Plan Number: S04-050
Parcel: Unknown

Address: Unknown

Review Status: Completed

Review Details: RESUBMITTAL- OTHER SUBDIVISION REVIEW

Plan Number - S04-050
Review Name: RESUBMITTAL- OTHER SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/18/2004 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
08/19/2004 JIM TATE ENGINEERING REVIEW Denied TO: Craig Gross; CDRC Coordinator
DATE: August 19, 2004

SUBJECT: Second engineering review of the Winstel Apartments Final Plat. The activity number is S04-050.

SUMMARY: The Final Plat was received by Engineering on August 19, 2004. Engineering has reviewed the received item and does not recommend approval of the Final Plat

RESUBMITTAL REQUIRED: FP

SUBMITTAL REQUIRED: ASSURANCES

The next submittal must address the following items:

FINAL PLAT

1. Include the Assurance Package with the next Final Plat submittal. This package must include the original Third Party Trust, the original Amendment to Trust, a copy of the Trust Agreement, a copy of the Deed, and a recent Title Report. (Previous review comment)

2. Include the Beneficiary Paragraph as specified in DS 2-03.6.3.C . (Previous review comment)

3. Seal the plans and remove the "preliminary" notations. . (Previous review comment)

4. The legend must show and describe all symbols and lines shown on the plat. The legend shows a linetype used for, "exist. center line". This line is used on the plat for street centerline and also existing easement centerline (?). Centerlines of easements are not required but may be included if properly identified. Distances and bearings of existing easements are not required (with recordation information provided, which it is). DS 2-03.6.1.L (Previous review comment)

5. Spell Bellevue correctly. (Previous review comment)

6. At least one corner of the subdivision must be tied by course and distance to a section corner, a quarter section corner, or an established City or County survey monument. The plat must include a description of the corner marker. Corner tie recordation information is to be provided on the plat. DS 2-03.6.5.A (Previous review comment)

7. All proposed easements must be shown in a surveyable manner with dimensions, bearings, or deflection angles and radii, arcs, and central angles of all curves. The plat shows two access easements connected by a common line. One access easement showing bearings and distances for all easement lines would be sufficient. In any case, provide a bearing and distance for all easement lines. There are easement lines on the plat missing bearings and/or distances. (Previous review commetn)

8. A north arrow and scale must be included on sheet 2. They were included on the first submittal, but dropped from this second submittal. DS 2-03.6.1.I




TO: Craig Gross; CDRC Coordinator DATE: August 19, 2004

SUBJECT: Second engineering review of the Winstel Apartments Final Plat. The activity number is S04-050.

SUMMARY: The Final Plat was received by Engineering on August 19, 2004. Engineering has reviewed the received item and does not recommend approval of the Final Plat

RESUBMITTAL REQUIRED: FP

SUBMITTAL REQUIRED: ASSURANCES

The next submittal must address the following items:

FINAL PLAT

1. Include the Assurance Package with the next Final Plat submittal. This package must include the original Third Party Trust, the original Amendment to Trust, a copy of the Trust Agreement, a copy of the Deed, and a recent Title Report. (Previous review comment)

2. Include the Beneficiary Paragraph as specified in DS 2-03.6.3.C . (Previous review comment)

3. Seal the plans and remove the "preliminary" notations. . (Previous review comment)

4. The legend must show and describe all symbols and lines shown on the plat. The legend shows a linetype used for, "exist. center line". This line is used on the plat for street centerline and also existing easement centerline (?). Centerlines of easements are not required but may be included if properly identified. Distances and bearings of existing easements are not required (with recordation information provided, which it is). DS 2-03.6.1.L (Previous review comment)

5. Spell Bellevue correctly. (Previous review comment)

6. At least one corner of the subdivision must be tied by course and distance to a section corner, a quarter section corner, or an established City or County survey monument. The plat must include a description of the corner marker. Corner tie recordation information is to be provided on the plat. DS 2-03.6.5.A (Previous review comment)

