Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT REVIEW
Plan Number - S04-083
Review Name: FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/10/2005 | CRAIG GROSS | COT NON-DSD | REAL ESTATE | Approved | no comments/objections. |
01/10/2005 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed | |
01/10/2005 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 RICK LYONS ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Ed Abrigo, Mapping Supervisor Pima County Assessor’s Office Mapping Department DATE: December 30, 2004 RE: Assessor’s Review and Comments Regarding Final Plat S04-083 Bach Property T131436 (110-16) * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor’s Office requirements. _______ Plat does not meet Assessor’s Office requirements. COMMENTS: Thank you for your submittal. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. Susan King |
12/03/2004 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
12/10/2004 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Denied | SUBJECT: BACH PROPERTY Lots 1-20 S04-083 Tucson Electric Power Company (TEP) has reviewed the final plat dated October 20, 2004. TEP is unable to approve the plat at this time. Enclosed is the preliminary electrical design for the subject subdivision. Please review this design and contact this office by December 23, 2004 with any conflicts or desired changes. Your written approval of this design is necessary for a final construction drawing. Any changes requested after we have proceeded with a final construction drawing will be billable. In order for TEP to approve the final plat, the following is required: * Show the easement recording information for the enclosed easement. It was recorded January 7, 1982, Docket 6692 at Page 634-645. A copy of the preliminary design has been forwarded to Southwest Gas. Please insure utility coordination by providing a copy of this preliminary design to Qwest and the Cable Company. Liza Castillo Land Management Tucson Electric Power Company lcastillo@tep.com Office: (520) 917-8745 Cell Phone: (520) 904-2668 Fax: (520) 917-8700 |
12/10/2004 | KAY MARKS | PIMA COUNTY | ADDRESSING | Denied | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S04-083 BACH PROPERTY/FINAL PLAT DATE: December 9, 2004 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval: Change Section 36T to 36 on Location Map. Correct North arrow on pg. 2. Is this interior street a cul-de-sac? If so, Sahuara Place is o.k. jg |
12/20/2004 | DAN CASTRO | ZONING | REVIEW | Approv-Cond | COMMENTS: The Zoning Review Section approves the final plat for this subdivision, subject to the following changes on the executed final plat. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements. 1. Note the subdivision case number S04-083 in the lower right corner of each sheet of the final plat. If you have any questions about this transmittal, please call Dan Castro at (520) 791-5608. |
12/29/2004 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: Douglas Schneider, P.R.L.S.,DATE: December 29, 2004 Rick Engineering Co. 1745 E. River Road Tucson, Arizona 85718 SUBJECT: Bach Property, 2660 N. Sahuara Ave. Final Plat S04-083 (First Review) T13S, R14E, Section 36 RESUBMITTAL REQUIRED: Final plat Assurances. The Final plat (FP) and Assurances cannot be approved as submitted. Please address the following review comments prior to the next submittal. Final Plat: 1. Please include a response letter to the comments along with the corrected copies with re-submittal. 2. Please submit a copy of the subdivision boundary closure sheets. 3. Separate the drainage areas/facilities from the landscape areas and identify each with consecutive corresponding common areas. The title block will have to be modified to reflect these changes, i.e.: Common Area "A" - Streets Common Area "B" - Drainage/Recreation Facilities Common Area "C" - Recreation Facilities Common Area "D" - Drainage Facilities Common Area "E" - Landscaping 4. The SVT's on the plat are not shown correctly. The line adjacent to the longest leg of the SVT, the stem side, is 20 feet long, not 15 feet and the far side line is adjacent to the curb per D.S. 3-01.5.1.B. 5. Designate the corner lots with a star symbol for access. Place the star opposite of the curve radii for each corner lot and at the furthest corner away from the intersection on lot 14 and add to legend per D.S. 2-03.6.4.G. 6. Add the 1' no vehicular access easements for lots 1 and 20 as is shown on lot 3 per D.S. 2-03.6.4.G. 7. Reference the basis of bearings per D.S. 2-03.6.5.C.1. 8. Label all monuments found or set per D.S. 2-03.6.5.C.4. 9. Show the distance and bearings between monuments and indicate whether measured or calculated D.S. 2-03.6.5.C.5. 10. The assurance package must be updated to reflect the changes on common areas. The assurance package must match the plat description exactly. 11. Place the subdivision number (S04-083) on the FP per D.S. 2-03.6.1.K. 12. The parcel of land to the Northwest (Howard Bach) is "unsubdivided" however, by replacing the "unsubdivided" with the parcel number it may be more of an accurate description. If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov Paul P. Machado Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 791-5550 x1193 office (520) 879-8010 fax C:\2660 N. Sahuara Ave FP |
12/29/2004 | MARILYN KALTHOFF | PIMA COUNTY | WASTEWATER | Approv-Cond | December 29, 2004 TO: James King Rick Engineering Company, Inc. THRU: Craig Gross City of Tucson, Development Services Department FROM: Dickie Fernández, E.I.T. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: Bach Property, Lots 1-20 and Common Areas A1-A4 and B1-B3 Final Plat - 1st Submittal S04-083 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. 1. A public Sewer Service Agreement for the proposed number of residential lots is being prepared, however necessary information is missing from the final plat. The owner is being listed as Raul Romero Lopez, however no address is being provided. Please provide an address so that the sewer service agreement can be completed and sent to your office. After three original Sewer Service Agreements have been signed by the Owner of Record, the three originals should be returned to Pima County Wastewater Management in order to satisfy the necessary requirements needed to approve the Mylars of the final plat. 2. SHEET 2. Recently, Pima County has decided not to require public sewer easements through common areas any longer, thus you may delete the public sewer easement within Common Area A4. 3. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Department of Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me. Sincerely, Dickie Fernández, E.I.T. Telephone: (520) 740-6947 Copy: Project |