Plan Number: S04-115
Parcel: Unknown

Review Status: Completed

Review Details: TENTATIVE PLAT REVIEW

Plan Number - S04-115
Review Name: TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/26/2004 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
08/27/2004 JIM EGAN COT NON-DSD FIRE Approved The Tentative Plat is approved August 27, 2004.
08/31/2004 JOE LINVILLE LANDSCAPE REVIEW Denied Landscape Section Review 8/31/04

1) Revise the Tentative plat notes to eliminate references to RCP. The term does not apply.

2) Revise the tentative plat to eliminate disturbance of the scenic route buffer area. Per LUC 2.8.2.4. "A buffer area thirty (30) feet wide, adjacent to the MS&R right-of-way line, is to be preserved and maintained in its natural state."

3) A revised native plant preservation plan is required for the entire site. The previously approved plan included lots 1-5. The site is still subject to the minimum requirements based on the original inventory.

4) Revise the landscape and native plant preservation plans to include limits of grading. DS 2-15..3.4.A.1, DS 2-07.2.2.B.

5) Revise the plans to provide landscaping per DS 2-06.7.0 which states "Within the required buffer area, indigenous plant material is to remain. If any disturbance occurs during construction or prior to permit application, the buffer area is to be revegetated with native plants indigenous to the site and the area reconstructed to look as natural as possible". Identify existing vegetation to remain per
DS 2-07.2.2.A.1.e. and show any additions required to restore the buffer.

6) Revise the landscape plan to provide canopy trees in conformance with LUC 3.7.2.3.A.1.

7) Revise the plans to meet the sight visiblity standards of DS 3-01.5.0. Large shrubs should be removed from sight visibility triangles.

8) Include references to previous reviews and the current case number to the lower right corner of all plans.

9) Provide screening for the site per LUC Table 3.7.2-I.

10) This project is subject to the provisions of the Scenic Corridor Zone. The review procedure for such projects has changed recently. Refer to TCC 23A-50 and TCC 23A-51 for information. (Ord. 9967, eff. 7/01/04) A pre-application conference is required. LUC 2.8.2

RESUBMITTAL OF ALL PLANS IS REQUIRED. A PRE-APPLICATION CONFERENCE, NEIGHBORHOOD MEETING, PUBLIC NOTICE, AND SCZ PLAN APPROVAL IS REQUIRED PRIOR TO TENTATIVE PLAT APPROVAL.
08/31/2004 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S04-115 ACE COMMONS / TENTATIVE PLAT
DATE: AUGUST 27, 2004



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

1: Change Section 13 to 24 under Site Location Map and all Title Blocks.

2: Correct Sections on Site Location Map.

3: Change all Desert Willow Estate to Estates on Site Location Map.

4: Change Desert Willow 1-113 to 1-110 on Site Location Map.

5: Delete 7451 S. Houghton Road on all Title Blocks.
09/02/2004 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved NO COMMENT
S04-115
DELPH ENGINEERING INC.
ACE COMMONS
09/07/2004 JCLARK3 ENV SVCS REVIEW Denied * No known landfill w/in 1000 feet of this development.
* Location of sigle enclosure can be serviced.
* No provisions shown for recycling. (If either building in Lot 2 is a reaturant a recycling container is recommended alon with a storage area for a grease container storage area.
* No detail of the enclosure submitted with the plans.
* RECOMMEND: The three parking spaces next to the enclosure be turned 90 degrees. This would allow the enclosure to be a double enclosure and there could be two more parking spaces provided.
09/10/2004 LOREN MAKUS ENGINEERING REVIEW Denied DATE: 10 September 2004

To: Craig Gross
Planning Administrator
FROM: Loren Makus, EIT
Engineering Division


SUBJECT: Ace Commons
Tentative Plat S04-115 (First Review)
T15S, R15E, Section 13

RESUBMITTAL REQUIRED: Tentative Plat, Drainage Report

The Tentative Plat (TP) and Drainage Report (DR) have been reviewed by the Engineering Division and we do not recommend approval at this time. The following review comments must be addressed.

