRED, ADDITIONAL REQUIREMENTS AND COMMENTS MAY APPLY.
04/11/2005 FRODRIG2 COT NON-DSD REAL ESTATE Approved No objection
04/11/2005 DALE KELCH COT NON-DSD TRAFFIC Denied Traffic Engineering REJECTS this TP:

1. La Estancia PAD requires the relocation of Los Reales Road to be completed prior to approval of phase 1. Provide evidence that this road realignment has occurred.

2. SVTs are not shown on sheet 15 where streets intersect with Via Pampas Morenas.

3. Developer shall submit a Traffic Impact Analysis modifying previously submitted TIA by PFS Traffic Engineering to accurately reflect the modified traffic circulation as amended by the La Estancia PAD minor refinement letter dated 29JUN2004.

D. Dale Kelch, EIT
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dale.kelch@tucsonaz.gov
04/12/2005 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Passed no comments.
04/22/2005 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: LA ESTANCIA DE TUCSON
Lots 1-693
S05-034

Tucson Electric Power Company (TEP) has no objection to the tentative plat
submitted for review March 3, 2005.

The preliminary point where TEP will serve this project is from the existing
facilities along Kolb Road and Wilmot Road proceeding through the interior
of the subdivision. Enclosed is a copy of TEP's facilities map showing the
approximate location and unit numbers of the existing facilities.

TEP will provide a preliminary electrical design on the Approved Tentative
Plat within thirty (30) working days upon receipt of the plat. Additional
plans necessary for preparation of the design are: building plans including
water, electrical, landscape, sidewalk and paving plans. Also, submit the
AutoCAD version of the plat on a CD or email to lcastillo@tep.com
<mailto:lcastillo@tep.com> . Should you have any questions, please contact
me at (520) 917-8745.


Liza Castillo
Right of Way Agent
Land Management
Tucson Electric Power Co.
(520) 917-8745
lcastillo@tep.com <mailto:lcastillo@tep.com>
04/27/2005 GLENN HICKS COT NON-DSD PARKS & RECREATION Denied DATE: April 26, 2005

TO: Ferne Rodriguez, Development Services

FROM: Glenn Hicks, Parks and Recreation

SUBJECT: CDRC Transmittal, S05-034 La Estancia De Tucson: Tentative Plat

CC: Craig Gross, Development Services


Julian Wash Linear Park
Please show details regarding the Julian Wash Linear Park.
The linear park should be consistent with the segment of Julian Wash Linear Park that has been constructed on
the west side of Wilmot Road.
The city/county minimum corridor width for linear parks is 50 ft.
Linear parks include a 12 ft wide paved path and 8 ft wide trail.
The paved asphalt path is constructed to the following specifications: 2" asphalt with 6" thickened edges over 4" compacted ABC.
The trail is constructed to the following specification: two(2) inch thickness, stabilized decomposed granite(1/4" minus) compacted to 95% over native subgrade compacted to 95%.
The paved path and trail are ADA accessible.
The corridor is landscaped with native plants and includes irrigation.
Trees are planted a maximum of 25 ft apart to provide shade to the path and trail.
Safety railing may be required near slopes.
Removable bollards placed in the center of the paved path may be required at roadway crossings.
Curb ramps for the paved path at roadway crossings should be 10 to 12 ft wide.
All drainages crossing the linear park should be below ground.
Parks and Recreation can provide a cross-section of the typical linear park on request.
The linear park design and construction shall be approved by the Parks and Recreation Department

Community Park
The community park will need more discussion with Parks and Recreation. In previous discussions in 1999 the following park facilities were recommended by Parks and Recreation:
Swim pool.
Raquet sports(1-2 tennis courts).
Picnic areas.
Walkways.
Restrooms.
Off-street parking.
5 little league teams, little league complex, 2 full-size fields, practice field, baseball and soccer.
Paved court.
Off-leash dog area.
Security lighting, dusk-to-dawn.
All open field activities that need lots of space should be in perimeter areas.


Gas Line Park
Please show trail/path details and connections for the Gas Line Park.


Glenn Hicks
Parks and Recreation
791-4873 ext. 215
Glenn.Hicks@tucsonaz.gov
04/27/2005 CRAIG GROSS ZONING-DECISION LETTER REVIEW Completed COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

April 30, 2005

Wocky Redsar
Castro Engineering Corp.
3580 West Ina Road, Suite 200
Tucson, AZ 85741

Subject: S05-034 La Estancia De Tucson Tentative Plat

Dear Wocky:

Your submittal of March 3, 2005 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

9 Copies Revised Tentative Plat (landscape, parks and recreation, zoning, engineering, traffic, addressing, community planning, wastewater, DSD)

5 Copies Revised Landscape Plan (engineering, community planning, landscape, Zoning, DSD)

2 Copies Revised Master Drainage Report (engineering, DSD)


Should you have any questions, please call me at 791-5608, ext 1179.

Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 293-2115