Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S05-005
Parcel: Unknown

Review Status: Completed

Review Details: TENTATIVE PLAT REVIEW

Plan Number - S05-005
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/12/2005 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
01/12/2005 JIM EGAN COT NON-DSD FIRE Approved The Tentative Plat is approved January 12, 2005.
01/18/2005 JCLARK3 ENV SVCS REVIEW Approved * No known landfill w/in 1000 feet of this development.
* Approved for curb side APC service. APC's to be placed and removed from the collection area on the day of service.
01/20/2005 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S05-005 TIERRA VISTA PHASE III / TENTATIVE PLAT
DATE: JANUARY 18, 2005



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

1: Delete Tierra Vista Pahse I Bk 56 pg. 38 M & P on pg. 1.

2: Brightview was reserved as two words. Should it be changed to one?

3: Correct resubdivision information on all Title Blocks.
01/20/2005 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved NO COMMENT
S05-005
LANDMARK ENGINEERING, INC
TIERRA VISTA PHRASE III
02/01/2005 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: TIERRA VISTA, PH III
Lots 1-13, 20-53, 339-344
S05-005

Tucson Electric Power Company (TEP) has no objection to the tentative plat
submitted for review dated January 10, 2005.


Liza Castillo
Land Management
Tucson Electric Power Company
lcastillo@tep.com
Office: (520) 917-8745
Cell Phone: (520) 904-2668
Fax: (520) 917-8700
02/07/2005 JOE LINVILLE LANDSCAPE REVIEW Approved
02/08/2005 GLENN HICKS COT NON-DSD PARKS & RECREATION Denied DATE: February 07, 2005

TO: Ferne Rodriguez, Development Services

FROM: Glenn Hicks, Parks and Recreation

SUBJECT: CDRC Transmittal, S05-005 Tierra Vista Phase III: Tentative Plat Review

CC: Craig Gross, Development Services
Joseph Linville


The required 5 ft wide trail connecting the Earp Wash Trail with the sidewalk on Alvernon Road has not been constructed as of 2/7/05.


Glenn Hicks
Parks and Recreation
791-4873 ext. 215
Glenn.Hicks@tucsonaz.gov
02/08/2005 DAN CASTRO ZONING REVIEW Approv-Cond COMMENTS:

The Zoning Review Section approves the tentative plat for this subdivision, subject to the following changes on the executed tentative plat. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised tentative plat to verify that those changes do not affect any zoning requirements.

1.
This project has been assigned subdivision case number S05-005. Please note this case number in the lower right corner of each sheet above the previous case numbers already listed. (D.S. 2-03.2.2.B.1)

2.
Demonstrate compliance with rezoning condition number 34. Written documentation shall be provided.

If you have any questions about this transmittal, please call Dan Castro at (520) 791-5608.
02/08/2005 FRODRIG2 PIMA COUNTY WASTEWATER Denied February 8, 2005

TO: E. Bruce Wilson, P.E.
Landmark Engineering, Inc.

THRU: Craig Gross
City of Tucson, Development Services Department

FROM: Dickie Fernández, E.I.T.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: Tierra Vista Subdivision, Lots 1-383 and Common Areas A & B
Tentative Plat – 1st Submittal
S05-005


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


This project will be tributary to the Roger Road Wastewater Treatment Facility via the Southeast Interceptor. Provide a letter from PCWWM Planning Services, written within the past 90 days, stating that treatment and conveyance system capacity for this project is available. Contact Robert Decker, PCWWM Planning Services, at (520) 740-6625 regarding this matter.

Based on the evaluation of project S02-017, this project would qualify for Participating sewer connection fee rates.

ALL SHEETS. Add the project number, S05-005, to the title block of each sheet. This number should be shown larger or bolder than any cross-reference numbers.

SHEETS 3-5. Pima County Maps & Records show that the sewers for phases I and II are completed. Please differentiate which sewers are proposed and which are existing by using the appropriate line type and labeling the manholes accordingly.

SHEETS 3-5. Show the size and the correct Pima County plan number for all existing public sewers.