Tentative Plat Comments:
1. The plan shows significant grading in the .30-foot "Natural Buffer." Revise the plan so that the Natural Buffer remains undisturbed.
2. Indicate the recordation information for any joint access easements. (DS 2-03.2.4.F)
3. Provide separate common areas and common area designations for the joint access area and the detention basin. In the title block, indicate that the common area containing the basin is a basin.
4. Key Notes 22, 23, and 24 are not used on the plan. Show the location of the CMPAs, and the SVTs as described in the notes.
5. Show locations and dimenstions for pedestrian access routes. Show that all pedestrian routes will be at least 4 feet wide. Where parking areas are adjacent to the sidewalk, the vehicle overhang area must be added to the sidewalk width.
6. Clearly indicate that curb and sidewalk will be provided along Meadow Willow Trail.
7. Show enough existing grades on and off site to clarify that the drainage scheme will work. Show existing grades within Meadow Willow Trail and demonstrate that the proposed drainage channel will accept all of the cross street drainage. (It appears that, as constructed, Meadow Willow Trail has an area subject to ponding. Show that all street drainage will be able to get to the proposed channel. There may be corrective measures taken on the roadway by the developers of Desert Willow Estates. The corrective measures can be taken into account for this site design.)
8. Show how the entrance PAAL will provide all-weather access and how the Pedestrian route will be kept flood-free for up to a 10-year event.
Drainage Report Comments:
9. Show enough existing grades on and off site to clarify that the drainage scheme will work. Show existing grades within Meadow Willow Trail and demonstrate that the proposed drainage channel will accept all of the cross street drainage.
10. Clearly indicate on the drainage exhibit the destination of the discharges from this site.
11. Show how pedestrian access routes will be kept flood-free for up to a 10-year event.

1.

A Stormwater Pollution Prevention Plan will be required when the Grading Permit is issued. Submit a revised TP, and a revised DR. Include a detailed response letter, detailing how each comment has been addressed.
If you have any questions, I can be reached at 791-5550 x1161 or loren.makus@tucsonaz.gov.

Loren Makus, EIT
Senior Engineering Associate
09/10/2004 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Denied SUBJECT: ACE COMMONS
Lots 1-5, & Common Area "A"
S04-115

Tucson Electric Power Company (TEP) has reviewed the tentative plat dated August 18, 2004. This Company is unable to approve the plat at this time. There are existing electrical facilities within the boundaries of the development. The facilities along with the correct easement recording information must be shown on the plat prior to approval. There is a recorded easement, recorded in Docket 12082 at Page 19706.

A copy of a TEP facilities map is enclosed showing the approximate location of the existing facilities. All relocation costs will be billable to the developer.

TEP is in the process of completing the preliminary electrical design for this project. Should you have any questions, please contact me at (520) 917-8745.



Liza Castillo
Land Management
Tucson Electric Power Company
lcastillo@tep.com
Office: (520) 917-8745
Cell Phone: (520) 904-2668
Fax: (520) 917-8700
09/13/2004 ROGER HOWLETT COT NON-DSD COMMUNITY PLANNING Denied DEPARTMENT OF URBAN PLANNING & DESIGN

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT

S04-115 Ace Commons 09/13/04

() Tentative Plat
() Development Plan
() Landscape Plan
( ) Revised Plan/Plat
( ) Board of Adjustment
() Other NPPO

CROSS REFERENCE: Houghton Road Corridor Study

NEIGHBORHOOD PLAN: Esmond Station Area Plan

GATEWAY/SCENIC ROUTE: Houghton Road (scenic)

COMMENTS DUE BY: September 22, 2004

SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:

() No Annexation or Rezoning Conditions, Not an RCP - No Comment
( ) Proposal Complies with Annexation or Rezoning Conditions
( ) RCP Proposal Complies With Plan Policies
() See Additional Comments Attached
( ) No Additional Comments - Complies With Planning Comments Submitted on:
( ) Resubmittal is Not Required. Comment 1 may be reviewed by DSD, comment 2 is provided as informational and should be verified by the Department of Transportation:


REVIEWER: K. Aragonez 791-4505 DATE: 9/8/2004

Please correct the site location map to reflect the correct Township, Range, and Section (sec. 24) that the project is located in.
The following information is supplied to the applicant. The recent Houghton Road Corridor Study may restrict access to this project. Please check with the Traffic Engineer to verify what requirements are to be met.


