Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT REVIEW
Plan Number - S05-029
Review Name: FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/19/2006 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
01/24/2006 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S05-029 SANTA RITA HOTEL AND CONDO / FINAL PLAT DATE: January 24, 2006 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. NOTE: 1: Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Development Plan to City Planning. Signed and dated Mylar will be forwarded to Pima County Addressing prior to assignment of addresses. 2: All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. |
01/27/2006 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: SANTA RITA HOTEL & CONDO S05-029 Tucson Electric Power Company has reviewed and approved the final plat submitted January 19, 2006. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Mike Kaiser Design/Build - DB 102 Tucson Electric Power Company P. O. Box 711 Tucson, AZ 85702 Please call me at (520) 917-8745, should you have any questions. Liza Castillo Right of Way Agent Land Management Tucson Electric Power Co. (520) 917-8745 lcastillo@tep.com |
02/10/2006 | RICHARD WILLIAMSON | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approv-Cond | Conditioned upon meeting Tucson Water requirements for water service. |
02/13/2006 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Peter McLaughlin Senior Planner FOR: David Rivera Principal Planner PROJECT: The Santa Rita Hotel and Condominums S05-029 Final Plat TRANSMITTAL: February 13, 2006 DUE DATE: February 16, 2006 1. The words "BOOK_________ PAGE_________" must be placed in both the upper and the lower right corners outside the margin line. D.S. 2-03.6.1.G 2. Remove the strikeover of text in the 10th and 11th line of the Acknowledgement Block. 3. Revise the dates in the Acknowledgement Block and Recording Data Block to read "2006". 4. The beneficiary block must read as follows: "The beneficiary of (Title Company Name and Trust Number) is (Name and Address)." DS 2-03.6.3.C 5. A small project location map will be drawn in the upper right hand corner of the first sheet of the final plat at a scale of 3"= 1 mile. Refer to DS 2-03.6.1.D for specifications of the required location map. DS 2-03.6.1.D 6. Add a general note stating: "The total number of condominium units is ____." DS 2-03.6.2.B 7. Provide the following general note: "Total miles of new public streets are____. Total miles of new private streets are____." DS 2-03.6.2.C 8. Tentative plat approval is required prior to final plat approval. DS 2-03.6.2. 9. The minimum text size required is 12 point (.012") for microfilming purposes. Revise the adjacent parcel information and the acreage figures for the east and west parcel in the drawing on sheet 1 of 6 to meet this minimum archiving standard. DS 2-03.6.1.C If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
02/17/2006 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | DATE: February 17, 2006 To: Patricia Gehlen CDRC/Zoning Manager FROM: Loren Makus, EIT Engineering Division SUBJECT: Santa Rita Hotels and Condominium Final Plat S05-029 (First Review) T14S, R13E, Section 13 RESUBMITTAL REQUIRED: Final Plat, The Plat has been reviewed by the Engineering Division and we do not recommend approval at this time. The following review comments must be addressed. Plat 1) Address the abandonment of the existing alley. Comments during review of the Tentative Plat indicate that the alley is to be abandoned. Please clarify the status of the alley. 2) Provide a location map on the first page of the Plat. (DS 2-03.6.1.D) 3) Add the following note on all plats. The purpose of this note is solely for review forcompliance with local and state laws governing subdivision and lot splits. "Therewill be no further division of lots without the expressed approval of the City ofTucson." (DS 2-03.6.2.H) 4) Provide dimensions for each unit. Submit a revised Plat. Include a detailed response letter, detailing how each comment has been addressed. If you have any questions, I can be reached at 791-5550 x1161 or loren.makus@tucsonaz.gov. Loren Makus, EIT Senior Engineering Associate |
