Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: S04-183
Parcel: Unknown

Address: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S04-183
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/25/2005 MARILYN KALTHOFF START PLANS SUBMITTED Completed
06/01/2005 PETER MCLAUGHLIN ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: Peter McLaughlin
Senior Planner

FOR: David Rivera
Principal Planner

PROJECT:
La Paloma Charter School
S04-183
Final Plat

TRANSMITTAL: June 1, 2005
DUE DATE: June 9, 2005


The Zoning Review Section at the Development Services Department approves the final plat for this subdivision. Should there be any changes requested by other CDRC members, however, the approval is void, and we request copies of those changes to insure that those changes do not affect zoning requirements.

Please provide the executed final plat for signature, and a memo stating that the members of the CDRC have approved the final plat. When these items are received, along with forty-four half-sized copies of the plat, the final plat will be scheduled for consideration at the next available Mayor and Council meeting.



If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.
06/04/2005 FRODRIG2 PIMA COUNTY WASTEWATER Approv-Cond June 1, 2005

TO: Brett Hurtienne, E.I.T.
Gregor & Grenier Engineering, Inc.

THRU: Patricia Gehlen
City of Tucson, Development Services Department

FROM: Dickie Fernández, E.I.T.
Pima County Development Services Department
Development Review Division (Wastewater)

SUBJECT: La Paloma Charter School, Blocks 1 & 2
Final Plat – 2nd Submittal
S04-183


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


A private Sewer Service Agreement for the proposed number of wastewater fixture unit equivalents has been sent to your office. After three original Sewer Service Agreements have been signed by the Owner of Record, the three originals should be returned to Pima County Wastewater Management in order to satisfy the necessary requirements needed to approve the final plat.

Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Department of Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.



If you have any questions regarding the above mentioned comments, please contact me. Sincerely,





Dickie Fernández, E.I.T.
Telephone: (520) 740-6947

Copy: Project
06/07/2005 LOREN MAKUS ENGINEERING REVIEW Denied DATE: June 7, 2005

To: Craig Gross
Planning Administrator
FROM: Loren Makus, EIT
Engineering Division

SUBJECT: La Paloma Charter School
Final Plat S04-183 (Second Review)
T14S, R15E, Section 06

RESUBMITTAL REQUIRED: Final Plat,

The Final Plat has been reviewed by the Engineering Division and we do not recommend approval at this time. The following review comments must be addressed.
1. Show both retention/detention areas in a surveyable and readily retraceable manner. The retention area in block two has distances and bearings but it is not clear how it is tied to the parcel boundaries. Provide tie and distance and bearing data for the basin in Block 1. (DS 2-03.6.4.I)
2. Show a clear tie for the floodplain limit lines.
3. Clarify the purpose of the line along the Southern boundary between the floodplain line and the erosion hazard setback line. If the line identifies an easement provide recordation information and provide survey information for the line.

Submit a revised Final Plat. Include a detailed response letter, detailing how each comment has been addressed.
If you have any questions, I can be reached at 791-5550 x1161 or loren.makus@tucsonaz.gov.

Loren Makus, EIT
Senior Engineering Associate
06/08/2005 CRAIG GROSS ZONING-DECISION LETTER REVIEW Completed