| 08/11/2004 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 08/12/2004 | JIM EGAN | COT NON-DSD | FIRE | Denied | 1. A minimum 20' wide, paved fire apparatus access roadway must be provided and extended to within 150 ft. of all portions of the exterior walls of proposed structures. An approved turnaround is required for dead-end access roadways. 2. Provide the following General Note on the plan."An additional fire hydrant shall be provided by the Developer in accordance with the Fire Code." |
| 08/18/2004 | JCLARK3 | ENV SVCS | REVIEW | Denied | * No known landfill w/in 100 feet of this project. * Only survey data submitted. * Do not know what to review for refuse enclosures or service. |
| 08/19/2004 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
| 08/27/2004 | GLENN HICKS | COT NON-DSD | PARKS & RECREATION | Approved | DATE: August 25, 2004 TO: Ferne Rodriguez, Development Services FROM: Glenn Hicks, Parks and Recreation SUBJECT: CDRC Transmittal, S04-103 Huntington Park Plaza: Other Subdivision Review CC: Craig Gross, Development Services Staff has no comments. Glenn Hicks Parks and Recreation 791-4873 ext. 215 Glenn.Hicks@tucsonaz.gov |
| 08/27/2004 | ROGER HOWLETT | COT NON-DSD | COMMUNITY PLANNING | Approved | DEPARTMENT OF URBAN PLANNING & DESIGN Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT S04-103 Huntington Park Plaza 08/27/04 () Tentative Plat (XXXX) Development Plan (XXXX) Landscape Plan () Revised Plan/Plat () Board of Adjustment (XXXX) Other – Record of Survey CROSS REFERENCE: D03-0020 & C10-04-01 NEIGHBORHOOD PLAN: Pantano East Area Plan GATEWAY/SCENIC ROUTE: COMMENTS DUE BY: 09/07/04 SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: () No Annexation or Rezoning Conditions, Not an RCP - No Comment (XXXX) Proposal Complies with Annexation or Rezoning Conditions () RCP Proposal Complies With Plan Policies () See Additional Comments Attached () No Additional Comments - Complies With Planning Comments Submitted on: () Resubmittal Required: () Tentative Plat () Development Plan () Landscape Plan () Other REVIEWER: D. Estolano 791-4505 DATE: 08/25/04 |
| 09/02/2004 | FRODRIG2 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Approved | |
| 09/07/2004 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | DATE: September 7, 2004 TO: Craig Gross; CDRC Coordinator SUBJECT: Huntington Park Plaza Record of Survey Engineering Review REVIEWER: Loren Makus ACTIVITY NUMBER: S04-103 SUMMARY: The Record of Survey has been reviewed by Development Services Department Engineering Division. We recommend approval of the Record of Survey at this time. If any other review agency requires a resubmittal of the Record of Survey, the Engineering Division requests a review copy of the revised submittal. If you have any questions call me at 791-5550, extension 1161 or email me at loren.makus@tucsonaz.gov. Loren Makus, E.I.T. Senior Engineering Associate Engineering Division Development Services |
| 09/07/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | TO: Development Services Center Plans Coordination Office FROM: Peter McLaughlin Senior Planner FOR: Patricia Gehlen Principal Planner PROJECT: S04-103 Huntington Park Plaza Record of Survey TRANSMITTAL: September 7, 2004 DUE DATE: September 7, 2004 1. The submitted survey is being reviewed as a Record of Survey. 2. Place the S04-103 Land Survey Exception case number in the lower right hand corner of the plan next to the title block. 3. Based on the lot sizes shown on the drawing and the square footage listed in general note 5, the acreage in general note should be revised to read "0.78 acres". DS 2-03.11 If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. RESUBMITTAL OF THE FOLLOWING ITEMS IS REQUIRED: revised Record of Survey |
| 09/08/2004 | DALE KELCH | COT NON-DSD | TRAFFIC | Approved | Traffic Engineering recommends APPROVAL of this ROS. D. Dale Kelch, EIT Senior Engineering Associate Traffic Engineering Division (520)791-4259x305 (520)791-5526 (fax) dale.kelch@tucsonaz.gov |