SHEETS 3-5. Show the actual existing public sewer line along S Hemisphere Place/Loop.

We will require a revised set of drawings and a response letter addressing each comment. Additional comments may be made during the review of these documents.

The next submittal of this project will be the 2nd submittal. A check for the review fee of this submittal in the amount of $150.00 made out to PIMA COUNTY TREASURER must accompany the revised set of bluelines and response letter.

For any questions regarding the fee schedule, please go to http://www.pimaxpress.com/SubDivision/Documents/Fees.PDF where you may find the appropriate wastewater review fees at the bottom of page 1. If the number of sheets changes, please adjust the review fee accordingly.

If you have any questions regarding the above mentioned comments, please contact me. Sincerely,





Dickie Fernández, E.I.T.
Telephone: (520) 740-6947

Copy: Project
02/08/2005 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Ed Abrigo, Mapping Supervisor
Pima County Assessor’s Office
Mapping Department

DATE: February 8, 2005


RE: Assessor’s Review and Comments Regarding Tentative Plat
S05-005 Tierra Vista Phase III T151409 (140-29)

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor’s Office requirements.
_______ Plat does not meet Assessor’s Office requirements.


COMMENTS: Thank you for your submittal. Please make the following additions/corrections to the final plat.
Remove the shading and hatching.
Add the interior bearings and the complete curve data.
If there area any questions, please contact Susan King at 740-4391.

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.






Susan King
02/11/2005 ELIZABETH EBERBACH ENGINEERING REVIEW Denied TO: Craig Gross; CDRC Coordinator
DATE: February 10, 2004
SUBJECT: Engineering review of the Tierra Vista Phase 3 Tentative Plat
ACTIVITY #: S05-005

SUMMARY: The Tentative Plat, master Drainage Report with addendum cover letter, title report schedule A, Zoning Examiner's report, NPPO plans, and Landscape Development Plans were received by Engineering on January 12, 2005. Development Services Department Engineering Division has done a review of the received items and does not recommend approval for the Tentative Plat at this time. The Drainage Report was reviewed for Tentative Plat purposes only.

