Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TENTATIVE PLAT REVIEW
Plan Number - S04-115
Review Name: RESUBMITTAL - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/29/2004 | MARILYN KALTHOFF | START | PLANS SUBMITTED | Completed | |
12/02/2004 | JCLARK3 | ENV SVCS | REVIEW | Approved | * Consideration should be given for the enclosure to be designed to accomodate a roll-out metal dumpster for recycling. (Cannot depend that 90 gallon APC's will be available for service in the future.) |
12/03/2004 | JOE LINVILLE | LANDSCAPE | REVIEW | Approv-Cond | 1) Approval of the SCZ plan is required prior to tentative plat approval. LUC 2.8 2) Revise the landscape plan to comply with DS 2-06.3.4.C.2. Additional landscape border plantings are required along the Meadow Willow Trail frontage to meet the 50% coverage requirement. LUC 3.7.2.4.A.5 3) Submit plans for the Houghton Greenway per City of Tucson Parks and Recreation Department Standards. |
12/06/2004 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Approved | DEPARTMENT OF URBAN PLANNING & DESIGN Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT S04-115 Ace Commons 12/06/04 () Tentative Plat () Development Plan () Landscape Plan ( ) Revised Plan/Plat ( ) Board of Adjustment () Other NPPO CROSS REFERENCE: Houghton Road Corridor Study NEIGHBORHOOD PLAN: Esmond Station Area Plan GATEWAY/SCENIC ROUTE: Houghton Road (scenic) COMMENTS DUE BY: December 15, 2004 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: () No Annexation or Rezoning Conditions, Not an RCP - No Comment ( ) Proposal Complies with Annexation or Rezoning Conditions ( ) RCP Proposal Complies With Plan Policies ( ) See Additional Comments Attached ( ) No Additional Comments - Complies With Planning Comments Submitted on: () Resubmittal is Not Required. REVIEWER: K. Aragonez 791-4505 DATE: 12/3/2004 |
12/08/2004 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approv-Cond | December 7, 2004 TO: Kent Delph, P.E. Delph Engineering, Inc. THRU: Craig Gross City of Tucson, Development Services Department FROM: Dickie Fernández, E.I.T. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: ACE Commons, Lots 1-5 and Common Area A Tentative Plat – 2nd Submittal S04-115 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. Provide the capacity letter requested by Tim Rowe on September 24, 2004. SHEET 2. According to keynotes 8 and 8A, the sewer within the property is public, however this does not match Pima County records. Please revise design and show clearly which sewers are existing public, which sewers are existing private and which sewers are proposed private. SHEETS 1 & 2. The symbol used in the legend for existing sewer manholes is not followed in Sheet 2. Please revise appropriately. SHEET 2. The sewer line makes a turn to the west next to ACE Hardware, however there is no manhole or cleanout at that turn location according to the layout. The as-built was not attached with this submittal, thus it is not possible to confirm this section. Please verify that the sewer line running south-north along ACE Hardware is existing. Current Pima County records do not indicate so. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the tentative plat. The required revision(s) may be shown on the Mylars. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Department of Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me. Sincerely, Dickie Fernández, E.I.T. Telephone: (520) 740-6947 Copy: Project |
12/08/2004 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approv-Cond | April 21, 2005 To: Kent Delph, Delph Engineering, Inc. Thru: Craig Gross, CDRC Manager City of Tucson Development Services Department ____________________________________ From: Tim Rowe, P.E. (520-740-6563) representing the Pima County Departments of Wastewater Management and Environmental Quality Subject: Ace Commons, Lots 1-5 And Common Area A Revision to Approved Tentative Plat – 1st Submittal S04-115 The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the revised tentative plat as submitted. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter. |
