Plan Number: S05-030
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S05-030
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/25/2006 MARILYN KALTHOFF START PLANS SUBMITTED Completed
01/28/2006 CRAIG GROSS ZONING REVIEW Approv-Cond 1. Please revise index map and sheet 3 to include most recent design for connection of Antrim Loop on adjacent development C9-04-15. Change can be made to mylars.

2. Be advised that principal for Ray Water Company must sign mylars before submitted to City.

3. Real Estate must be contacted for right-of-way abandonement to be scheduled on same Council meeting as final plat. All ROW recording blanks on final plat must be filled in on final plat submittal.
02/28/2006 ELIZABETH EBERBACH ENGINEERING REVIEW Denied TO: Patricia Gehlen; CDRC Coordinator
SUBJECT: Cantera Final Plat Engineering Review resubmittal
LOCATION: T15S R14E Section 10
REVIEWER: Elizabeth Eberbach
ACTIVITY NUMBER: S05-030

SUMMARY: The revised Final Plat, closure sheet, title report, CC&R's, and response letter were received by Engineering on January 26, 2006. Engineering has reviewed the received items and does not recommend approval of the Final Plat or assurances at this time. Please address the following remaining Final Plat comments prior to resubmittal.

FINAL PLAT COMMENTS:
1) City of Tucson Development Standards (DS) Section No.2-03.2.4.K: The submittal of this final plat prior to final approval of differential grading is done at the applicant's risk since changes could be required of the tentative plat that may affect the final plat and incur further comments. For this project, differential grading process must be completed prior to issuance of grading permit.
2) DS Sec.2-03.6.4.K: In response letter, discuss status of Antrim Loop vacation and show recording information on plat planview.
3) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved. If a third party trust is proposed for the assurances for this project, provide the following:
a) Provide AMENDMENT TO TRUST / THIRD PARTY TRUST.
b) Provide AGREEMENT TO CONSTRUCT SUBDIVISION IMPROVEMENTS / THIRD PARTY TRUST.
c) If the final plat is approved before the grading plan, provide a list of assurable items, prepared by the engineer, for the AGREEMENT TO CONSTRUCT, which includes the fill to bring the lots out of the floodplain.
d) Provide copy of sample Warranty Deed.
e) For this and future projects, please provide two 8½" by 11" location map sheets for assurance submittals that go to Mayor & Council.
Assure that the descriptions of the common areas on the plat and in the descriptions in the Final Plat title block match the descriptions of the subdivision common areas in the assurance paperwork.
4) DS Sec.2-03.8.1.B, & 2-03.6.6: CC&R verbiage is acceptable for drainage. A final signed original copy of the CC&R's will eventually be needed for approval of the Final Plat.
5) DS Sec.2-03.6.4.F: Show the limits of the 100-year floodprone area in a surveyable and readily retraceable manner with frequent ties to intersecting lot lines for all flows of 100 cfs or more. Provide bearing and distances on all floodplain lines.
6) DS Sec.2-03.6.5.B: Address the following easement /survey comments:
a) Regarding the title report, explain and show on plat the easement for item 7 in schedule B.
b) DS Sec.11-01.9: For any proposed offsite construction, maintenance, or other easements, submit the original copy of the notarized permission from adjacent property owner. Provide docket and page for the construction / maintenance easements.
c) Provide crow's feet or other clarification for the location of the water easement along the east boundary of Blocks A&B.
d) Add survey monument at north end of line L37 on sheet 3.
7) DS Sec.2-03.6.3.C: Under Beneficiary, provide contact person's name.
8) DS Sec.2-03.6.5.C.5: Label / indicate for the distance and bearing between all boundary monuments used as measured (M) or calculated (C) or recorded (R).
9) DS Sec.2.4.K & 11-01.8: Please provide updated status of differential grading.

For the revised Final Plat resubmittal it will be necessary to address all the above comments, submit the revised Final Plat, assurance package, original CC&R's, original notarized permission letter, and detailed response letter. Call me at 791-5550, extension 2204, to discuss comments or to schedule a meeting to go over comments before resubmittal.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services
03/03/2006 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

March 3, 2006

Wocky Redsar
Castro Engineering Corp.
3580 West Ina Road, Suite 200
Tucson, AZ 85741

Subject: S05-030 Cantera Final Plat

Dear Wocky:

Your submittal of January 26, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

2 Copies Revised Final Plat (zoning, engineering, DSD)






Should you have any questions, please call me at 791-5608 ext. 1179.

Sincerely,


Patricia Y. Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 293-2115