TENTATIVE PLAT COMMENTS:
1) City of Tucson Development Standards (DS) Section No. 2-03.2.4.L: Address the following Drainage Report comments:
a) A cover letter may be needed to clarify intent of drainage design as it pertains to Phase III, discussing status of Phase II grading construction.
b) DS Sec.2-03.2.4.L.2: Velocity of south channel at bend near station 12+50 appears to warrant erosion protection. Address in drainage report. Indicate solution on Tentative Plat sheet 5.
c) Some exhibits in the report are cut-off or incomplete; provide copy of Drainage Report with all complete exhibits.
d) For archiving and reference purposes, the case number (S05-005) and administrative addresses have been requested for the covers of drainage reports. Please provide a copy of the final Drainage Report, with the administrative / site address on the front cover, at Final Plat or Grading Plan review stage.
e) If not provided in a drainage report cover letter, the response letter for the Tentative Plat review should indicate status of completion of drainage structures and appurtenant erosion controls located at southwest corner of the project. In response letter address, or reflect on the Tentative Plat, the need for any temporary phase grading, interceptor swales and / or other temporary drainage measures.
2) DS Sec.10-02.2.4.K: Address the following for this phase of Tierra Vista grading development:
a) Clarify grading limits line shown on some planviews and in the legend; remove or explain purpose of the line for this Tentative Plat.
b) DS Sec.10-02.2.4.K: Provide soils report. Include recommendations for minimum distances and slopes for drainage away from foundations, as well as results from infiltration testing.
c) DS Sec.2-03.2.4.M: Provide typical lot grading detail. Address any setbacks per the geotechnical report recommendations and setbacks from basin ponding limits to proposed buildings. Provide copy of geotechnical recommendations.
d) DS Sec.10-02.3.5.1: Response letter should indicate status of completion of all basins for Tierra Vista from Phase 2 grading, (ref: drainage addendum (to the Drainage Report) dated December 30, 2003). Provide copy of percolation tests.
3) DS Sec.2-03.2.3.F: Provide existing elevation contour lines on all sheets with plan views.
4) Explain dashed line running through lots 7 and 31 on sheet 5.
5) DS Sec.2-03.2.3.A: Assure that all benchmark locations, the proposed location of and the method of tie to permanent survey monuments or to the nearest section or quarter section corner, and the proposed location and type of subdivision control monuments are shown. All monuments found or set will be described.
6) DS Sec.2-03.2.3.F: Clarify General Note 12, indicating elevation datum used for both WSE and contour elevations for the plat.
7) DS Sec.2-03.2.3.D: The following information regarding the existing public right-of-ways for Valencia and Alvernon will be provided, besides the names, MS&R right-of-way widths, recordation data. Revise sheets to show and label type and dimensioned widths of paving, curbs, curb cuts, and sidewalks. Label Valencia as Gateway Route.
8) DS Sec.2-03.2.4.F. Show and label future MS&R right-of-way for Valencia and Alvernon.
9) DS Sec.2-03.2.3.H: On sheet 5, show and label location of existing billboard, as referenced in General Note 19 from sheet 1.
10) DS Sec.2-03.2.4.L.4: For reference to future grading and site drainage, clarify channel 1A detail on sheet 8; provide invert elevations and grades for detail B/8.
11) DS Sec.2-03.2.3.G: Label the existing storm drainage facilities on and adjacent to the site, including the structures at the southeast and southwest portions of the site on sheet 5.
12) DS Sec.2-03.2.4.L.6: The proposed 100-year flood limits with water surface elevations for all flows of 100 cfs or more will be drawn on the plat.
13) DS Sec.2-03.2.3.J.1: Where existing natural floodprone areas, such as washes, channels, drainageways, etc., exist within the plat boundaries of the drawing, existing water surface contours for the 100-year flood with water surface elevations indicated must be shown and clearly labeled. Existing floodplain information, including the location of the 100-year flood limits for all flows of 100 cfs or more with 100-year flood water surface elevations, will be indicated on plan view sheets.
14) DS Sec.2-03.2.2.C.2.b: It appears that regulatory floodplain impacts the south area of development for the site. Provide a general note stating that the construction of the south portion of the project will require a floodplain use permit.
15) DS Sec.2-03.2.3.J.3: A symbol identical to that used to represent the water surface contour intervals shown on the plat should be included in the legend.
16) DS Sec.2-03.2.4.J: All proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The south common area "A" shows labels for both common area and drainage easement. Clarify delineations and labeling, as well as differentiating between the common area and other areas, along the south portion of phase III south of lots 25-47. Easement responsibilities for the common area may be different from public or private easements.
17) DS Sec.2-03.2.4.I: Identify and label with square footage of open spaces, drainage areas, and other common areas. Each common area shall be described as to its purpose, i.e. as Open Space, Drainage Maintenance Access Area, Drainage Facilities, Landscape Area, Recreation Area, or combination, etc. Also clarify square footage of common area along south portion of the project.
18) DS Sec.2-03.2.4.C: Clarify common area description information in title block to clarify use of any common area, such that any proposed drainage areas for the retention / detention basins have a letter designation. At a minimum, this will need to be done at Final Plat submittal.
19) DS Sec.2-03.2.4.M: Show all SVT's on plan views.

The next submittal should address all the above items. Submit response letter, revised Drainage Report, revised Landscape Plan, a copy of the W.A.S.H. Report, assurance package, and the revised Tentative Plat. You may schedule a meeting to go over any comments. If you have any questions, please call me at 791-5550 extension 2204.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services Department
02/11/2005 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Denied DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S05-005 Tierra Vista Phase III 02/09/05

(X) Tentative Plat
() Development Plan
(X) Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other

CROSS REFERENCE: C9-01-31 & S02-017 Phase I & II

NEIGHBORHOOD PLAN: None (Under the General Plan)

