Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - FINAL PLAT REVIEW
Plan Number - S04-077
Review Name: RESUBMITTAL - FINAL PLAT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/03/2005 | MARILYN KALTHOFF | PIMA COUNTY | WASTEWATER | Approv-Cond | January 3, 2005 TO: Warren D. Thompson Stantec Consulting, Inc. THRU: Craig Gross City of Tucson, Development Services Department FROM: Dickie Fernández, E.I.T. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: Sycamore Park - Village 2, Lots 1-146 and Common Area A Final Plat - 2nd Submittal S04-077 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. 1. A public Sewer Service Agreement for the proposed number of residential lots was e-mailed with the previous wastewater review letter on August 2, 2004. The owner of record shown in this submittal has changed, thus a revised sewer service agreement is being e-mailed with this review letter. After three original Sewer Service Agreements have been signed by the Owner of Record, the three originals should be returned to Pima County Wastewater Management in order to satisfy the necessary requirements needed to approve this final plat. 2. SHEET 4. Common Area A between lots 31 and 32 may remain at 30 feet of width if and only if the sewer is 16 feet deep or less. Should the proposed sewer be 17 feet deep or more, the width of this common area will have to be revised according the PC/COT Standard Details WWM A-3. 3. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Department of Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me. Sincerely, Dickie Fernández, E.I.T. Telephone: (520) 740-6947 Copy: Project |
| 01/04/2005 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approv-Cond | Laith Alshami, 01/04/2005 SUBJECT: Sycamore Park Village 2 S04-077, T15S, R15E, SECTION 32 RECEIVED: Final Plat on December 21, 2004 The subject project has been reviewed. The revised Final Plat is acceptable and it is recommended for approval subject to the following: 1. Submit an approvable complete Assurance Package. 2. Submit revised copies of the CC & R's that specifically address the maintenance of the drainage facilities. Add language in the text, which addresses the maintenance of the drainage structures in details (i.e. what facilities to be inspected and maintained, how, when, by whom, the detention/retention basin maintenance list, keeping records, and repair decisions, etc). Please be advised that this Office recommends including the Detention/Retention maintenance checklist in the CC & R's to allow the Home Owners Association access to it and facilitate their maintenance responsibilities. Prepare a detailed response that explains the revisions that were made and references the exact location in the CC & R's where the revisions were made. Required Items for Resubmittal: Assurances and revised CC & R's |
| 01/05/2005 | DAN CASTRO | ZONING | REVIEW | Approv-Cond | The Zoning Review Section approves the final plat for this subdivision, subject to the following changes on the executed final plat. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements. 1. Provide a copy of the revised CC&R's to verify the following: Under the Recitals block on the cover sheet of the CC&R's please correct the number of lots listed for Village 2. The CC&R's submitted with the tentative plat, incorrectly lists Village 2 as Lots 1-75. Correct number is lots 1-146. If you have any questions about this transmittal, please call Dan Castro at (520) 791-5608. |
| 01/05/2005 | GLYNDA ROTHWELL | UTILITIES | TUCSON ELECTRIC POWER | Denied | Tucson Electric Power Company (TEP) has reviewed the final plats. TEP is unable to approve these plats at this time. In order for this Company to approve the final plats, the following will be required. * Village 2 - 10' x 10' easements are required for the following equipment: the transformer and junction cabinet north of Lot 1 and the junction cabinet south of Lot 45. Show all requested easements on the resubmittals of the final plats. Submit two bluelines of each plat to the City of Tucson for TEP's final approval. Please contact me at (520) 917-8745 if you have any questions. Liza Castillo Land Management Tucson Electric Power Company lcastillo@tep.com Office: (520) 917-8745 Cell Phone: (520) 904-2668 Fax: (520) 917-8700 |
| 01/07/2005 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed | |
| 12/21/2004 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 12/29/2004 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approv-Cond | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S04-077 SYCAMORE PARK – VILLAGE 2 / REVISED FINAL PLAT DATE: DECEMBER 27, 2004 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. On final Mylar 1: All books and pages must be filled in. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** |