Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S04-032
Parcel: Unknown

Review Status: Completed

Review Details: ASSURANCES

Plan Number - S04-032
Review Name: ASSURANCES
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/09/2005 MARILYN KALTHOFF START ASSURANCES RECEIVED Completed
03/10/2005 MATT FLICK ENGINEERING FOR ASSIGNMENT Completed Received copy of Agreement and Amendment and forwarded to Laith for review.
03/10/2005 MATT FLICK ENGINEERING FOR ASSIGNMENT Completed Laith Alshami, Engineering and Floodplain Review, 03/15/2005

SUBJECT: Tanque Verde Center
S04-032, T13S, R15E, SECTION 32

RECEIVED: Final Plat, Assurances and CC & R's on March 10, 2005

The subject project has been reviewed. We offer the following comments:

Final Plat:

1. The underground retention basins should be given a different common area label and the basin outlines should be shown in a surveyable manner. The purpose of this comment is to minimize any possible damage to the basins if construction/excavation work is required, in the future, in the common areas where the underground basins are located (D.S. 2-03.6.4.I.). Additionally, detention/retention areas should be called out on the plat.
2. Label Paseo Rancho Esperanza as a "Private Access and Public Utility Easement" and provide the recordation information.
3. The recorded easements in the Title Report and shown on the Rancho Esperero Final Plat, do not appear to match the information on the subject project Final Plat. Revise as needed.

CC & R's

The CC & R's are acceptable pertaining to Engineering and Floodplain.

Assurances:

The Assurances are acceptable. Submit the original assurance documents with the Final Plat Mylar

Prepare a detailed response that explains the revisions that were made and references the exact location in the drainage report and on the Tentative Plat where the revisions were made.


RESUBMITTAL REQUIRED: Revised Final Plat
03/15/2005 LAITH ALSHAMI ENGINEERING REVIEW Completed
03/15/2005 VICTOR DURAND ENGINEERING ASSURANCES RECEIVED/SENT TO CITY ATTORNEY Completed