Houghton Road Corridor Study

Houghton Road – Golf links Road to I-10

Houghton Road south of Golf Links Road is largely undeveloped or developed by large lot properties with limited access. In addition to the recommended features in Table 16 the following actions are recommended:
Establish and apply supporting roadway network
Implement hierarchical roadway network as outlined in the Houghton Area Master Plan.
Restrict access through review processes and rezoning cases
Use Policies to control and restrict future access directly onto Houghton Road
Use temporary interim solutions to accommodate future restrictions to Houghton Road access
Install raised medians
Maintain median openings at a minimum of 660 feet
Maintain traffic signal spacing of one mile
09/17/2004 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

RICK LYONS
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Ed Abrigo, Mapping Supervisor
Pima County Assessor’s Office
Mapping Department

DATE: September 16, 2004


RE: Assessor’s Review and Comments Regarding Tentative Plat
S04-115 Ace Commons T151513 (141-17)

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor’s Office requirements.
_______ Plat does not meet Assessor’s Office requirements.


COMMENTS: Thank you for your submittal. Please make the following additions/corrections in the final plat.
Remove all stripping and hatching.
Remove the building footprints or dash the lines; same with the parking areas. The solid lines indicate another parcel.
Add the road information for Houghton Road.
If there are any questions, please contact Susan King at 740-4391.

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.






Susan King
09/23/2004 PETER MCLAUGHLIN ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: Peter McLaughlin
Senior Planner

FOR: Patricia Gehlen
Principal Planner

PROJECT:
Ace Commons
S04-115
Tentative Plat

TRANSMITTAL: September 23, 2004

DUE DATE: September 23, 2004


1. An applicant has one (1) year from the date of application to obtain approval of a tentative plat that complies with zoning and other development requirements in effect at the time of application. This tentative plat must be approved on or before August 25, 2005.
LUC 4.1.7.1

2. Fill in the S03-115 number near the title block in the lower right hand corner of all sheets of the plat, landscape and NPPO plans. Also, place the SCZ case number (refer to comment 3), on each sheet of the site plan, landscape plan and NPPO plans in the lower right hand corner near the title block. Place any other reference case numbers, such as the annexation case number (C9-84-84) in the lower right hand corner near the title block. Add a general note stating that this subdivision is subject to Ordinance No. 6143 which established zoning in the Rita Ranch Annexation Area. List the conditions of annexation as a general note.
DS 2-03.2.2.B.1, .B.7 & .B.9

3. This project area is within the 400-foot Scenic Corridor for Houghton Road. A Scenic Corridor Zone (SCZ) application must be approved prior to development plan approval. Include the SCZ case number, date of approval, approved colors and conditions in the general notes.
LUC 2.8.2
DS 2-03.2.2.B.6

4. Label and dimension the 400' Scenic Corridor line on the drawing.
LUC 2.8.2.3

5. The project location map must be revised to reference recorded subdivisions by book and page numbers rather than lot numbers. Enlarge the text of the recorded subdivision to be a minimum of 12 point (0.12") for archiving /microfilming purposes.
DS 2-03.2.1.D.2
DS 2-03.2.1.C

6. Correct the legal description in the title block and the location map to read that the site is a part of the northwest quarter of section 24-15-15 rather than 13-15-15. DS 2-03.2.1.D.3 & .G.3

7. Remove the heading called "Density" under the calculations as these are not density calculations.

8. Show and dimension the existing and future sight visibility triangles (SVTs) at the intersection of Houghton Road with Meadow Willow Trail and at the access drive location along Houghton Road. The SVTs are not drawn correctly at the easternmost access drive to lot 5 along Meadow Willow Trail. Revise SVTs. Key notes 22, 23 and 24 are not used on the drawing. Use these keynotes to show SVT locations.
DS 2-03.2.4.M

9. Continuous pedestrian circulation must provide connections between all buildings and to the adjacent right-of-way along Houghton Road and Meadow Willow Trail. Revise to show continuous pedestrian circulation. The proposed pedestrian sidewalk in the northeast corner of lot 2 is truncated and does not continue to make a connection to anything. Clearly dimension the pedestrian circulation system.
DS 2-08.5.1.A

10. Cross access agreements must be recorded between the lots. Provide a copy of the recorded agreement and add the docket and page of recordation to the plat.

