Plan Number: S04-107
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S04-107
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/24/2005 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
08/29/2005 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S04-107 EL RANCHO MERLITA/REVISED FINAL PLAT
DATE: August 29, 2005



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.




***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through the Pima
County Subdivision Coordinator. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***














jg
09/06/2005 GLYNDA ROTHWELL UTILITIES TUCSON ELECTRIC POWER Denied SUBJECT: EL RANCHO MERLITA
Lots 1-16
S04-107

Tucson Electric Power Company (TEP) has reviewed the final plat submitted
August 24, 2005. TEP is unable to approve the plat at this time.

In order for this Company to approve the final plat, the following will be
required.

* A 10' x 10' TEP easement is required at the junction cabinet located
north of Lot 16.
* There are two 10' wide easements required on Lot 13 for the
underground primary, one is necessary along the northern boundary and also
at the southeasterly end of lot.
* Delete the word FOR from the 3rd paragraph of the dedication to read
as: WE HEREBY GRANT TO THE PUBLIC AND ALL UTILITY COMPANIES ALL EASEMENTS
AS SHOWN HEREON FOR THE PURPOSES OF ACCESS, INSTALLATION AND MAINTENENACE OF
PUBLIC SEWERES AND UTILITIES ASN OTHER USES AS DESIGNATED BY THIS PLAT.

Show all requested easements on the resubmittal of the final plat. Submit
two bluelines to the City of Tucson for TEP's final approval.


Liza Castillo
Right of Way Agent
Land Management
Tucson Electric Power Co.
(520) 917-8745
lcastillo@tep.com <mailto:lcastillo@tep.com>
09/08/2005 PAUL MACHADO ENGINEERING REVIEW Denied To: Steve Hill, P.E. DATE: September 8, 2005
Lodestar Engineering Co. LLC.
1010 N. Finance Center Drive
Tucson, Arizona 85710

SUBJECT: El Rancho Merlita, 8520 E. Wrightstown Rd.
Final Plat S04-107 (Second Review)
T14S, R15E, Section 04

RESUBMITTAL REQUIRED: Final plat.

The Final plat (FP) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Final Plat:

1. Please include a response letter to the comments along with the corrected copies with re-submittal.
2. Please re-label all common areas that may be used in a dual and/or single use capacity. For example, a Ret./Det. Basin may also be used as a recreation facility or only as a drainage facility and this must be reflected on the Final Plat. A key note explaining the labels will be sufficient, ie.:
Common Area "A" - Streets
Common Area "B" - Drainage/Recreation Facilities
Common Area "C" - Recreation Facilities
Common Area "D" - Drainage Facilities
Common Area "E" - Landscaping
All areas must be individually labeled. Per previous comment.
3. Per note no. 11, show the EHS on the plat per D.S. 2-03.6.4.E. If the EHS is not shown on the plat, then revise the note. Per previous comment.
4. Please label the point of curvature and the point of tangency on Wrightstown Road leading to the subdivision corner tie as "found" or "set" per D.S. 2-03.6.5.4. Per previous comment.
If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 791-5550 x1193 office
(520) 879-8010 fax
C:/8520 E. Wrightstown Rd. FP 2
09/12/2005 DAVID RIVERA ZONING REVIEW Approved CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office

FROM: David Rivera
Principal Planner

PROJECT: S04-107
El Rancho Merlita, Lots 1-16 and Common Areas "A", "B", and "C"
Final Plat

TRANSMITTAL: 09/12/05

DUE DATE: 09/08/05

COMMENTS:

1. The Zoning Review Section approves the final plat for this subdivision, subject to the following changes on the executed final plat. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements.

2. Zoning is not requiring any changes to the final plat but is making a recommendation about possible changes to the tentative plat related to the existing ingress/egress easement over lot 5. I feel that the annotation about the abandonment of the easement be removed from the tentative sheet and new tentative plat sheets be submitted for re-stamps.

I have emailed Patricia Gehlen about the request and will abide by her decision. Please contact Trish about what will be required.


If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

C\planning\cdrc\finaplat\S04107fpca.doc
09/22/2005 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

September 22, 2005

Steve Hill
Loadstar Engineering
1010 Finance Center Drive
Tucson, AZ 85710

Subject: S04-107 El Rancho Merlita Final Plat

Dear Steve:

Your submittal of September 22, 2005, for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

3 Copies Revised Final Plat (engineering, TEP, DSD)



ASSURANCES TO BE SUBMITTED TO THE CDRC OFFICE

Should you have any questions, please call me at 791-5608.

Sincerely,


Patricia Y. Gehlen
CDRC Manager