Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S04-053
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S04-053
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/09/2005 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
12/19/2005 ELIZABETH EBERBACH ENGINEERING REVIEW Approv-Cond DATE: December 19, 2005
TO: Patricia Gehlen; CDRC Coordinator
SUBJECT: Rio Nuevo Mercado Final Plat 3rd Re-submittal Engineering Review
LOCATION: T14S R13E Section 14
REVIEWER: Elizabeth Eberbach
ACTIVITY NUMBER: S04-053

SUMMARY: The revised Final Plat, an original copy of the revised CC&R's, closure calculation sheet, email correspondence, response letter, and exhibit B were received by Engineering on December 13, 2005. Engineering has reviewed the received items and recommends conditional approval of the Final Plat.

FINAL PLAT CONDITIONS OF APPROVAL:
1) City of Tucson Development Standards (DS) Section No.7-01.4, DS Sec.2-03.6.4.A, and DS Sec.2-03.2.3.C: The following may be done right before the mylar is goes to Mayor and Council. Fill in the blanks for:
a) General Note 29 for the dkt/pg for recorded abandonment for the existing 20-ft Sewer Easement Bk5524 pg501.
b) In the Dedication section, provide ordinance number regarding property and easement interest.
2) DS Sec.2-03.6.5.C: Address the following drafting or survey data comments on the mylar:
a) On sheet 5, clarify floating crow's feet near southeast corner of project near text (89.36') in Commercial Block 'D'.
b) Tie the 10' electrical easement to boundary on sheet 5 or sheet 4.
c) On sheet 5, text near the southwest portion of lot 82 is unclear. Assure that any crow's feet and distances are legible in this area.
d) On sheet 1, there are two Beneficiary statements; correct redundancy; there should be a beneficiary statement as one of the last elements of the Dedication.
3) Clarify any redundancy, combine, or clarify in response letter General Notes: 14, 15, 25, and 27.
4) Tucson Code Sec.29-23.A.5, DS Sec.2-03.6.2: The engineer's certification shall be included on the plat stating that the plat was reviewed by the certifying engineer for Landfill compliance and that the landfill information shown on the plat were prepared (or supervised etc.) by the certifying engineer.
5) DS Sec.2-03.7.1.B: Provide seal and signature for engineer on sheets 4 and 5.
6) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the complete package of the financial assurances are updated, received, compared with the mylar, and accepted. It will be necessary to pick up the original assurances at the CDRC office, make corrections, and return the one set of the fully compiled package to CDRC office.
a) Per a recent policy, the following language is to be made part of the list of assurable items contained in the Third Part Land Trust Agreement: "All applicable fees, e.g. permit fees, impact fees must be paid in full to the City of Tucson prior to the final release of subdivision assurances." Revise the assurable items list.
b) Add that the following assurable item to Exhibit B of the list of assurable items: all off-site and on-site improvements as shown on Tentative Plat, Final Plat and improvement plans.
c) Check to see that the Exhibit A of the Agreement to Construct reflects the current boundary data, as the closure calculations do not match this exhibit.
d) Replace the schedule B's in the original assurance package with a current schedule B.
e) Replace the old list of assurables with the current copy that is revised per 4a (above).
f) Make sure all parts of the assurance package is returned, including:
i) revised AGREEMENT TO CONSTRUCT SUBDIVISION IMPROVEMENTS
ii) copy of the original Trust Agreement
iii) AMENDMENT TO TRUST
iv) The copy of a sample Warranty Deed
i) most current title report
7) Regarding the November 16, 2005 original CC&R's, the drainage verbiage is acceptable. Provide attachment Exhibit A as referenced on page 2.
8) Please pick up the original CC&R's when you pick-up the original assurances. Provide the revised compiled assurance package and original complete CC&R's before or at time of mylar submittal.

Submit to CDRC the revised Final Plat mylar, original signed copy of the CC&R's, one set of the revised complete original assurance package, and response letter with the mylar submittal. If you have any questions, please call me at 791-5550 extension 2204.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services
12/29/2005 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Approv-Cond `COMMUNITY DESIGN REVIEW COMMITTEE
CITY OF TUCSON - DEVELOPMENT SERVICES

December 29, 2005

David Little
WLB Group
4444 East Broadway Blvd.
Tucson, AZ 85711

Subject: S04-053 Rio Nuevo Mercado District Final Plat

Dear David:

The above referenced project has been CONDITIONALLY APPROVED by the Community Design Review Committee. Please make the any necessary corrections and submit the following documents:

(2) Title reports current within the last (30) days.
(1) Executed Final Plat Double Matte Océ or Photo Mylar.
(1) * Check made to "Reproductions, Inc." in the amount of $8.50 per plat page for Mayor & Council distribution.
(1) * Check made to "Reproductions, Inc." in the amount of $55.00 per plat page for recorded plat distribution.
(1) Check made to "Pima County Recorder" in the amount of $20.00 per plat page plus a $4.00 handling fee, along with CC&R fees if applicable. CCR fees are $9.00 for the first 5 pages and $1.00 for each additional page.
(1) Executed and notarized CC&Rs (if applicable).

*Please do not combine the checks for "Reproductions, Inc.". They are processed at different times and require separate checks. An account number is also acceptable.

Assurances (if applicable) must be reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CCR's and assurances must be approved at the same Mayor and Council Meeting. Please expect 3 -4 weeks from the date submitted to the date scheduled for Mayor and Council approval.

MYLARS MUST BE REVIEWED AND APPROVED BY PIMA COUNTY WASTEWATER PRIOR TO SUBMITTAL TO CITY OF TUCSON CDRC OFFICE.

Sincerely,


Patricia Gehlen
CDRC Manager
All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/
Via fax: 881-5313