11. Add the existing/proposed building heights for all buildings. The proposed building heights for Lot 2 have been omitted from general note 11. Provide elevation drawings of proposed buildings. Setbacks cannot be verified until building heights are shown. DS 2-03.2.4.M

12. Dimension the width of all entrance drives and PAALS.

13. Revise the street perimeter yard setback provided as listed in the "Typical Setbacks" table to be consistent with the drawing. The setback table states "30 feet provided" for Lot 2 but the drawing shows more than 30 feet from the west property line. Dimension the building setbacks on the drawing. LUC 3.2.6.4

14. Provide a Floor Area Ratio (FAR) calculation for each of the proposed lots. LUC 3.2.11

15. Between any building and a PAAL a 5-foot pedestrian refuge with a minimum 4-foot sidewalk is required. Revise plan to show a pedestrian refuge along the north side of the proposed easternmost building located on lot 2. DS 3-05.2.2.B.1

16. Correct the wheel stop dimension in detail 3/3 on sheet 1/2 to read "2-½" feet rather than "2 feet" from front of parking space.
DS 3-05.2.3.C.2

17. A copy of proposed CC&R's must be provided to the Zoning Review Section for review and approval prior to approval of the final plat. The CC&R's must meet the criteria of DS 2-03.6.6.
DS 2-03.6.6

18. All requested revisions must be made to tentative plat, landscape & NPPO plans.
DS 2-07.2.1.A


If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.
09/30/2004 CRAIG GROSS ZONING-DECISION LETTER REVIEW Completed
09/30/2004 CRAIG GROSS OTHER AGENCIES PIMA ASSN OF GOVTS Approved no comments
09/30/2004 GLENN HICKS COT NON-DSD PARKS & RECREATION Denied DATE: September 30, 2004

TO: Ferne Rodriguez, Development Services

FROM: Glenn Hicks, Parks and Recreation

SUBJECT: CDRC Transmittal, S04-115 Ace Commons: Tentative Plat

CC: Craig Gross, Development Services


Denied.

The proposed plans as submitted omit the Houghton Greenway. The segment of the Greenway that corresponds with the western (Houghton) edge of the subject project needs to be properly integrated into the plans, and constructed by the developer. The existing paved path and landscaping on Houghton Rd does not meet the City/County Divided Urban Pathway Standard for the Houghton Greenway.

The Houghton Greenway shall be constructed to the City/County Divided Urban Pathway Standard, which includes a minimum 12' paved path (construction standard is 2" of asphalt over 4" of compacted AB). The paved path shall be located directly adjacent to the eastern boundary of the future right of way. The entire greenway corridor shall be naturally landscaped with native plants and include irrigation. Decomposed granite shall not be used as a ground cover within the greenway without the approval of the Parks and Recreation Department. Shade trees shall be installed a minimum of every 30 ft along the paths. A public non-motorized trail easement that coincides with the scenic corridor landscape buffer shall be dedicated. Greenway details are available from the Parks and Recreation Department.



Glenn Hicks
Parks and Recreation
791-4873 ext. 215
Glenn.Hicks@tucsonaz.gov
09/30/2004 CRAIG GROSS PIMA COUNTY WASTEWATER Denied September 24, 2004

TO: Kent Delph, P.E., Delph Engineering, Inc.

THRU:


FROM: ____________________________________
representing the Pima County
Departments of Wastewater Management and Environmental Quality

SUBJECT: Ace Commons, Lots 1-5 & Common Area A
- Submittal
S04-115


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


This project will be tributary to the Roger Road Wastewater Treatment Facility via the Southeast Interceptor. Obtain a letter from the PCWMD Planning Services, written within the past 90 days, stating that treatment and conveyance system capacity for the project is available, and provide a copy of that letter to this office. PCWWM Planning Services may be contacted regarding this matter at 520-740-6500,

The development plan / tentative plat for this project cannot be approved until a copy of this letter has been received by this office.