02/21/2006 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Denied | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Gary Ault, Mapping Supervisor Pima County Assessor’s Office Mapping Department DATE: February 17, 2006 RE: Assessor’s Review and Comments Regarding Final Plat S05-029 Santa Rita Hotel and Condo T141313 (117-17) * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Plat meets Assessor’s Office requirements. __X____ Plat does not meet Assessor’s Office requirements. COMMENTS: Thank you for your submittal. This plat really seems more like a development plat than a subdivision plat, but if that is how it is to be recorded, our office requires the following additions/corrections. Remove hatching, striping and stippling. There is a line missing on the west side of the plat, by the restaurant. Add the names of the surrounding streets to sheet 2 and add the road information (were they established by map & plat, road maps or docket?). Add bearings and dimensions for the buildings as well as the complete curve data. Add the number of miles of new roads, public or private, to the general notes, even if the number is 0. Are the long dash, double short dash lines the original lot line? If so, it needs to be a lighter line weight. The heaviest line weight should be the perimeter line, with the lot lines being the next heaviest. Add the name(s) of the adjacent subdivision, with map and plat. Add another sheet showing the bearings and dimensions of the condominiums. If there is only one typical style, that can be used instead of adding bearings and dimensions for each unit. If there are any questions, please contact Susan King at 740-4391. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. Susan King |
02/27/2006 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Denied | February 27, 2006 To: E. Bruce Wilson, P.E., Landmark Engineering, Inc. Thru: Patricia Gehlen, CDRC Project Manager City of Tucson Development Services Department ____________________________________ From: Michael J. Harrington, representing the Pima County Departments of Wastewater Management and Environmental Quality Subject: The Santa Rita Hotel and Condominiums Final Plat - 1st Submittal S05-029 The proposed final plat for the above-referenced project has been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. We will send to your office via e-mail, a .pdf file containing a revised Sewer Service Agreement for the proposed number of 148 residential and 66 retail condominium units . Three originals will need to be printed out from this file for notarized signatures by the Owner of Record. The three signed originals of the Agreement must be returned to this office in order to satisfy the necessary requirements needed to approve the Mylars of the final plat. Sheet 1: In the DEDICATION block, 3rd paragraph. Although the City Of Tucson may accept the word PUBLIC, Pima County prefers that you GRANT to CITY OF TUCSON, PIMA COUNTY AND ALL UTILITY COMPANIES… Sheet 1: In the DEDICATION block, 4th paragraph. Although the City Of Tucson may accept that easements are granted to the PUBLIC, Pima County prefers that these elements be GRANTED AS EASEMENTS TO CITY OF TUCSON, PIMA COUNTY AND ALL UTILITY COMPANIES… Sheet 1: Revise the DEDICATION block, 4th paragraph, last sentence, so that: PRIVATE SEWERS are added to the list of responsibilities of THE ASSOCIATION. We will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents. Pima County Code Title 13.20.030.A.2 requires that a wastewater review fee be paid for each submittal of the final plat. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet. The next submittal of this project will be the second (2nd) submittal. A check for the review fee of this submittal in the amount of $50.00 (made out to PIMA COUNTY TREASURER ) must accompany the revised set of bluelines and response letter. If the number of sheets changes, please adjust the review fee accordingly. . If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter CC: Project File |
03/09/2006 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE DEVELOPMENT SERVICES March 9, 2006 E. Bruce Wilson P.E. , R.L.S Landmark Engineering, Inc., 3845 North Business Center Drive, Suite 107 Tucson, AZ 85705 Subject: S05-029 Santa Rita Hotel and Condominium Final Plat Dear Bruce Your submittal of January 19, 2006 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed: ALL BLUELINES MUST BE FOLDED 5 Copies Revised Final Plat (Wastewater, Assesor, Zoning, Engineering, DSD) Should you have any questions, please call me at 791-5608 ext. 1179. Sincerely, Patricia Y. Gehlen CDRC Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 628-1392 |
03/09/2006 | FRODRIG2 | COT NON-DSD | REAL ESTATE | Approved | Real Estate is in the process of vacating the alley right of way and a small portion of Scott Ave. for this subdivision. We are ready to go to Mayor and Council at the same time as the plat. |