GATEWAY: Yes

COMMENTS DUE BY: February 8, 2005

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
() Proposal Complies with Annexation or Rezoning Conditions
() RCP Proposal Complies With Plan Policies
(X) See Additional Comments Attached
() No Additional Comments - Complies With Planning Comments Submitted on:
(X) Resubmittal Required:
(X) Tentative Plat
() Development Plan
(X) Landscape Plan
() Other

REVIEWER: msp 791-4505 DATE: February 7, 2005


Urban Planning and Design Comments
Tierra Vista Phase III; Tentative Plat Review
February 7, 2005

Staff offers the following comments:

Please provide documentation that rezoning condition # 34 has been met. Rezoning condition # 34 reads:

Removal of the existing billboard near the southwest corner of the rezoning site, at the time of ordinance adoption for the phase of the subdivision plat which includes the billboard location, in no case later than May 1, 2005.

The legal, non-conforming billboard is located within the phase III boundary.

The proposed landscape plan, as reviewed by City staff, including the proposed planting schedule becomes the landscape requirements for the development at the time the tentative plat/landscape plan approval. Therefore, please address the intent of (asterisk) note located on the lower left hand corner of the landscape plan cover sheet, which reads:

** QUANTITIES ARE FOR CITY OF TUCSON USES ONLY. CONTRACTOR SHALL USE A PLANT COUNT DERIVED FROM THE LANDSCAPE PLAN ELEMENTS AND NOT THE PLANT SCHEDULE QUANTITIES.

Please delete this asterisk note, unless this particular note has been reviewed and approved by Development Service landscape review staff. If approved, please provide written documentation of approval from DSD staff.
02/11/2005 FRODRIG2 OTHER AGENCIES PIMA ASSN OF GOVTS Approved Transportation Information for Rezoning,
Subdivision and Development Review Requests
File Number Description Date Reviewed
E
Pima Association of Governments
Transportation Planning Division
177 N. Church Avenue, Suite 405
Tucson, AZ 85701
Phone: (520) 792-1093
Fax: (520) 792-9151
www.pagnet.org
S05-005 Tierra Vista Phase III: Tentative Plat Review 2/8/2005
1. Nearest Existing or Planned Major Street
2. Is improvement planned as part of the 5-Year Transportation Improvement Program
Planned Action:
STREET IDENTIFICATION
3. Existing Daily Volume – Based on Average Daily Traffic
4. Existing Daily Capacity- Level of Service “E”
5. Existing Number of Lanes
9. Estimated Traffic Generation for Proposed Development
(Expressed in Average 24 Hr. Vehicle Trips)
8. Future Number of Lanes
TRANSIT AND BIKEWAYS CONSIDERATIONS
10. Present Bus Service (Route, Frequency, Distance)
11. Existing or Planned Bikeway
Remarks:
Street Number 1 Street Number 2
Year Year
Planned Action:
VOLUME/CAPACITY/TRAFFIC GENERATION CONSIDERATIONS
6. Future Daily Volume - Adopted Plan System Completed
7. Future Daily Capacity - Level of Service “E”
Valencia (Palo Verde to Alvernon)
No 0
32,300
64,140
6
64,140
44,103
6
507
Route 26, 30 minutes, 0 miles
Bike route with striped shoulder
0
0
0
0
0
0
0
02/18/2005 DALE KELCH COT NON-DSD TRAFFIC Denied Traffic Engineering REJECTS this TP:

1. Show and label as to size (ie 20x345) both existing and future SVTs (DS 2-03.2.4.M). SVTs are specifically missing from the following intersections: Valencia/Alvernon, Valencia/Hemisphere, Bright Sun Ave/Brightview Street, Brightview Street/Desert Walk Lane, Brightview Street/Sunrise Valley Drive. There are other intersections that are missing SVTs on sheet 5of9 but they fall within phase II of this TP.



D. Dale Kelch, EIT
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)
dale.kelch@tucsonaz.gov
02/22/2005 ROBERT YOUNG PIMA COUNTY PIMA CTY - DEV REVIEW Passed
02/22/2005 FRODRIG2 COT NON-DSD REAL ESTATE Approved No objection
02/23/2005 CRAIG GROSS ZONING-DECISION LETTER REVIEW Completed