The owner this property built approximately 675' of qualifying off-site public sewer line under sewer plan number, G-2003-076, that will cause all five of these lots qualify for the Participating sewer connection fee rate.

All Sheets: Add the development plan / tentative plat case number, S04-115, to the title block of each sheet. This number should be shown larger or bolder than any cross reference numbers. No wastewater review fees will be charged for sheets where this is the only required revision.

Sheet 1: Revise Wastewater Note 4 to read:

THE ON-SITE SANITARY SEWERS WILL BE PRIVATE AND WILL BE CONSTRUCTED, OPERATED AND MAINTAINED ON A PRIVATE BASIS, AND IN ACCORDANCE WITH AN APPROVED OPERATION AND MAINTENANCE PLAN, IF REQUIRED. THE LOCATION AND METHOD OF CONNECTION TO AN EXISTING PUBLIC SANITARY SEWER IS SUBJECT TO REVIEW AND APPROVAL BY THE PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT.

Sheet 1: Add a Wastewater Note that states:

A PROPERTY OWNERS' ASSOCIATION WILL BE FORMED TO ACCEPT RESPONSIBILITY AND LIABILITY FOR CONSTRUCTION, MAINTENANCE, OPERATION AND CONTROL OF ALL PRIVATE SEWERS.

If no property owners' association will be formed to care for the common elements of this subdivision, please contact me for further direction.

Sheet 2: The symbol for Keynote 8 (which references the private portion of G-2003-076) is pointing to a section of G-2003-076 that I believe is public. This office doesn't have a copy of the sewer plan available at this time, however, so I was unable to confirm this. Please provide a copy of the as-built drawings for G-2003-076 with the next submittal for our use, and revise the tentative plat / advise this office as necessary.

Sheet 2: Is the 8" private sewer line that runs from the manhole at the southwest corner of the detention basin east to the northwest corner of the ACE Hardware Building, and then south to Lot 5, existing or proposed? Show the new private sewers differently than the existing private sewers, so that they can be readily told apart.

Sheet 2: Show the design data for any new 6" or 8" private sewer lines

Sheet 2: Clarify the location of the Building Connection Sewer (BCS) line(s) for the ACE Hardware. Two BCS lines appear to have been shown to this building, one near the northwest corner of the building and one near the southwest corner of this building. The one near the southwest corner of the building appears to connect to a contour line, rather than the building, however. Revise / advise as necessary.

Sheet 2: Label the BCS lines from the ACE Hardware with their size and the letters, BCS.

Sheet 2: Sewer service needs to be provided to Lots 3, 4 & 5.

Until the requested information about the existing sewers is provided, no additional comments can be made.

We will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents.

County Ordinance 2003-29 went into effect on April 11, 2003. This ordinance requires that a wastewater review fee be paid for each submittal of the development plan / tentative plat. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet.

The next submittal of this project will be the second (2nd) submittal. A check for the review fee of this submittal in the amount of $100.00 (made out to PIMA COUNTY TREASURER ) must accompany the revised set of bluelines and response letter.

If the number of sheets changes, please adjust the review fee accordingly.


If you wish to discuss the above comments, please contact me at the phone number provided above, under my signature.

Copy: Project
09/30/2004 DOROTHY ROBLES COT NON-DSD REAL ESTATE Approved no objections.
09/30/2004 DALE KELCH COT NON-DSD TRAFFIC Denied Traffic Engineering REJECTS this TP:

1. Add a general note to read "Lots 2, 3, 4 shall not be allowed direct access to Houghton Road."

2. Show and label as to size (ie 20x345) both existing and future SVTs (DS 2-03.2.4.M). There is no future SVT at the access point from Houghton. None of the depicted SVTs are labeled by size. The keynotes 23, 24 are in the legend but not used on the plan. Show the SVTs (existing and future) at the intersection of Houghton Road and Meadow Willow Trail.

D. Dale Kelch, EIT
Senior Engineering Associate
Traffic Engineering Division
(520)791-4259x305
(520)791-5526 (fax)