7. All proposed easements must be shown in a surveyable manner with dimensions, bearings, or deflection angles and radii, arcs, and central angles of all curves. The plat shows two access easements connected by a common line. One access easement showing bearings and distances for all easement lines would be sufficient. In any case, provide a bearing and distance for all easement lines. There are easement lines on the plat missing bearings and/or distances. (Previous review commetn)

8. A north arrow and scale must be included on sheet 2. They were included on the first submittal, but dropped from this second submittal. DS 2-03.6.1.I
08/19/2004 JIM EGAN COT NON-DSD FIRE Approved The Lot Split is approved August 19, 2004.
08/20/2004 JCLARK3 ENV SVCS REVIEW Approv-Cond Lot split approved with assurances that there will be an enclosure constructed for a 4 CY metal dumpsters on caster be constructed or an enclosure be constructed for a metal dumpster. Shared responsibility need to be in writing to ensure all understands the agreement of the service for the resubdivision of the properties.
08/27/2004 KAY MARKS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S04-050 WINSTEL APARTMENTS/REVISED MINOR SUBDIVISION
DATE: August 19, 2004



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

Change Fairmount Avenue to Street on pg. 2.

Change Bellvue Avenue to Bellevue Street on pg. 2.











jg
08/27/2004 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved -----Original Message-----
From: Castillo, Liza
Sent: Tuesday, August 24, 2004 10:20 AM
To: 'Craig Gross'
Cc: 'lmc.consulting@worldnet.att.net'
Subject: WINSTEL APARTMENTS, S04-050

SUBJECT: WINSTEL APARTMENTS
Lots 1-4
S04-050

The Final Plat for the subject project will meet this Company's easement requirements.
Please forward any resubmittals of the final plat to this office.

Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission.

Please contact me at (520) 917-8745 if you have any questions.



Liza Castillo
Land Management
Tucson Electric Power Company
lcastillo@tep.com
Office: (520) 917-8745
Cell Phone: (520) 904-2668
Fax: (520) 917-8700
08/31/2004 DAVID RIVERA ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department Plans Coordination Office
FROM: David Rivera Senior Planner

FOR: Patricia Gehlen
Principal Planner

PROJECT: S04-050
Winstel Apartments: Lots 1 -4
Final Plat - Minor Subdivision Review

TRANSMITTAL: August 31, 2004

DUE DATE: August 30, 2004

COMMENTS

1. An applicant has one (1) year from the date of approval of tentative plat to obtain approval of a final plat that complies with zoning and other development requirements in effect at the time of application. This final plat must be approved and recorded on or before May 18, 2005.

2. The minimum building setback required from interior lot lines is the greatest of 10 feet or three quarters the height of the structure. The building setbacks for buildings 4, 7, and 11 do not meet the minimum building setback of ten feet. The following setbacks must be approved through the lot development option process. (The building setbacks are to the new property lines.)

a. The proposed building setback from building 4 and the north property line is seven feet.

b. The proposed building setback from building 7 and the east property line is nine feet, eight inches.

c. The proposed building setback from building 11 and the west property line is nine feet, 4 inches.

In addition, please add to the plan a building setback from units two and three to the west property line.

(Previous Comment: Please address the following items. It is not clear if the building setbacks have been met. Please draw the existing structures on the plan. Label the building setbacks from the new property lines to the buildings. If the building setbacks cannot be met, the new property lines must be reconfigured or a lot development option will be required for each affected setback.)


If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.

DGR C:\planning\cdrc\finalplat\S04050fp2.doc
09/14/2004 CRAIG GROSS ZONING-DECISION LETTER REVIEW Completed
09/14/2004 CRAIG GROSS ZONING-RECORDATION REVIEW Passed
09/14/2004 FRODRIG2 PIMA COUNTY WASTEWATER Approved September 14, 2004

TO: Larry McGlone, Larry McGlone Consulting, Inc.

THRU:


FROM: ____________________________________
representing the Pima County
Departments of Wastewater Management and Environmental Quality

SUBJECT: Winstel Apartments
- Submittal
S04-050


The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


The Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the development plan as submitted.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.


If you wish to discuss the above comments, please contact me at the phone number provided above, under my signature.