Plan Review Detail
Review Status: Completed
Review Details: ASSURANCES
Plan Number - S04-033
Review Name: ASSURANCES
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/10/2004 | MARILYN KALTHOFF | START | ASSURANCES RECEIVED | Completed | |
| 08/10/2004 | MATT FLICK | ENGINEERING | FOR ASSIGNMENT | Completed | One copy of the assurances placed in the final plat submittal package. |
| 08/31/2004 | SUE MONTES | CDRC STAFF | ASSURANCES RECEIVED | Needs Review | |
| 08/31/2004 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | One copy of the assurances placed in the final plat submittal package. |
| 08/31/2004 | LMAKUS1 | CDRC STAFF | CITY ATTORNEY'S OFFICE | Needs Review | |
| 08/31/2004 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | DATE: August 31, 2004 TO: Craig Gross; CDRC Coordinator SUBJECT: Pepper Viner at Rita Final Plat Engineering Review REVIEWER: Loren Makus ACTIVITY NUMBER: S04-033 Resubmittal Required: Submit a corrected Final Plat. SUMMARY: The Final Plat has been reviewed by Development Services Department Engineering Division. We do not recommend approval of the Final Plat at this time. The Final Plat and assurances must be revised before approval. 1. The Final Plat cannot be approved until the Tentative Plat has been approved. Additional comments may be forthcoming after the Tentative Plat has been approved. 2. Revise the common area designation for the retention basin (Common Area B) so that it is described as a Retention/Detention Basin. 3. Provide a note dedicating the public streets. 4. Revise the Beneficiary Statement so that it matches the trust. 5. The name of the subdivision on the Tenative and Final Plats is different than the name of the subdivision in the CCR&Rs and assurances documents. Revise the submittals so that all of the documents have the same name for the subdivision. 6. The complete assurances package must include a copy of the original trust, the original amendment to trust with exhibit A, the original agreement to construct with exhibit B, a copy of the warranty deed, a current title report and a location map on an 8 ½ x 11 sheet. 7. Revise the Amendment to Trust and the Agreement to Construct to match the Final Plat title block. 8. Revise the CC&Rs to include the requirements of Development Standard 10-02 (Standards Manual for Drainage Design and Floodplain Management in Tucson, Arizona) Section 14.3.2. If you have any questions call me at 791-5550, extension 1161 or email me at loren.makus@tucsonaz.gov. Loren Makus, E.I.T. Senior Engineering Associate Engineering Division Development Services |