Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: S04-033
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - FINAL PLAT REVIEW

Plan Number - S04-033
Review Name: RESUBMITTAL - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/27/2005 TIM ROWE PIMA COUNTY WASTEWATER Approved January 24, 2005

To: James King, Rick Engineering

Thru: Craig Gross, CDRC Manager
City of Tucson Development Services Department

____________________________________
From: Tim Rowe, P.E (520-740-6563) representing the Pima County
Departments of Wastewater Management and Environmental Quality

Subject: Rita Ranch Crossing, Lots 1-47 And Common Areas A-C
Final Plat - 1st Submittal
S04-033


The proposed sewer collection lines for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.


The three signed and notarized orginals of the Sewer Service Agreement have been received by this office and transmitted to the Pima County Wastewater Management Department for further processing.

Subject to the remaining items in my September 8, 2004 review letter for the above referenced transmittal, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.


If you have any questions regarding the above mentioned comments, please contact me at the telephone number shown under my signature on the first page of this letter.
10/12/2004 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
10/18/2004 KAY MARKS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

KAY MARKS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: KAY MARKS, ADDRESSING OFFICIAL
SUBJECT: S04-033 PEPPER VINER AT RITA / REVISED FINAL PLAT
DATE: OCTOBER 18, 2004



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.


***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through the Pima
County Subdivision Coordinator. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***
10/20/2004 LOREN MAKUS ENGINEERING REVIEW Approv-Cond DATE: October 20, 2004
TO: Craig Gross; CDRC Coordinator
SUBJECT: Pepper Viner at Rita Final Plat Engineering Review
REVIEWER: Loren Makus
ACTIVITY NUMBER: S04-033

Resubmittal Required: Submit a corrected Final Plat.

SUMMARY: The Final Plat has been reviewed by Development Services Department Engineering Division. We do not recommend approval of the Final Plat at this time. The Final Plat and assurances must be revised before approval.

1. The Final Plat cannot be approved until the Tentative Plat has been approved. Additional comments may be forthcoming after the Tentative Plat has been approved.

2. The complete assurances package must include a copy of the original trust, the original amendment to trust with exhibit A, the original agreement to construct with exhibit B, a copy of the warranty deed, a current title report and a location map on an 8 ½ x 11 sheet.


If you have any questions call me at 791-5550, extension 1161 or email me at loren.makus@tucsonaz.gov.

Loren Makus, E.I.T.
Senior Engineering Associate
Engineering Division
Development Services
10/25/2004 CRAIG GROSS ZONING-DECISION LETTER REVIEW Completed
10/25/2004 DAN CASTRO ZONING REVIEW Approv-Cond COMMENTS
CODE SECTION/ DEVELOPMENT STANDARD

1. An applicant has one (1) year from the date of approval of the tentative plat to obtain approval and recordation of a final plat that complies with zoning and other development requirements in effect at the time of application. Since the tentative plat for this subdivision has not yet been approved, the approval date for this final plat may not be determined. In addition, the final plat may not be approved prior to approval of the tentative plat. Since the tentative plat has not yet been approved, any revisions made to the tentative plat which effect the final plat must also be made to the final plat.
L.U.C. 4.1.7.3

2. The last tentative plat review on June 28, 2004 was for 48 lots. The final plat is proposed for 47 lots. A tentative plat revision will be required.
D.S. 2-03.6.2.B

If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608.