12/10/2004 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | DATE: 10 September 2004 To: Craig Gross Planning Administrator FROM: Loren Makus, EIT Engineering Division SUBJECT: Ace Commons Tentative Plat S04-115 (Second Review) T15S, R15E, Section 13 RESUBMITTAL REQUIRED: Tentative Plat, Drainage Report The Tentative Plat (TP) and Drainage Report (DR) have been reviewed by the Engineering Division and we do not recommend approval at this time. The following review comments must be addressed. Tentative Plat Comments: 1. The Tentative Plat cannot be approved until the Scenic Corridor Zone review has been completed and approved. If necessary revise the Tentative Plat to meet any additional requirements of the SCZ. 2. Revised the Tentative Plat to remove the proposed retaining wall at the edge of the parking area. LUC 3.5.7.2 E. Drainage Report Comments: 3. The Drainage Report is accepted and approved for Tentative Plat purposes. Final Plat Comments: 4. The CC&Rs must be revised to provide for the maintenance of the basin in accordance with Development Standard 10-02.14.3 (Standards Manual for Drainage Design and Floodplain Management in Tucson, Arizona, Page 14.03). A Stormwater Pollution Prevention Plan will be required when the Grading Permit is issued. Submit a revised TP, and a revised DR. Include a detailed response letter, detailing how each comment has been addressed. If you have any questions, I can be reached at 791-5550 x1161 or loren.makus@tucsonaz.gov. Loren Makus, EIT Senior Engineering Associate |
12/10/2004 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: ACE COMMONS Lots 1-5 & Common Area "A" S04-115 Tucson Electric Power Company has reviewed and approved the development plan dated November 24, 2004. Please submit a final set of plans including electrical load plans, to determine how TEP will serve this commercial development. If easements are required, they will be secured by separate instrument. Liza Castillo Land Management Tucson Electric Power Company lcastillo@tep.com Office: (520) 917-8745 Cell Phone: (520) 904-2668 Fax: (520) 917-8700 |
12/10/2004 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | all corrections have been made. |
12/12/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Peter McLaughlin Senior Planner FOR: Patricia Gehlen Principal Planner PROJECT: Ace Commons S04-115 Tentative Plat TRANSMITTAL: December 12, 2004 DUE DATE: December 15, 2004 1. The Scenic Corridor Zone (SCZ) application for case #SCZ 04-08 must be approved prior to tentative plat approval. Include the SCZ case number, date of approval, approved colors and conditions in the general notes. LUC 2.8.2 DS 2-03.2.2.B.6 2. Add the proposed building heights for all buildings to general note 11. DS 2-03.2.4.M If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
12/12/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | all corrections have been made. |
12/15/2004 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed | |
12/15/2004 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | KAY MARKS Addressing Official PH: 740-6480 FAX#: 740-6370 TO: City Planning FROM: Kay Marks, Addressing Official Subject: S04-115 Ace Commons/Revised Tentative Plat Date: November 30, 2004 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County's Geographic Information System. Your support is greatly appreciated.*** |
12/15/2004 | DALE KELCH | COT NON-DSD | TRAFFIC | Approved | Traffic Engineering recommends APPROVAL of this TP. D. Dale Kelch, EIT Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
12/15/2004 | GLENN HICKS | COT NON-DSD | PARKS & RECREATION | Approved | DATE: December 14, 2004 TO: Ferne Rodriguez, Development Services FROM: Glenn Hicks, Parks and Recreation SUBJECT: CDRC Transmittal, S04-115 Ace Commons: Tentative Plat CC: Craig Gross Jim Vogelsburg Andy Dinauer Steve Tineo Parks and Recreation will not deny the tentative plat nor require construction of the Houghton Greenway as a condition. Note to Development Services and Engineering: Prior to Parks and Recreation receiving this tentative plat for review, a paved path and landscaping were constructed in the Houghton Road right-of-way as part of a private improvement agreement(Contract No. 2004-23) approved by the DOT Engineering Division. Parks and Recreation was unaware of the improvement agreement and did not review any related plans. The paved path and landscaping that were constructed do not meet the City/County Divided Urban Pathway Standard for the Houghton Greenway. Glenn Hicks Parks and Recreation 791-4873 ext. 215 Glenn.Hicks@tucsonaz.gov |