Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT REVIEW
Plan Number - S04-032
Review Name: FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2005 | MARILYN KALTHOFF | START | PLANS SUBMITTED | Completed | |
01/06/2005 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | 201 N. STONE AV., 1ST FL TUCSON, AZ 85701-1207 KAY MARKS ADDRESSING OFFICIAL PH: 740-6480 FAX #: 740-6370 TO: CITY PLANNING FROM: KAY MARKS, ADDRESSING OFFICIAL SUBJECT: S04-032 TANQUE VERDE PLACE / FINAL PLAT DATE: JANUARY 6, 2005 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through the Pima County Subdivision Coordinator. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** |
01/12/2005 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | SUBJECT: Tanque Verde Center S04-032, T13S, R15E, SECTION 32 RECEIVED: Final Plat, Assurances and CC & R's on January 04, 2005 The subject project has been reviewed. We offer the following comments: Final Plat: 1. Include the "Printed Name and Signature" lines associated with the "Dedication". 2. Provide the Basis of Bearing description as required by D.S. 2-03.6.5.C. 3. Add the "There will be no further division …" General Note as required by D.S. 2-03.6.2.H. 4. Add the "Any relocation, modification, etc., of existing utilities…" General Note as required by D.S. 2-03.6.2.I. 5. Remove the SVT's from the Final Plat. There is no need to show them. 6. It is not clear what SVC and SVL stand for. Explain. 7. It appears that the Public Water Easement encroaches on the proposed lots. Verify if that causes a conflict with the proposed buildings. 8. The proposed Common Areas labels do not match the labels shown in the Title Block. Revise. 9. In order to expedite the plat review and approval, provide the boundary survey and closure calculations report in accordance with D.S. 2-03.6.5.C.3. 10. The underground ground retention basins should be given a different common area label and the basin outlines should be shown in a surveyable manner (D.S. 2-03.6.4.I.). Additionally, detention/retention areas should be specified on the plat. 11. Submit a recent Title Report. 12. The solid circle symbol is shown in the Legend as "set rebar". Yet on sheet 3, it is labeled as "found" (refer to South ¼ corner of Section 32 and the next point, about 74.78' north of it). CC & R's 1. Provide an index for the CC & R's. 2. Drainage facilities including detention/retention basin maintenance is not specifically addressed. Revise the document accordingly. This Office recommends including the maintenance checklist in the CC & R's to allow the owners' association access to it and to facilitate their maintenance responsibility. Assurances: 1. The project name should match exactly the name in Final Plat Title Block including the common area descriptions (i.e. on the original Third Party Trust agreement and the Amendment". 2. Exhibit "A" should describe the project exactly as it is shown in Final Plat Title Block. 3. Exhibit "B" should include the correct S04-XXXX number. 4. Check to see if there is a "Special Warranty Deed" document that should be included in the Assurances. 5. Include a recent Title Report with the Assurances documents. 6. The Amendment should include Exhibit "A". Prepare a detailed response that explains the revisions that were made and references the exact location in the drainage report and on the Tentative Plat where the revisions were made. RESUBMITTAL REQUIRED: Revised Final Plat, Assurances and CC & R's |
01/25/2005 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: TANQUE VERDE CENTER S04-032 Tucson Electric Power Company has reviewed and approved the final plat for this project. As you are aware there are existing facilities within the boundaries of this project, any relocation costs will be billable to the developer. Please submit a final set of plans including electrical load plans, to determine how TEP will serve this commercial development. If easements are required, they will be secured by separate instrument. Submit you plans a minimum of six (6) weeks prior to requiring service. Your final plans should be sent to: Matthew Eaton Design/Build- DS 301 Tucson Electric Power Company P. O. Box 711 Tucson, AZ 85702 Liza Castillo Land Management Tucson Electric Power Company lcastillo@tep.com Office: (520) 917-8745 Cell Phone: (520) 904-2668 Fax: (520) 917-8700 |
02/07/2005 | FRODRIG2 | PIMA COUNTY | WASTEWATER | Approved | February 3, 2005 TO: Chuck Martin Rick Engineering Company THRU: Craig Gross City of Tucson, Development Services Department FROM: Dickie Fernández, E.I.T. Pima County Development Services Department Development Review Division (Wastewater) SUBJECT: Tanque Verde Place, Lots 1-58 and Common Areas A, B & C Final Plat – 1st Submittal S04-032 The proposed sewer collection lines to serve the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Wastewater Management Department (PCWMD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. A private Sewer Service Agreement for the proposed number of lots has been sent to your office. After three original Sewer Service Agreements have been signed by the Owner of Record, the three originals should be returned to Pima County Wastewater Management in order to satisfy the necessary requirements needed to approve the Mylars of the final plat. Subject to the above, the Pima County Department of Environmental Quality and Wastewater Management Department hereby approve the above referenced submittal of the final plat. The required revision(s) may be shown on the Mylars. Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Department of Environmental Quality. Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution. If you have any questions regarding the above mentioned comments, please contact me. Sincerely, Dickie Fernández, E.I.T. Telephone: (520) 740-6947 Copy: Project |
02/08/2005 | DAVID RIVERA | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: S04-032 Tanque Verde Center, Lots 1-58, Common Areas "A", "B", "C" Final Plat TRANSMITTAL: February 8, 2005 DUE DATE: February 1, 2005 COMMENTS: 1. An applicant has one (1) year from the date of approval of tentative plat to obtain approval of a final plat that complies with zoning and other development requirements in effect at the time of application. This final plat must be approved and recorded on or before December 9, 2005. 2. Drawn and label the City of Tucson and Pima County jurisdiction limits. Also label "Tanque Verde Wash". DS 2-03.6.1.D.4 3. Add the following as a general note. "There will be no further division of lots without the expressed approval of the City of Tucson". DS 2-03.6.2.H 4. Replace in all text blocks all references to 2004 with 2005. DS 2-03.6.3.D 5. Please insure that the water easements that are depicted do not affect the placement of the proposed buildings. If so adjust the locations of the easements to allow for placement of future buildings. Please revise the common area designations to match the title block or the as labeled on the drawing. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. DGR C:\planning\cdrc\finalplat\S04032fp.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat |
02/08/2005 | FRODRIG2 | COT NON-DSD | REAL ESTATE | Denied | Record water easement and fill in Docket in Page on final plat. |
02/08/2005 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559 FROM: Ed Abrigo, Mapping Supervisor Pima County Assessor’s Office Mapping Department DATE: January 25, 2005 RE: Assessor’s Review and Comments Regarding Final Plat S04-032 Tanque Verde Center T131532 (114-46) * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor’s Office requirements. _______ Plat does not meet Assessor’s Office requirements. COMMENTS: Thank you for your submittal. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. Susan King |
02/09/2005 | CRAIG GROSS | ZONING-DECISION LETTER | REVIEW | Completed |