Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: S04-033
Parcel: Unknown

Review Status: Completed

Review Details: ASSURANCES

Plan Number - S04-033
Review Name: ASSURANCES
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/10/2004 MARILYN KALTHOFF START ASSURANCES RECEIVED Completed
08/10/2004 MATT FLICK ENGINEERING FOR ASSIGNMENT Completed One copy of the assurances placed in the final plat submittal package.
08/31/2004 SUE MONTES CDRC STAFF ASSURANCES RECEIVED Needs Review
08/31/2004 LOREN MAKUS ENGINEERING REVIEW Denied One copy of the assurances placed in the final plat submittal package.
08/31/2004 LMAKUS1 CDRC STAFF CITY ATTORNEY'S OFFICE Needs Review
08/31/2004 LOREN MAKUS ENGINEERING REVIEW Denied DATE: August 31, 2004
TO: Craig Gross; CDRC Coordinator
SUBJECT: Pepper Viner at Rita Final Plat Engineering Review
REVIEWER: Loren Makus
ACTIVITY NUMBER: S04-033

Resubmittal Required: Submit a corrected Final Plat.

SUMMARY: The Final Plat has been reviewed by Development Services Department Engineering Division. We do not recommend approval of the Final Plat at this time. The Final Plat and assurances must be revised before approval.

1. The Final Plat cannot be approved until the Tentative Plat has been approved. Additional comments may be forthcoming after the Tentative Plat has been approved.

2. Revise the common area designation for the retention basin (Common Area B) so that it is described as a Retention/Detention Basin.

3. Provide a note dedicating the public streets.

4. Revise the Beneficiary Statement so that it matches the trust.

5. The name of the subdivision on the Tenative and Final Plats is different than the name of the subdivision in the CCR&Rs and assurances documents. Revise the submittals so that all of the documents have the same name for the subdivision.

6. The complete assurances package must include a copy of the original trust, the original amendment to trust with exhibit A, the original agreement to construct with exhibit B, a copy of the warranty deed, a current title report and a location map on an 8 ½ x 11 sheet.

7. Revise the Amendment to Trust and the Agreement to Construct to match the Final Plat title block.

8. Revise the CC&Rs to include the requirements of Development Standard 10-02 (Standards Manual for Drainage Design and Floodplain Management in Tucson, Arizona) Section 14.3.2.

If you have any questions call me at 791-5550, extension 1161 or email me at loren.makus@tucsonaz.gov.

Loren Makus, E.I.T.
Senior Engineering Associate
Engineering Division
Development Services