| 09/08/2004 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Denied | September 8, 2004 TO: Mark Hanshaw, P.E., Arcadis THRU: FROM: ____________________________________ representing the Pima County Departments of Wastewater Management and Environmental Quality SUBJECT: Huntington Park Plaza - Submittal S04-103 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. This project will be tributary to the Ina Road Water Pollution Control Facility via the Pantano Interceptor. Provide a letter from PCWWM Planning Services, written within the past 90 days, stating that treatment and conveyance system capacity for this project is available. Contact Robert Decker, PCWWM Planning Services, at (520) 740-6625 regarding this matter. Based on the evaluation of project D03-0020, this project would qualify for Non-Participating sewer connection fee rates. ALL SHEETS. Add the project number, S04-103, to the title block of each sheet. This number should be shown larger or bolder than any cross-reference numbers. Add the project reference number D03-0020 to the title block of the cover sheet. If, and only if, the on-site sewers are existing and there are no proposed sewers add the following general note THE ON-SITE SEWERS ARE EXISTING AND PRIVATE. NO NEW SEWERS ARE PROPOSED. If new sewers are proposed, add the following general notes A PROJECT CONSTRUCTION PERMIT MUST BE SECURED FROM PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT BEFORE BEGINNING ANY WORK ON THIS PROJECT. ON-SITE SANITARY SEWERS WILL BE PRIVATE AND WILL BE CONSTRUCTED, OPERATED AND MAINTAINED ON A PRIVATE BASIS. THE LOCATION AND METHOD OF CONNECTION TO AN EXISTING PUBLIC SANITARY SEWER IS SUBJECT TO REVIEW AND APPROVAL BY THE PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT AT THE TIME OF SUBMITTAL OF PLUMBING OR BUILDING PLANS. ANY WASTEWATER DISCHARGED INTO THE PUBLIC SANITARY SEWERAGE SYSTEM SHALL MEET THE REQUIREMENTS OF THE INDUSTRIAL WASTE ORGINANCE (PIMA COUNTY ORDINANCE NO. 1991-140, AS AMENDED). Show all sewers to the point of connection to the public sanitary sewer system. Include size of the on-site sewers as well as the rim and invert elevations for all on-site manholes. Show any existing sewer easements or any sewer easements that will be created. We will require a revised set of bluelines, and a response letter, addressing these comments. Additional comments may be made during the review of these documents. County Ordinance 2003-29 went into effect on April 11, 2003. This ordinance requires that a wastewater review fee be paid for each submittal of the subdivision exception. The fee for the first submittal is $166 plus $50 per sheet. For the second submittal, the review fee is $50 per sheet. For all subsequent submittals, the review fee is $39 per sheet. The next submittal of this project will be the second (2nd) submittal. A check for the review fee of this submittal in the amount of $50.00 (made out to PIMA COUNTY TREASURER ) must accompany the revised set of bluelines and response letter. If the number of sheets changes, please adjust the review fee accordingly. If you wish to discuss the above comments, please contact me at the phone number provided above, under my signature. |
| 09/09/2004 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: HUNTINGTON PARK PLAZA S04-103 Tucson Electric Power Company has reviewed and approved the plan dated August 1, 2004. There are existing facilities north of the lots, they may be in conflict with the off-site improvements. Enclosed is a copy of a TEP facilities maps showing the approximate location of the existing facilities. All costs associated with the relocation of the existing facilities will be billable to the developer. Please submit a final set of plans including electrical load plans, to determine how TEP will serve these commercial lots. If easements are required, they will be secured by separate instrument. Submit your plans a minimum of eight (8) weeks prior to requiring service. Liza Castillo Land Management Tucson Electric Power Company lcastillo@tep.com Office: (520) 917-8745 Cell Phone: (520) 904-2668 Fax: (520) 917-8700 |
| 09/13/2004 | FRODRIG2 | COT NON-DSD | REAL ESTATE | Approved | No Comment |
| 09/13/2004 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Approved | no comments |
| 09/13/2004 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S04-103 HUNTINGTON PARK PLAZA/OTHER SUBDIVISION REVIEW DATE: 9/13/04 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. NOTE: 1. All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** |
| 09/15/2004 | CRAIG GROSS | ZONING-RECORDATION | REVIEW | Passed | |
| 09/15/2004 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed |